| Province | Subbasin | % |
|---|---|---|
| Mountain Snake | Salmon | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Funding Package - Submit draft to COTR | A: 119. Routine contract administration | 07/30/2012 | 08/03/2012 | |
| There is no environmental compliance associated with this contract. | B: 165. Completion of EC documentation to BPA | 08/31/2012 | 08/31/2012 | |
| Develop two (2) project proposal for BPA funding | C: 114. Identify and Select Projects | 08/31/2012 | 08/31/2012 | |
| Engineering Designs for Habitat Conservation Projects | D: 175. Produce engineering designs for Lemhi habitat conservation actions | 08/31/2012 | 07/06/2012 | |
| Monitor Grazing exclosures and produce reports for Upper Carmen Creek Monitoring and Grazing Project | E: 174. Riparian Grazing Study & Monitoring | 08/31/2012 | 08/31/2012 | |
| Upper Salmon River Basin Planning Tool, Phase III | F: 160. Sub Basin Wide Planning Tool, Phase III | 08/31/2012 | 08/31/2012 | |
| Measure Well Levels | G: 115. Well Level Measurements-Sager | 08/31/2012 | 08/31/2012 | |
| Attach Progress Report in Pisces | H: 132. Submit Progress Report for the period (Sept 2011) to (Aug 2012) | 07/31/2012 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
| Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 119 | Routine contract administration | 09/01/2011 | ||||||
| B | 165 | Completion of EC documentation to BPA | 09/01/2011 | ||||||
| C | 114 | Identify and Select Projects | 09/01/2011 | ||||||
| D | 175 | Produce engineering designs for Lemhi habitat conservation actions | 09/01/2011 | ||||||
| E | 174 | Riparian Grazing Study & Monitoring | 09/01/2011 | ||||||
| F | 160 | Sub Basin Wide Planning Tool, Phase III | 09/01/2011 | ||||||
| G | 115 | Well Level Measurements-Sager | 09/01/2011 | ||||||
| H | 132 | Submit Progress Report for the period (Sept 2011) to (Aug 2012) | 09/01/2011 | ||||||
| I | 185 | Periodic Status Reports for BPA | 09/01/2011 |