Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 45056: 2002-037-00 EXP ACCORD FRESHWATER MUSSELS IN UMATILLA & JOHN DAY
Project Number:
Title:
Freshwater Mussel Research and Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
45056
Contract Title:
2002-037-00 EXP ACCORD FRESHWATER MUSSELS IN UMATILLA & JOHN DAY
Contract Continuation:
Previous: Next:
39850: 2002-037-00 EXP FRESHWATER MUSSELS IN THE UMATILLA AND JOHN DAY
  • 50406: 2002-037-00 EXP ACCORD FRESHWATER MUSSELS IN UMATILLA & JOHN DAY
Contract Status:
Closed
Contract Description:
This contract for FY2010 is approved under the Columbia Basin Fish Accords 10 year MOA with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR).   Since its inception in 2003, the Freshwater Mussel Project of the CTUIR has conducted research designed to understand the biology and ecology of freshwater mussels. Specifically, the project has focused on three main components designed to determine: 1) the status and distribution of freshwater mussels in CTUIR Tribal lands; (2) factors controlling the distribution and abundance of mussels, and (3) whether genetic differences exist among western freshwater mussel species in the Columbia River basin.  The long-term goal of this project has been to restore freshwater mussels to the Umatilla River basin as part of ongoing efforts to rebuild ecosystem diversity, function, and traditional cultural opportunities in the basin.

Freshwater mussels in western North America (Genera Anodonta, Margaritifera, and Gonidea) are notoriously understudied, although they have historically been a major component of the biomass in western aquatic systems and likely have a disproportionately large impact on ecological stability and processes in these systems.  Recently BPA and CTUIR have funded pioneering work on the genetic composition and taxonomy of western freshwater mussels.  Now that the basic genetic subdivisions and landscape patterns of genetic variance have been described for these groups of mussels, studies on habitat requirements and ecological roles can be designed appropriately.  Such studies are critical for effective monitoring, conservation, and restoration programs.  

CTUIR is interested in conserving freshwater mussels and restoring viable populations in the context of “First Foods” resource management on Tribal and ceded lands.  One of the major goals of CTUIR is to restore sustainable populations of freshwater mussels to the Umatilla River system.  The John Day and Walla Walla River systems, on ceded lands, contain large populations of freshwater mussels, and are a high priority for conservation.  These river systems (particularly the John Day) also provide opportunities to study the distribution, habitat requirements, and ecosystem functions of freshwater mussels.  Conclusions drawn from the distribution of mussels in this system can inform restoration efforts in other rivers , such as the Umatilla.
Account Type(s):
Expense
Contract Start Date:
10/01/2009
Contract End Date:
09/30/2010
Current Contract Value:
$234,354
Expenditures:
$234,354

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Provide appropriate environmental compliance materials A: 165. Provide Environmental Compliance documentation for mussel project 09/23/2010 09/23/2010
Submit data to CTUIR's central database B: 159. Submit data to CTUIR central database 09/30/2010 09/30/2010
Determine host fish for three western freshwater mussel genera. C: 157. Fish Host Experiment 09/30/2010 09/30/2010
Determine host fish for two western freshwater mussel genera D: 162. Analyze results of host fish experiments 09/28/2010 09/28/2010
Monitor translocated mussels in Umatilla River E: 157. Monitor translocated mussels in Umatilla River 09/30/2010 09/30/2010
Monitor mussel populations in the John Day River system F: 157. Implementation of long-term freshwater mussel monitoring program 09/30/2010 09/30/2010
Construct predictive model for mussel occurrence to aid in mussel restoration and relocation e G: 162. Characterize western freshwater mussels habitat relationships 09/30/2010 09/30/2010
Attach Progress Report in Pisces H: 132. Submit Progress Report for the period Oct 2004 to Sep 2007 03/01/2010
Attach Progress Report in Pisces I: 132. Submit Progress Report for the period Oct 2007 to Sep 2008 12/01/2009 12/01/2009
Attach Progress Report in Pisces J: 132. Submit Progress Report for the period Oct 2008 to Sep 2009 07/01/2010
Manage and administer Freshwater Mussel project K: 119. Project Management for mussel project 09/30/2010 09/30/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Freshwater Mussels
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide Environmental Compliance documentation for mussel project 02/09/2007
B 159 Submit data to CTUIR central database 02/09/2007
C 157 Fish Host Experiment 09/08/2010
D 162 Analyze results of host fish experiments 02/09/2007
E 157 Monitor translocated mussels in Umatilla River 09/08/2010
F 157 Implementation of long-term freshwater mussel monitoring program 09/08/2010
G 162 Characterize western freshwater mussels habitat relationships 10/01/2009
H 132 Submit Progress Report for the period Oct 2004 to Sep 2007 10/01/2009
I 132 Submit Progress Report for the period Oct 2007 to Sep 2008 10/01/2009
J 132 Submit Progress Report for the period Oct 2008 to Sep 2009 10/01/2009
K 119 Project Management for mussel project 02/09/2007
L 185 Periodic Status Reports for BPA 02/09/2007