Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 49514: 2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION-CUSTER
Project Number:
Title:
Idaho Watershed Habitat Restoration-Custer District
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
49514
Contract Title:
2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION-CUSTER
Contract Continuation:
Previous: Next:
43501: 2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION-CUSTER
  • 55535: 2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION-CUSTER
Contract Status:
Closed
Contract Description:
The project scope is to implement high priority action items to maintain, enhance and restore fish habitat and fish passage in the priority stream segments of the Upper Salmon Basin area within the administrative boundaries of the Custer Soil and Water Conservation District.

Implementation of measures funded under this plan will achieve the objective of the Northwest Power Planning Council's Strategy for Salmon Recovery, the National Marine Fisheries Service Salmon Recovery Plan in terms of stabilizing and improving habitat for anadromous fish and the "Four Governors Salmon Recovery Recommendations for Salmon Recovery". Migratory and habitat connectivity across the watershed's valley bottom areas is of high importance to ecologically-based restoration efforts because the tributary sub-watersheds tend to be dominated by federal lands and often provide habitat strongholds for native species of fish and wildlife.

Key habitat limitations in the watershed's bottomland areas include migration problems/ blockages and streambed sedimentation. Addressing these limitations may offer an opportunity to enhance the watershed's anadromous salmonids and will clearly benefit other native species of salmonids, other fish, and wildlife.  The primary opportunity for addressing these problems in the East Fork and Upper Salmon watersheds is through the CSWCD and their collaborative efforts on non-federal land.

Projects developed for this SOW will enhance projects installed over the past three to six years under BPA/CSWCD contracts. The Stanley riparian fences has enhanced approximately 4.5 mile of riparian protection in the Upper Salmon. The additional fence to be installed under this contract will continue to show riparian improvements. Riparian plantings in lower Stanley will further enhance approximately six miles of continuous riparian fence in lower Stanley. Approximately 4.5 miles was installed under BPA contracts in 2005/2006. Continued efforts are being made in the East Fork, Salmon River, and Challis Creek to improve riparian protection in the Upper Salmon Basin.
Account Type(s):
Expense
Contract Start Date:
09/01/2010
Contract End Date:
12/31/2011
Current Contract Value:
$129,558
Expenditures:
$129,558

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Prepare Necessary Environmental Compliance documentation for relevant projects A: 165. Produce Environmental Compliance Documents for projects 10/31/2011
Designs and Specifications from NRCS on BPA project B: 175. NRCS Staff Position for Cost 12/30/2011 12/20/2011
Identify and Select Individual Projects C: 114. Identify and develop habitat projects 10/07/2011 04/13/2011
Conduct Education and Outreach Program to target key habitat and passages areas within CSWCD. D: 99. Provide Outreach and Education for Habitat Projects 12/30/2011 12/20/2011
Install approximately 6200 feet of riparian fence E: 40. Install Riparian Fence in Stanley 10/31/2011 09/30/2011
Develop Alternative Stock water Systems by drilling a well F: 34. Develop Alternative Stock Water for Challis Creek Riparian Area 08/31/2011 06/30/2011
Install approximately 12,000 feet of riparian fence G: 40. Fence on Salmon River at Broken Wing 09/30/2011 09/30/2011
Improve Fish Passage H: 85. Improve Fish Passage at Broken Wing 12/23/2011
Approximately 5315 feet of pipeline I: 149. Install Lyon Creek Pipeline 12/23/2011
Install 2 wells to provide alternatives to water gaps on 2 miles of the Salmon River. J: 34. Stock water devices at Broken Wing 12/16/2011
Install Sprinkler System to allow for the removal of two points of diversion, EF-1 & Wickiup-1 K: 150. Install Sprinkler to allow removal of two Points of Diversion 1=East Fork 1=Wickiup 12/15/2011
Attach Progress Report in Pisces L: 132. Submit Progress Report for the period September 2010 thru December 2011 11/15/2011 12/29/2011
Funding Package - Submit draft to COTR M: 119. Routine contract actions 10/28/2011 10/28/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 40 Install Fence
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 34 Develop Alternative Water Source
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 149 Install Pipeline
  • 1 instance of WE 150 Install Sprinkler
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 150 Install Sprinkler
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 149 Install Pipeline
  • 1 instance of WE 150 Install Sprinkler

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Environmental Compliance Documents for projects 08/01/2010
B 175 NRCS Staff Position for Cost 08/01/2010
C 114 Identify and develop habitat projects 08/01/2010
D 99 Provide Outreach and Education for Habitat Projects 08/01/2010
E 40 Install Riparian Fence in Stanley 08/04/2010
F 34 Develop Alternative Stock Water for Challis Creek Riparian Area 08/26/2010
G 40 Fence on Salmon River at Broken Wing 08/04/2010
H 85 Improve Fish Passage at Broken Wing
I 149 Install Lyon Creek Pipeline
J 34 Stock water devices at Broken Wing
K 150 Install Sprinkler to allow removal of two Points of Diversion 1=East Fork 1=Wickiup
L 132 Submit Progress Report for the period September 2010 thru December 2011 08/01/2010
M 119 Routine contract actions 08/01/2010
N 185 Periodic Status Reports for BPA 08/01/2010