| Province | Subbasin | % |
|---|---|---|
| Columbia Gorge | Hood | 100.00% |
| Previous: | Next: |
|---|---|
| n/a |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Build and install a PIT tag interrogation system for the mouth of the Hood River | B: 70. Build and install a PIT tag interrogation system at the mouth of the Hood River | 11/30/2010 | 11/30/2010 | |
| Insure data collection from the system | C: 157. Insure data collection from the system | 11/30/2010 | 11/30/2010 | |
| Register site with PTAGIS and submit data | D: 159. Register site with PTAGIS and submit data | 11/30/2010 | ||
| Obtain permitting | E: 165. Complete NEPA and obtain permits as necessary. | 08/31/2010 | 08/31/2010 | |
| Submit accrual and invoice information to BPA | F: 119. Submit September Accrual | 11/30/2010 | 11/30/2010 | |
| Work summary | G: 132. Submit Progress Report | 11/30/2010 | 11/30/2010 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
| Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | 08/01/2010 | ||||||
| B | 70 | Build and install a PIT tag interrogation system at the mouth of the Hood River | 08/01/2010 | ||||||
| C | 157 | Insure data collection from the system | 08/01/2010 | ||||||
| D | 159 | Register site with PTAGIS and submit data | 08/01/2010 | ||||||
| E | 165 | Complete NEPA and obtain permits as necessary. | 08/01/2010 | ||||||
| F | 119 | Submit September Accrual | 08/01/2010 | ||||||
| G | 132 | Submit Progress Report | 08/01/2010 |