Contract 58553: 2007-394-00 EXP UPPER SALMON SCREEN TRIBUTARY PASSAGE-OSC
Project Number:
Title:
Upper Salmon Basin Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
58553
Contract Title:
2007-394-00 EXP UPPER SALMON SCREEN TRIBUTARY PASSAGE-OSC
Contract Continuation:
Previous: Next:
54440: 2007-394-00 EXP UPPER SALMON SCREEN TRIBUTARY PASSAGE-OSC
  • 62457: 2007-394-00 EXP UPPER SALMON BASIN HABITAT RESTORATION-OSC
Contract Status:
Closed
Contract Description:
The "Model Watershed" originated from the Northwest Power Planning Council's (NPCC) strategy for Salmon recovery and was initiated in 1992 when former Governor of Idaho, Cecil D. Andrus, selected the Idaho Soil Conservation Commission (ISCC) as lead agency.  The ISCC designated the Lemhi River, Pahsimeroi River and East Fork Salmon River as the Model Watershed for Idaho.  In 2000, this area was expanded to include the entire Upper Salmon River Basin and the name was changed to the Upper Salmon Basin Watershed Project and later, the Upper Salmon Basin Watershed Program (USBWP).  In 2010, The Idaho Governor's Office of Species Conservation (OSC) fully assumed administrative responsibilities for the USBWP.  

The State of Idaho and the Bonneville Power Administration (BPA) entered into a Memorandum of Understanding on July 6, 2007 to demonstrate a commitment to set a new course for the USBWP.  This contract serves to further clarify the role and assurances made by OSC in implementing its new oversight responsibilities.  This contract will also specify the various work elements to be carried out by the USBWP.  

BPA has funded the USBWP since 1992.  This partnership has resulted in the successful implementation of numerous habitat improvement projects.  It is the goal of the State of Idaho and BPA to build upon these past efforts and to work in cooperation to ensure successful outcomes in the future.
Account Type(s):
Expense
Contract Start Date:
09/01/2012
Contract End Date:
08/31/2013
Current Contract Value:
$406,430
Expenditures:
$406,430

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Fulfill all administrative tasks with quality products and in a timely manner. A: 119. Routine administration of contract 08/31/2013 08/31/2013
There is no environmental compliance associated with this contract B: 165. Completion of EC documentation to BPA 09/30/2012 09/30/2012
Develop two project proposals and obtain Tech Team review C: 114. Identify and Select Projects 08/31/2013 08/31/2013
Produce engineering designs for Lemhi conservation projects. D: 175. Produce engineering designs for Lemhi conservation actions 08/31/2013 08/31/2013
Measure well levels E: 115. Well Level Measurements - Sager 08/31/2013 08/31/2013
Support and maintenance of the USBWP Geotool F: 160. Sub Basin Wide Planning Tool 08/31/2013 08/31/2013
Monitor grazing exclosures and produce reports for Upper Carmen Creek Monitoring and Grazing Project G: 174. Riparian Grazing Study: McFarland 08/31/2013 08/31/2013
Attach Progress Report in Pisces I: 132. Submit Progress Report for the period (Sept 2012) to (Aug 2013) 08/15/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Routine administration of contract 09/01/2012
B 165 Completion of EC documentation to BPA 09/01/2012
C 114 Identify and Select Projects 09/01/2012
D 175 Produce engineering designs for Lemhi conservation actions 09/01/2012
E 115 Well Level Measurements - Sager 09/01/2012
F 160 Sub Basin Wide Planning Tool 09/01/2012
G 174 Riparian Grazing Study: McFarland 09/01/2012
H 185 Periodic Status Reports for BPA 09/01/2012
I 132 Submit Progress Report for the period (Sept 2012) to (Aug 2013) 09/01/2012