Contract 50510: 2007-404-00 EXP OR SPR CHINOOK CAPTIVE PROP
Project Number:
Title:
Spring Chinook Captive Propagation-Oregon
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
50510
Contract Title:
2007-404-00 EXP OR SPR CHINOOK CAPTIVE PROP
Contract Continuation:
Previous: Next:
44712: 2007-404-00 EXP OR SPR CHINOOK CAPTIVE PROP
  • 54961: 2007-404-00 EXP OR SPR CHINOOK CAPTIVE PROP
Contract Status:
Closed
Contract Description:
The goal of the Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program is to prevent extinction of the spring Chinook salmon Oncorhynchus tshawytscha populations in Catherine Creek, Upper Grande Ronde River and Lostine River, Oregon.  This will provide a future basis to reverse the decline in stock abundance of Grande Ronde River Chinook salmon and ensure a high probability of population persistence well into the future, once the causes of basin wide population declines have been addressed.  A coincident goal is to maintain the genetic diversity of indigenous artificially propagated Chinook salmon populations and that of wild Chinook salmon populations in the Grande Ronde Basin.  The Catherine Creek and Lostine River programs will have come to an end with the 2010 spawn, because we met our goal of a consistent return of 150 adults spawning in nature.  A Conventional Hatchery Program will take over for supplementing these populations.  The Upper Grande Ronde River population has not yet achieved this goal and the Captive Broodstock program continued through the 2007 brood year.  The 2008 brood year is the first of a Safety Net Program for the Upper Grande Ronde River, which will be similar to the Captive Broodstock Program, but less intensively monitored.
Account Type(s):
Expense
Contract Start Date:
10/01/2010
Contract End Date:
09/30/2011
Current Contract Value:
$511,297
Expenditures:
$511,297

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Approved HGMP or renewed Section 10 Permit A: 165. Obtain NEPA Clearance and Permits 09/30/2011 09/30/2011
Post-smolt Rearing and Spawning of Chinook Salmon B: 176. Rear and Spawn BY 2006 Captive Broodstock Chinook Salmon at Bonneville Hatchery 09/30/2011 09/30/2011
Post-smolt Rearing and Spawning of Chinook Salmon C: 176. Rear and Spawn BY 2007 Captive Broodstock Chinook Salmon at Bonneville Hatchery 09/30/2011 09/30/2011
Post-smolt Rearing and Spawning of Chinook Salmon D: 176. Rear and Spawn BY 2008 Captive Broodstock Chinook Salmon at Bonneville Hatchery 09/30/2011 09/30/2011
Facility Maintenance E: 61. Maintain Fish Rearing Facilities 09/30/2011 09/30/2011
Fish Health F: 60. Maintain Health of Captive Broodstock Chinook Salmon 09/30/2011 09/30/2011
Pre-smolt Rearing Data Collection G: 157. Collect Data for Monitoring and Evaluation Analyses 09/30/2011 09/30/2011
Data Analyses and Interpretation H: 162. Evaluate Rearing Protocols, Spawning, Genetic Relatedness and Experimental Treatments 09/30/2011 09/30/2011
Annual Operating Plan Developed I: 174. Produce Plans for Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program 03/31/2011 03/31/2011
Research, Monitoring and Evaluation Plans J: 156. Develop RM&E Methods and Designs for the Captive Broodstock Program 06/01/2011 06/01/2011
Disseminate Findings K: 183. Disseminate Findings Through Scientific Presentations and Publications 09/30/2011 09/30/2011
Technical Review L: 122. Provide Technical Review of Captive Broodstock/Propagation Projects 09/30/2011 09/30/2011
Program Coordination M: 189. Program Coordination 09/30/2011 09/30/2011
Manage and Maintain Captive Broodstock Database N: 160. Manage and Maintain Captive Broodstock Database 09/30/2011 09/30/2011
2010 Annual Progress Report Submitted O: 132. Development and Submission of 2010 Annual Progress Report 04/30/2011 04/30/2011
Project Management and Budget P: 119. Manage project and prepare FY 2012 SOW with budget 07/01/2011 09/15/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 3 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 183 Produce Journal Article
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain NEPA Clearance and Permits 10/01/2010
B 176 Rear and Spawn BY 2006 Captive Broodstock Chinook Salmon at Bonneville Hatchery 10/01/2010
C 176 Rear and Spawn BY 2007 Captive Broodstock Chinook Salmon at Bonneville Hatchery 10/01/2010
D 176 Rear and Spawn BY 2008 Captive Broodstock Chinook Salmon at Bonneville Hatchery 10/01/2010
E 61 Maintain Fish Rearing Facilities 10/01/2010
F 60 Maintain Health of Captive Broodstock Chinook Salmon 10/01/2010
G 157 Collect Data for Monitoring and Evaluation Analyses 10/01/2010
H 162 Evaluate Rearing Protocols, Spawning, Genetic Relatedness and Experimental Treatments 10/01/2010
I 174 Produce Plans for Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program 10/01/2010
J 156 Develop RM&E Methods and Designs for the Captive Broodstock Program 10/01/2010
K 183 Disseminate Findings Through Scientific Presentations and Publications 10/01/2010
L 122 Provide Technical Review of Captive Broodstock/Propagation Projects 10/01/2010
M 189 Program Coordination 10/01/2010
N 160 Manage and Maintain Captive Broodstock Database 10/01/2010
O 132 Development and Submission of 2010 Annual Progress Report 10/01/2010
P 119 Manage project and prepare FY 2012 SOW with budget 10/01/2010
Q 185 Periodic Status Reports for BPA 10/01/2010