| NEPA Compliance Requirements Complete For Habitat Restoration Projects To Be Implemented |
A: 165. Obtain Environmental Compliance |
|
01/31/2013 |
01/31/2013 |
| Viable Restoration Projects Developed To Assist In The Attainment Of Project Goal |
B: 114. Habitat Restoration Project Development |
|
01/31/2013 |
01/31/2013 |
| Remove Noxious Weeds & Revegetate Ground Within Trout Creek |
C: 47. Revegetate Exclosure Area Within The Trout Creek Project Area |
|
01/31/2013 |
01/31/2013 |
| Removal of under sized and/or partial fish barrier culverts in Upper Trout Creek Basin |
D: 85. Replace Undersized Culverts In Upper Trout Creek Basin |
|
01/31/2013 |
01/31/2013 |
| Develop Culvert Replacement Specifications For Upper Trout Creek Basin Culverts |
E: 175. Develop Design Specifications For Upper Trout Creek Culvert Replacement |
|
01/31/2013 |
01/31/2013 |
| Replacement Of Undersized & Semi-Functional Culverts In The Upper Trout Creek Basin |
F: 38. Replace Undersized Culverts In Upper Trout Creek Basin |
|
01/31/2013 |
01/31/2013 |
| Develop Off Channel Water Sources For Livestock (If Identified) |
G: 34. Develop Offsite Water Sources For Livestock |
|
01/31/2013 |
01/31/2013 |
| Monitor Trout Creek Basin Riparian Exclosures |
H: 26. Monitor Exclosures |
|
01/31/2013 |
01/31/2013 |
| Maintained Fences & Water Gaps |
I: 186. Maintain Riparian Corridor Fence |
|
01/31/2013 |
01/31/2013 |
| Maintained Bank Stabilization Structures |
J: 186. Maintain Bank Stabilization Structures |
|
01/31/2013 |
01/31/2013 |
| Maintained Instream Structures |
K: 186. Maintain Instream Structures |
|
01/31/2013 |
12/31/2012 |
| Repaired/Maintained Off Channel Water Development Sites |
L: 186. Repair/Maintain Off Channel Water Development Sites |
|
01/31/2013 |
01/31/2013 |
| Document Physical Habitat Changes In Response To Restoration Actions Funded By BPA |
M: 157. Document The Changes Of Habitat Restoration Practices In The Trout Creek Basin |
|
01/31/2013 |
01/31/2013 |
| Basin Wide Redd Counts |
N: 157. Adult Redd Counts |
|
06/15/2012 |
06/15/2012 |
| Post Monitoring Of Major Channel Habitat Improvement Project |
O: 157. Post Monitoring Each Phase (10 Miles ) Of Channel Habitat Improvement Reaches |
|
01/31/2013 |
01/31/2013 |
| Technical Assistance Provided |
P: 122. Provide Technical Assistance & Input |
|
01/31/2013 |
01/31/2013 |
| Stream Water Temperature Monitored |
Q: 157. Monitor Stream Water Temperature In The Trout Creek Basin |
|
01/31/2013 |
01/31/2013 |
| Data Captured In Two Data Bases (One For Adults & One For Juveniles) |
R: 157. Monitor Smolt Production & Adult Escapement |
|
01/31/2013 |
01/31/2013 |
| Exclude Hatchery Summer Steelhead From Wild Trout Creek Summer Steelhead Stock |
S: 190. Remove/Exclude Hatchery Summer Steelhead |
|
06/30/2012 |
06/30/2012 |
| Summer Steelhead Smolts PIT Tagged |
T: 158. PIT Tag Out-Migrant Summer Steelhead Smolts |
|
09/30/2012 |
09/11/2012 |
| PIT Tag Data Submitted To PTAGIS |
U: 159. Submit & Acquire PIT Tag Data To/From PTAGIS |
|
06/30/2012 |
06/30/2012 |
| ESA Listed Mid Columbia Summer Steelhead Monitored |
V: 162. Analyze Adult Summer Steelhead Escapement & Summer Steelhead Smolt Out-Migrant Estimates |
|
01/31/2013 |
01/31/2013 |
| Annual Report For Performance Period 2/1/11 - 1/31/12 |
X: 132. Annual Report |
|
10/01/2012 |
09/11/2012 |
| Manage & Administer Project |
Y: 119. Manage & Administer Project |
|
01/31/2013 |
01/31/2013 |