Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 48828: 1988-053-03 EXP CTWS HOOD RIVER M&E
Project Number:
Title:
Hood River Production Program Monitoring and Evaluation (M&E)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
48828
Contract Title:
1988-053-03 EXP CTWS HOOD RIVER M&E
Contract Continuation:
Previous: Next:
43767: 1988-053-03 EXP CTWS HOOD RIVER M&E
  • 54191: 1988-053-03 EXP CTWS HOOD RIVER M&E
Contract Status:
Closed
Contract Description:
Fisheries Program Manager:  Brad Houslet (541) 553-2039
Fiscal Officer: Arthur Mitchell (541) 553-3219
Hood River Production Program Manager: Chris Brun (541) 352-3548
Technical Contact: Ryan Gerstenberger (541) 352-9326
Address: 6030 Dee Highway, Parkdale, OR 97041

The CTWSRO Hood River Production Program staff will conduct monitoring and evaluation of the existing spring Chinook salmon and winter steelhead re-introduction / supplementation programs. Activities include determining pre-release smolt quality, out migration timing, duration and residualism. 10% of hatchery releases will be fitted with PIT tags.  Adult spawning locations, timing and success will be monitored. Juvenile distribution surveys will be conducted. Run size predictions, harvest recommendations and tribal harvest monitoring will be implemented during FY 11.

FY 11 funds from this project will be used to implement the comparative hatchery release group evaluation. NOAA fisheries staff will be contracted by BPA to conduct year 1 of a 3 year smolt physiology study. Results from this investigation will assist with determination of long term spring Chinook smolt production strategy.

The USGS Cook lab will be contracted to conduct a investigation to determine the detection efficiency of a channel spanning PIT detector installed near the mouth of the Hood River. The results will be used to adjust estimates of out migrating juveniles and returning HOR and NOR adults.

Water quality monitoring in Rogers Creek and water temperature monitoring throughout the Hood River basin will continue.

Existing HRPP M&E data will be geo-spacially  linked and uploaded to tribal and regional databases.
Account Type(s):
Expense
Contract Start Date:
10/01/2010
Contract End Date:
09/30/2011
Current Contract Value:
$310,518
Expenditures:
$310,518

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Submit 2011 SOW to BPA for environmental compliance review. B: 165. Ensure environmental compliance is adequate 09/30/2011 09/30/2011
20,020 PIT tagged steelhead and spring Chinook salmon. C: 158. PIT tag hatchery steelhead and spring Chinook salmon 09/30/2011 09/30/2011
Monitor water temperatures in the Hood River subbasin D: 157. Collect temperature data in the Hood River subbasin 09/30/2011 09/30/2011
All fish salvage activities complete E: 28. Salvage and transport fish entrained in irrigation canals to nearest free-flowing waterbody 01/28/2011 01/28/2011
Juvenile spring Chinook salmon distribution F: 157. Conduct basin-wide juvenile spring Chinook distribution surveys. 09/30/2011 09/30/2011
Hood River spring Chinook salmon spawning distribution and condition. G: 157. Spring Chinook spawning surveys 09/30/2011 09/30/2011
Acclimation data H: 157. Collect data during acclimation 07/08/2011 06/10/2011
Submit HRPP hatchery production PIT tag codes to PTAGIS database. I: 159. Input Hood River PIT tag data to appropriate databases 07/01/2011 06/30/2011
Estimate of adult spring Chinook salmon returns to the mouth of the Hood River. J: 157. Spring Chinook salmon preseason adult run size forecast. 04/29/2011 03/31/2011
Estimate number of tribally harvest spring Chinook salmon in the Hood River during run year 2011. K: 157. Spring Chinook salmon tribal harvest monitoring 09/30/2011 09/30/2011
HRPP data uploaded to CTWS master database. L: 159. Consolidate HRPP data and upload into CTWS Tribal database. 09/30/2011 09/30/2011
2010 Final Report uploaded to Pisces M: 132. Produce FY 2010 Annual Report 09/30/2011 09/30/2011
Project administration & coordination complete N: 119. Manage Project 09/30/2011 09/30/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 28 Trap and Haul
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 2 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 28 Trap and Haul
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 2 instances of WE 159 Transfer/Consolidate Regionally Standardized Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2010
B 165 Ensure environmental compliance is adequate 10/01/2010
C 158 PIT tag hatchery steelhead and spring Chinook salmon 10/01/2010
D 157 Collect temperature data in the Hood River subbasin 10/01/2010
E 28 Salvage and transport fish entrained in irrigation canals to nearest free-flowing waterbody 10/01/2010
F 157 Conduct basin-wide juvenile spring Chinook distribution surveys. 10/01/2010
G 157 Spring Chinook spawning surveys 10/01/2010
H 157 Collect data during acclimation 10/01/2010
I 159 Input Hood River PIT tag data to appropriate databases 10/01/2010
J 157 Spring Chinook salmon preseason adult run size forecast. 10/01/2010
K 157 Spring Chinook salmon tribal harvest monitoring 10/01/2010
L 159 Consolidate HRPP data and upload into CTWS Tribal database. 10/01/2010
M 132 Produce FY 2010 Annual Report 10/01/2010
N 119 Manage Project 10/01/2010