Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 46478: 200850600 EXP SMOLT VIDEO MONITORING
Project Number:
Title:
Smolt Monitoring Video Feasibility Project
Stage:
Closed
Area:
Province Subbasin %
Mainstem - 100.00%
Contract Number:
46478
Contract Title:
200850600 EXP SMOLT VIDEO MONITORING
Contract Continuation:
Previous: Next:
41225: 200850600 EXP SMOLT MONITORING VIDEO FEASIBILITY PROJECT
  • 51457: 200850600 EXP SMOLT VIDEO MONITORING
Contract Status:
History
Contract Description:
This contract will continue a feasibility project, which began with Fish Passage Center funding in 2006 and was implemented in 2009 using MOA funding, to assess whether video technology can be used to reduce smolt handling in the regions smolt monitoring program.  In 2009, this MOA funded project installed a window and box adjacent to the Bonneville Dam fish passage channel just upstream of the separator at the juvenile fish facility. Inside the box was a video camera while lighting with lighting provided from above   Video was be recorded on a digital video recorder and video files brought back to CRITFC for review.   Late equipment arrival, resulting in the system not being installed until late August after the vast majority of the smolt passed, resulted in inadequate time for testing and evaluation.  In 2010, testing and evaluation will continue.
Account Type(s):
Expense
Contract Start Date:
03/01/2010
Contract End Date:
02/28/2011
Current Contract Value:
$25,963
Expenditures:
$25,963

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Israel Duran Bonneville Power Administration No Env. Compliance Lead induran@bpa.gov (503) 230-3967
Jeffrey Fryer Columbia River Inter-Tribal Fish Commission (CRITFC) Yes Contract Manager fryj@critfc.org (503) 731-1266
Richard Golden Jr Bonneville Power Administration Yes COR rlgolden@bpa.gov (503) 230-5119
Christine Golightly Columbia River Inter-Tribal Fish Commission (CRITFC) No Interested Party golc@critfc.org (503) 731-1288
Douglas Hatch Columbia River Inter-Tribal Fish Commission (CRITFC) No Interested Party hatd@critfc.org (503) 731-1263
Melissa Holland Columbia River Inter-Tribal Fish Commission (CRITFC) No Interested Party holm@critfc.org (503) 731-1264
Rosemary Mazaika Bonneville Power Administration Yes F&W Approver rxmazaika@bpa.gov (503) 230-5869
Dolores Rodriguez Columbia River Inter-Tribal Fish Commission (CRITFC) No Administrative Contact rodd@critfc.org (503) 731-1274
Phillip Roger Columbia River Inter-Tribal Fish Commission (CRITFC) No Supervisor rogp@critfc.org (503) 731-1301
Perf Tester Bonneville Power Administration No perftester@bpa.gov (123) 123-1234
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Nancy Weintraub Bonneville Power Administration No Interested Party nhweintraub@bpa.gov (503) 230-5373
John Whiteaker Columbia River Inter-Tribal Fish Commission (CRITFC) No Interested Party whij@critfc.org (503) 238-3562


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Ensure environmental compliance requirements are complete B: 165. Complete environmental compliance requirements 02/28/2011 02/28/2011
Design and installation of video monitoring system C: 70. Installation of video monitoring system 10/28/2010
Collection of video files D: 157. Data collection 11/30/2010 11/30/2010
Data analysis for annual report E: 162. Data analysis 02/28/2011 02/28/2011
Summary report F: 161. Reporting 02/26/2011 02/28/2011
Attach Progress Report in Pisces G: 132. Submit Progress Report for the period Mar 2010 to October 2010 02/15/2011 02/28/2011
Complete all project management and administrative activities for contract H: 119. Manage and administer project 02/28/2011 02/28/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Sockeye (Oncorhynchus nerka) - All Populations
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 03/01/2010
B 165 Complete environmental compliance requirements 03/01/2010
C 70 Installation of video monitoring system 03/01/2010
D 157 Data collection 03/01/2010
E 162 Data analysis 03/01/2010
F 161 Reporting 03/01/2010
G 132 Submit Progress Report for the period Mar 2010 to October 2010 03/01/2010
H 119 Manage and administer project 03/01/2010