Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 55535: 2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION-CUSTER
Project Number:
Title:
Idaho Watershed Habitat Restoration-Custer District
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
55535
Contract Title:
2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION-CUSTER
Contract Continuation:
Previous: Next:
49514: 2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION-CUSTER
  • 59926: 2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
The project scope is to implement high priority action items to maintain, enhance and restore fish habitat and fish passage in the priority stream segments of the Upper Salmon Basin area within the administrative boundaries of the Custer Soil and Water Conservation District.

Implementation of measures funded under this plan will achieve the objective of the Northwest Power Planning Council's Strategy for Salmon Recovery, the National Marine Fisheries Service Salmon Recovery Plan in terms of stabilizing and improving habitat for anadromous fish and the "Four Governors Salmon Recovery Recommendations for Salmon Recovery". Migratory and habitat connectivity across the watershed's valley bottom areas is of high importance to ecologically-based restoration efforts because the tributary sub-watersheds tend to be dominated by federal lands and often provide habitat strongholds for native species of fish and wildlife.

Key habitat limitations in the watershed's bottomland areas include migration problems/ blockages and streambed sedimentation. Addressing these limitations may offer an opportunity to enhance the watershed's anadromous salmonids and will clearly benefit other native species of salmonids, other fish, and wildlife.  The primary opportunity for addressing these problems in the East Fork and Upper Salmon watersheds is through the CSWCD and their collaborative efforts on non-federal land.

Projects developed for this SOW will enhance projects installed over the past three to six years under BPA/CSWCD contracts. A larger percentage of the East Fork has been Fenced. The additional fence to be installed under this contract will continue to show riparian improvements.  Continued efforts are being made in the East Fork, and Salmon River, to improve riparian protection and passage barriers in the Upper Salmon Basin.
Account Type(s):
Expense
Contract Start Date:
01/01/2012
Contract End Date:
12/31/2012
Current Contract Value:
$224,430
Expenditures:
$224,430

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Prepare Necessary Environmental Compliance documentation for relevant projects B: 165. Produce Environmental Compliance Documents for projects 12/31/2012 12/26/2012
Designs and Specifications from NRCS on BPA projects C: 175. NRCS Technical staff and Challis position 12/31/2012 12/26/2012
Identify and Select Individual Projects D: 114. Identify and develop habitat projects 12/31/2012 12/28/2012
Conduct Education and Outreach Program to target key habitat and passages areas within CSWCD. E: 99. Provide Outreach and Education for Habitat Projects 12/28/2012 12/28/2012
Install approximately 5100 feet of riparian fence protection approximately 3000 feet East Fork F: 40. Install Riparian Fence on the East Fork of the Salmon River 11/30/2012 11/30/2012
Approximately 6000 feet of pipeline G: 149. Install Lyon Creek Pipeline 11/30/2012
Install 2 stock-water locations to provide alternatives to water gaps on 2 miles of the Salmon River H: 34. Stock water devices at Broken Wing 11/11/2012 12/21/2012
Install Sprinkler System to allow for the removal of two points of diversion, EF-1 & Wickiup-1 I: 150. Install Sprinkler to allow removal of two Points of Diversion 1=East Fork 1=Wickiup 10/26/2012 10/26/2012
Attach Progress Report in Pisces J: 132. Submit Progress Report for the period January 2012 through March 2012 03/30/2012 01/30/2012
Funding Package - Submit draft to COTR K: 119. Routine contract actions 10/30/2012 12/07/2012
Install two linked paver in two ford crossing in Lyon Creek L: 55. Install two linked paver in two ford crossing in Lyon Creek 11/30/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 149 Install Pipeline
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 150 Install Sprinkler
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 150 Install Sprinkler
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 149 Install Pipeline
  • 1 instance of WE 150 Install Sprinkler

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 09/01/2011
B 165 Produce Environmental Compliance Documents for projects 09/01/2011
C 175 NRCS Technical staff and Challis position 09/01/2011
D 114 Identify and develop habitat projects 09/01/2011
E 99 Provide Outreach and Education for Habitat Projects 09/01/2011
F 40 Install Riparian Fence on the East Fork of the Salmon River 11/07/2011
G 149 Install Lyon Creek Pipeline 09/24/2012
H 34 Stock water devices at Broken Wing 09/24/2012
I 150 Install Sprinkler to allow removal of two Points of Diversion 1=East Fork 1=Wickiup 11/07/2011
J 132 Submit Progress Report for the period January 2012 through March 2012 09/01/2011
K 119 Routine contract actions 09/01/2011
L 55 Install two linked paver in two ford crossing in Lyon Creek 01/01/2012