Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 46159: 1987-100-01 EXP UMATILLA ANAD FISH HAB - CTUIR
Project Number:
Title:
Umatilla Anadromous Fish Habitat-Umatilla Tribe
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
46159
Contract Title:
1987-100-01 EXP UMATILLA ANAD FISH HAB - CTUIR
Contract Continuation:
Previous: Next:
42025: 1987-100-01 EXP UMATILLA ANAD FISH HAB - CTUIR
  • 52770: 1987-100-01 EXP UMATILLA ANAD FISH HAB - CTUIR
Contract Status:
Closed
Contract Description:
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose ongoing fish habitat protection, restoration and enhancement, maintenance, and monitoring activities under the CTUIR Umatilla Anadromous Fish Habitat Project (198710001) to achieve the aquatic biological objectives and strategies and management plans established in the Umatilla Subbasin Plan (NPCC, 2004) and the Northwest Power and Conservation Council (NPCC) Fish and Wildlife Program (NPPC 2000).

The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore functional floodplain, channel, and watershed processes to provide sustainable and healthy habitat for aquatic species in the Umatilla River Basin, including Threatened Mid-Columbia summer steelhead.  Project work further supports the CTUIR Department of Natural Resource ecological (River Vision 2008) and First Foods mission statements to sustain production.

The following is an agreement between BPA and CTUIR to provide funds for implementing habitat enhancement actions in the Umatilla River Basin.
Account Type(s):
Expense
Contract Start Date:
02/01/2010
Contract End Date:
01/31/2011
Current Contract Value:
$895,158
Expenditures:
$895,158

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Upload SOW, budget, property inventory for upcoming contract period to Pisces. A: 119. Manage and Administer Project 11/01/2010 11/01/2010
Receipt of environmental compliance clearance from BPA B: 165. Produce Environmental Compliance Documentation 09/30/2010 01/31/2011
List of final projects E: 114. CTUIR Umatilla Subbasin Restoration Coordination 01/31/2011 01/31/2011
Provide technical input and summaries to enhance or protect natural resources in the subbasin. F: 122. Review and provide technical input on issues and topics that affect the areas natural resource 01/31/2011 01/31/2011
Coordinate watershed association activities G: 191. Umatilla River Watershed coordination duties 01/31/2011 01/31/2011
Complete outreach and education activities H: 99. Public Outreach and Education 01/31/2011 01/31/2011
Produce methods for monitoring project effectiveness I: 156. Incorporate developed strategic and scientifically accepted monitoring methods for application 01/31/2011 01/31/2011
Complete data collection and summarized findings J: 157. Monitoring and Evaluation CTUIR Umatilla Anadromous Fish Habitat Project 01/31/2011 01/31/2011
Maximize survival of planted trees and shrubs in enhancement project areas K: 22. Maintain trees and shrubs, and grass seeding in Umatilla River Basin habitat enhancement areas 01/31/2011 01/31/2011
Complete scheduled tree and shrub plantings in project areas L: 47. Supplement riparian areas of existing and new projects with additional vegetation 01/31/2011 01/31/2011
Treat 512 acres (109 riparian & 403 upland) in enhancement areas M: 53. Control of noxious weeds in project areas by physical and chemical means 01/31/2011 01/31/2011
Maintain proper operation of instream habitat structures N: 186. Inspect and maintain function of instream improvement structures 01/31/2011 01/31/2011
Maintenance of land or structures associated with conservation easements O: 186. Maintenance of habitat features associated with project conservation easements 01/31/2011 01/31/2011
Complete channel reconstruction or enhancement on 1.3 miles of stream P: 29. Meacham Creek floodplain restoration and in-stream enhancement, river miles 6.0 to 7.3 01/31/2011
Complete levee removal floodplain enhancements to Meacham Creek Q: 180. Enhance floodplain connectivity and function via levee setback on Meacham Creek, river miles 6.0-7.3 01/31/2011
10.0 miles of fence constructed on Meacham Creek R: 40. Install riparian fence enclosure in Meacham Creek, river miles 2.0-9.0 01/31/2011
Complete implementation of the channel reconstruction on 1.5 miles of stream S: 29. Lower Umatilla River bank stabilization and habitat restoration 09/30/2010
Maintain 355 acres (61 riparian, 294 upland) in project area T: 22. Enhance native vegetation growth in the B&G Resources Property, Umatilla River (RM 41-44) 11/30/2010 11/30/2010
Complete Instream Habitat and Bank Stability Structures U: 29. Birch Creek bank stabilization and habitat restoration, river mile 2.8 11/30/2010 11/10/2010
Incorporate final plan into the project annual report V: 174. Incorporate Umatilla River and Willow Creek watershed habitat assessment plan findings into project 01/31/2011 01/31/2011
Produce draft plan for a repeatable riparian and floodplain vegetation monitoring strategy W: 174. Meacham Creek vegetation survey and repeatable monitoring strategy 01/31/2011 01/31/2011
Modify irrigation dam for fish passage X: 84. Tier 2 Work Element: Peterson Dam Modification Project on Birch Creek, river mile 2.5 08/15/2010
Initiate project coordination and identify priority status and implementation need. Y: 175. Tier 2 Work Element: Westland/Ramos Habitat Restoration Project Plan 01/31/2011 01/31/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 2 instances of WE 22 Maintain Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 22 Maintain Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and Administer Project 02/01/2010
B 165 Produce Environmental Compliance Documentation 02/01/2010
C 185 Periodic Status Reports for BPA 02/01/2010
D 132 Produce Annual Progress Report for the FY 2009 period (Feb 2009) to (Jan 2010) 02/01/2010
E 114 CTUIR Umatilla Subbasin Restoration Coordination 02/01/2010
F 122 Review and provide technical input on issues and topics that affect the areas natural resource 02/01/2010
G 191 Umatilla River Watershed coordination duties 02/01/2010
H 99 Public Outreach and Education 02/01/2010
I 156 Incorporate developed strategic and scientifically accepted monitoring methods for application 02/01/2010
J 157 Monitoring and Evaluation CTUIR Umatilla Anadromous Fish Habitat Project 04/29/2010
K 22 Maintain trees and shrubs, and grass seeding in Umatilla River Basin habitat enhancement areas 04/29/2010
L 47 Supplement riparian areas of existing and new projects with additional vegetation 04/29/2010
M 53 Control of noxious weeds in project areas by physical and chemical means 04/29/2010
N 186 Inspect and maintain function of instream improvement structures 05/20/2010
O 186 Maintenance of habitat features associated with project conservation easements 02/01/2010
P 29 Meacham Creek floodplain restoration and in-stream enhancement, river miles 6.0 to 7.3 12/14/2010
Q 180 Enhance floodplain connectivity and function via levee setback on Meacham Creek, river miles 6.0-7.3 04/29/2010
R 40 Install riparian fence enclosure in Meacham Creek, river miles 2.0-9.0 05/04/2010
S 29 Lower Umatilla River bank stabilization and habitat restoration 02/01/2010
T 22 Enhance native vegetation growth in the B&G Resources Property, Umatilla River (RM 41-44) 04/29/2010
U 29 Birch Creek bank stabilization and habitat restoration, river mile 2.8 05/24/2010
V 174 Incorporate Umatilla River and Willow Creek watershed habitat assessment plan findings into project 02/01/2010
W 174 Meacham Creek vegetation survey and repeatable monitoring strategy 02/01/2010
X 84 Tier 2 Work Element: Peterson Dam Modification Project on Birch Creek, river mile 2.5 06/24/2010
Y 175 Tier 2 Work Element: Westland/Ramos Habitat Restoration Project Plan 02/01/2010