Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 45472: 199602000 EXP PSMFC CSS COMPONENT FY10
Project Number:
Title:
Comparative Survival Study (CSS)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
45472
Contract Title:
199602000 EXP PSMFC CSS COMPONENT FY10
Contract Continuation:
Previous: Next:
40338: 199602000 EXP PSMFC CSS COMPONENT 09
  • 50554: 199602000 EXP PSMFC CSS COMPONENT FY11
Contract Status:
Closed
Contract Description:
The Comparative Survival Rate Study (CSS) is a multi-year program of the fishery agencies and tribes to measure the smolt-to-adult survival rates of hatchery and wild spring/summer Chinook and summer steelhead from representative sites in the Snake, Mid-Columbia, and lower Columbia River basins.  An interagency CSS Oversight Committee oversees the design, execution, and analysis of this study.  The CSS is entering its 14th  year of operation.  The CSS participates with state and federal fishery agencies in the PIT-tagging of wild Chinook and steelhead at traps in the Snake River basin above Lower Granite Dam and will begin participating with WDFW in the PIT-tagging of wild Chinook and steelhead at two traps in the Wenatchee River basin in 2010.  The CSS participates with state and federal fishery agencies (including the Lower Snake River Compensation Program and Idaho Power Company) in the PIT-tagging of hatchery Chinook and steelhead at hatchery facilities for planned releases into the Snake River basin above Lower Granite Dam.  The CSS coordinates with these agencies and plus tribal fishery agencies in the pre-assigning of PIT-tagged fish to “Monitor-mode” and “Return-to-River mode” categories.  In addition, wild Chinook and steelhead PIT tagged for other studies in the Snake River basin and upper Columbia River basin (e.g., Yakima, Wenatchee, Entiat, Methow, and Okanogan rivers) and middle Columbia River basin (e.g., Walla Walla, Umatilla, John Day, Deschutes, Hood and Wind rivers) will be utilized whenever possible to meet CSS requirements.  

Smolt-to-adult survival rates for Snake River basin wild and hatchery Chinook and wild steelhead that were transported will be compared with those that migrated in-river to below Bonneville Dam.  Estimates of smolt-to-adult survival rates will be made from Lower Granite Dam back to Lower Granite Dam for Snake River stocks, McNary Dam back to Bonneville Dam for upper Columbia River stocks, and either John Day Dam or Bonneville Dam back to Bonneville Dam for middle Columbia River stocks depending on release location.  When possible, SARs from hatchery as smolt back to the hatchery racks are also generated.  In addition, migration speed and conversion rates will be made for returning adult fish between dams with adult detectors present (e.g., Bonneville, McNary, Ice Harbor, Lower Granite, Priest Rapids, Rock Island and Wells dams).  The returns to the hatchery rack will be adjusted for any sport and tribal harvest to provide an estimate of total return to the hatchery.  These survival rates may be used in the evaluations of smolt mitigation measures such as flow augmentation, spill, and transportation for the recovery of listed salmon stocks.  

For this study, hatchery Chinook are sampled from regular hatchery production and implanted with a PIT (Passive Integrated Transponder) tag, which allows unique identification of each fish.  The wild Chinook and wild steelhead are sampled at tributary traps and also PIT tagged.  Beginning in 2006, the CSS adopted the pre-assignment protocol whereby PIT-tagged fish are randomly assigned to either a “Monitor-Mode” group or “Return-to-River Mode” group prior to release.  Currently, the latter group is the default  PIT-tag action at the collector dams. When PIT tagged study fish arrive at a transportation collector dam and enter the collection/bypass channel during the transportation season, it will be transported along with the untagged fish if in the “Monitor-Mode” group or simply bypassed back to river if in the default action group.  The “Monitor-Mode” PIT-tagged fish directly reflect the untagged fish population experience in passing each collector dam.  The default PIT-tagged fish would reflect a non-transportation management scenario.  A combination of these two groups is used for in-river reach survival estimation with the Cormack-Jolly-Seber capture-recapture method.

The CSS is designed to address the following objectives:  (i) estimate and compare the smolt-to-adult survival rate (SAR) for transported and non-transported wild and hatchery stream type Chinook and Steelhead;  (ii) determine if the overall annual SAR rates are significantly different from the interim SAR hydro goal;  (iii) compare the overall annual SARs of representative stocks from the Snake, Upper Columbia, and Middle Columbia river basins; and (iv) estimate ratios of SARs for transported and inriver migrating smolts as well as in-river survival rates concurrently over a number of years in order to span a wide range of environmental conditions.
Account Type(s):
Expense
Contract Start Date:
12/01/2009
Contract End Date:
11/30/2010
Current Contract Value:
$315,801
Expenditures:
$315,801

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Grant
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Briana Anderson Fish Passage Center Yes Administrative Contact banderson@fpc.org (503) 230-4099
Michael Arredondo Pacific States Marine Fisheries Commission No Contract Manager marredondo@psmfc.org (503) 595-3100
Thomas Berggren Columbia Basin Fish and Wildlife Foundation No Interested Party
Richard (ODFW) Carmichael Oregon Department of Fish and Wildlife No Interested Party richard.w.carmichael@state.or.us (541) 962-3777
Michele DeHart Fish Passage Center No Supervisor mdehart@fpc.org (503) 833-3901
Israel Duran Bonneville Power Administration No Env. Compliance Lead induran@bpa.gov (503) 230-3967
Margaret Filardo Fish Passage Center Yes Interested Party mfilardo@fpc.org (503) 230-4286
James Geiselman Bonneville Power Administration Yes Interested Party jrgeiselman@bpa.gov (503) 230-5732
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Brian Jonasson Oregon Department of Fish and Wildlife No Interested Party brian.c.jonasson@state.or.us (541) 962-3763
Pam Kahut Pacific States Marine Fisheries Commission No Administrative Contact pam_kahut@psmfc.org (503) 595-3100
Rosemary Mazaika Bonneville Power Administration Yes F&W Approver rxmazaika@bpa.gov (503) 230-5869
Chris McCarty Fish Passage Center Yes Interested Party cmccarty@fpc.org (503) 833-3900
Jason Sweet Bonneville Power Administration No Interested Party jcsweet@bpa.gov (503) 230-3349
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
ESA applications and permits. A: 165. ESA Permit 01/04/2010 01/04/2010
Trap Installation B: 70. IDFG - Installation of Clearwater River Fish Trap 03/31/2010 03/31/2010
Pit Tag Steelhead & Chinook C: 158. IDFG - PIT tag steelhead & chinook at Idaho Hatcheries 11/29/2010 11/29/2010
PIT Tag wild Chinook and Steelhead D: 158. IDFG - PIT Tag Wild Spring Chinook and Wild Steelhead at Clearwater Trap 06/13/2010 06/13/2010
PIT Tag Wild Spring Chinook E: 158. IDFG - PIT Tag Wild Spring Chinook at the Salmon River Trap 06/09/2010 06/09/2010
PIT Tag Wild Spring/Summer Chinook F: 158. IDFG - PIT Tag Wild Spring Chinook at the Snake River Trap 06/13/2010 06/13/2010
PIT Tag Wild Chinook G: 158. IDFG - PIT Tag Wild Spring Chinook at IDFG Upper Tributary traps 11/30/2010 11/30/2010
Operate hatcheries & traps H: 157. IDFG - Operate Idaho Hatcheries, Snake, Salmon & Clearwater Traps 11/29/2010 11/29/2010
Tagging Status and Adult Return Report Completed by IDFG I: 162. IDFG - Hatcheries mark group data 11/29/2010 11/29/2010
Uploading & submission of data J: 159. IDFG - Submit files to PTAGIS database 11/29/2010 11/29/2010
2011 SOW, Budget & financial information K: 119. IDFG - Subcontract Administration 11/29/2010 11/29/2010
PIT Tag hatchery Chinook L: 158. ODFW - PIT tag Chinook at Lookingglass Hatchery 10/06/2010 10/06/2010
Tag Hatchery Steelhead M: 158. ODFW - PIT tag Steelhead at Irrigon Hatchey 06/14/2010 06/14/2010
Collect and tag wild Chinook N: 158. ODFW - PIT tag wild Chinook at Grande Ronde River Traps 06/13/2010 06/13/2010
Monitor and record tag loss & mortality O: 157. ODFW - Monitor/record tag loss & mortality at Lookingglass and Grand Ronde River trap 11/29/2010 11/29/2010
Survival Report Completed by ODFW P: 162. ODFW - Lookingglass Hatchery Migration Survival Data 11/29/2010 11/29/2010
Upload files to PTAGIS Q: 159. ODFW - Submit Files for Lookingglass and Lower Grande Ronde River Trap to PTAGIS database 11/29/2010 11/29/2010
2011 SOW and Budget, Invoice/financial information R: 119. ODFW - Subcontracts Administration 11/29/2010 11/29/2010
Pit Tag Steelhead S: 158. WDFW - PIT Tag Steelhead at the Lyons Ferry Hatchery 11/30/2010 11/30/2010
Uploading & submission of data T: 159. WDFW - Submit files to PITAGIS 11/30/2010 11/30/2010
Operate hatchery U: 157. WDFW - Operate Lyons Ferry Hatchery 11/30/2010 11/30/2010
2011 SOW, Budget & financial information V: 119. WDFW - Subcontracts Administration 11/30/2010 11/30/2010
WDFW - Operate Wenatchee & Methow Hatcheries W: 157. WDFW -Lower Wenatchee and Chiwawa River Traps 11/30/2010 11/30/2010
WDFW - PIT tag - Lower Wenatchee River & Chiwawa River Traps X: 158. WDFW - PIT Tag - Lower Wenatchee and Chiwawa River Traps 11/30/2010 11/30/2010
Uploading & submission of data Y: 159. WDFW - Submit files to PITAGIS 11/29/2010 11/29/2010
Funding Package - Submit draft to COTR Z: 119. WDFW - Subcontracts Administration 11/30/2010 11/30/2010
Successful Administration of Contract AA: 119. PSMFC & FPC Administration 11/30/2010 11/30/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 6 instances of WE 158 Mark/Tag Animals
  • 3 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 5 instances of WE 158 Mark/Tag Animals
  • 3 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 ESA Permit 12/01/2009
B 70 IDFG - Installation of Clearwater River Fish Trap 03/01/2010
C 158 IDFG - PIT tag steelhead & chinook at Idaho Hatcheries 03/01/2010
D 158 IDFG - PIT Tag Wild Spring Chinook and Wild Steelhead at Clearwater Trap 03/01/2010
E 158 IDFG - PIT Tag Wild Spring Chinook at the Salmon River Trap 03/01/2010
F 158 IDFG - PIT Tag Wild Spring Chinook at the Snake River Trap 03/01/2010
G 158 IDFG - PIT Tag Wild Spring Chinook at IDFG Upper Tributary traps 03/01/2010
H 157 IDFG - Operate Idaho Hatcheries, Snake, Salmon & Clearwater Traps 03/01/2010
I 162 IDFG - Hatcheries mark group data 12/01/2009
J 159 IDFG - Submit files to PTAGIS database 12/01/2009
K 119 IDFG - Subcontract Administration 12/01/2009
L 158 ODFW - PIT tag Chinook at Lookingglass Hatchery 03/01/2010
M 158 ODFW - PIT tag Steelhead at Irrigon Hatchey 03/01/2010
N 158 ODFW - PIT tag wild Chinook at Grande Ronde River Traps 03/01/2010
O 157 ODFW - Monitor/record tag loss & mortality at Lookingglass and Grand Ronde River trap 03/01/2010
P 162 ODFW - Lookingglass Hatchery Migration Survival Data 12/01/2009
Q 159 ODFW - Submit Files for Lookingglass and Lower Grande Ronde River Trap to PTAGIS database 12/01/2009
R 119 ODFW - Subcontracts Administration 12/01/2009
S 158 WDFW - PIT Tag Steelhead at the Lyons Ferry Hatchery 03/01/2010
T 159 WDFW - Submit files to PITAGIS 12/01/2009
U 157 WDFW - Operate Lyons Ferry Hatchery 03/01/2010
V 119 WDFW - Subcontracts Administration 12/01/2009
W 157 WDFW -Lower Wenatchee and Chiwawa River Traps 03/01/2010
X 158 WDFW - PIT Tag - Lower Wenatchee and Chiwawa River Traps 03/01/2010
Y 159 WDFW - Submit files to PITAGIS 12/01/2009
Z 119 WDFW - Subcontracts Administration 12/01/2009
AA 119 PSMFC & FPC Administration 12/01/2009
AB 132 CSS Annual Report 3/3/2010 to 11/28/2010 12/01/2009
AC 185 Periodic Status Reports for BPA 12/01/2009