| Province | Subbasin | % |
|---|---|---|
| Columbia Plateau | John Day | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Produce all required NEPA documents | A: 165. Produce Environmental Compliance Documentation - 2012 | 10/30/2012 | 10/30/2012 | |
| Oliver Ditch 47 and 48 Pipe | B: 149. Oliver Ditch No. 47 & 48 Pipe | 11/01/2012 | 11/01/2012 | |
| Pump startup | C: 186. Murray Diversion Pump Station #1 | 07/31/2012 | 07/31/2012 | |
| Beech Creek Measuring Device | D: 186. Beech Creek Measuring Device | 09/30/2012 | 09/30/2012 | |
| Harley Allen Return Flow Cooling Project | E: 149. Harley Allen RFC | 04/30/2013 | 03/30/2013 | |
| Chandler Passage Improvements | F: 184. Chandler Passage Improvement | 09/30/2013 | 09/30/2013 | |
| Dovenberg Pump Station | G: 84. Dovenberg Pump Station | 09/30/2013 | 09/30/2013 | |
| Holliday Long Meadow Ditch | H: 84. Holliday Long Meadow Ditch Diversion | 09/30/2013 | 09/30/2013 | |
| Final Design | L: 175. Design Voigt Diversions | 08/31/2013 | 08/31/2013 | |
| MNF Camp Creek Culvert 2012 - Big Rock Creek | M: 184. MNF Camp Creek Culvert Replacement 2012 | 09/30/2012 | 09/30/2012 | |
| Mountain Creek Habitat Phase 2 - Instream | N: 29. Mountain Creek Habitat Phase 2 - Instream | 11/01/2012 | 11/01/2012 | |
| Replace Culvert | O: 184. Mountain Creek Habitat Phase 2 - Culvert | 09/30/2012 | 09/30/2012 | |
| Replace Bridge | P: 184. Mountain Creek Habitat Phase 2 - Bridge | 09/30/2012 | 09/30/2012 | |
| Install pivots | S: 150. Lower Bridge Creek Connectivity - Install Pivot | 10/31/2013 | 10/31/2013 | |
| Stock water Developments | U: 34. Bridge-Bear Creek Habitat Water Quality Phase 1 - Stock water development | 12/31/2012 | 12/31/2012 | |
| Spring/Ditch Development | V: 34. Bridge-Bear Creek Habitat Water Quality Phase 1 - Spring Development | 12/31/2012 | 12/31/2012 | |
| Remove Russian Olive | W: 197. Bridge-Bear Creek Habitat Water Quality Phase 1 - Remove Russian Olive | 10/31/2012 | 10/31/2012 | |
| Plantings | X: 47. Bridge-Bear Creek Habitat Water Quality Phase 1 - Plantings | 11/30/2013 | 11/30/2013 | |
| Install Fence | Y: 40. Bridge-Bear Creek Habitat Water Quality Phase 1 - Fence | 06/30/2013 | 06/30/2013 | |
| Instream habitat complexity | Z: 29. Mountain Creek - Jones Habitat Project | 11/01/2013 | 11/01/2013 | |
| Badger Creek #1 Diversion | AA: 84. Badger Creek #1 Diversion | 09/30/2013 | 09/30/2013 | |
| Badger Creek #2 Diversion | AB: 84. Badger Creek #2 Diversion | 09/30/2013 | 09/30/2013 | |
| Install sprinkler | AC: 150. Woodward Phase 3 - Pivot | 11/01/2012 | 11/01/2012 | |
| Install Bridge | AD: 184. Lower Bear Creek Crossing #1 | 09/30/2013 | 09/30/2012 | |
| Install Culvert | AE: 184. Lower Bear Creek Crossing #2 | 09/30/2012 | 09/30/2012 | |
| Final Design | AF: 175. Design Bettencourt Diversion | 06/30/2013 | 06/30/2013 | |
| Final Design | AG: 175. Design Lonerock Culverts | 08/31/2012 | 08/31/2012 | |
| Alternatives Report | AJ: 115. Thirtymile Pipeline Assessment | 11/30/2013 | 11/30/2013 | |
| Final Design | AL: 175. Design Cavender Pump Site | 10/31/2013 | 06/30/2013 | |
| Install Fence | AM: 40. Indian Creek Fence | 11/30/2012 | 09/30/2012 | |
| Ripples in Time | AN: 99. Ripples in Time | 08/31/2012 | 08/31/2012 | |
| Install pipeline | AP: 149. Coelho Riparian Project | 12/31/2013 | 12/31/2013 | |
| Stock water development | AR: 34. Hufstader Water Development | 11/30/2013 | 09/30/2013 | |
| Replace Culvert | AS: 184. Berry Creek Culvert Replacement #1 | 09/30/2012 | 09/30/2012 | |
| Replace Culvert | AT: 184. Berry Creek Culvert Replacement #2 | 09/30/2012 | 09/30/2012 | |
| Little Wilson Creek Aquatic Passage | AU: 184. Little Wilson Creek Aquatic Passage | 09/30/2012 | 09/30/2012 | |
| Analysis of alternatives | AV: 175. Design Dovenberg Habitat | 10/31/2013 | 09/30/2013 | |
| Replace Culvert | AW: 184. Rowe Creek Culvert | 11/30/2012 | 12/31/2012 | |
| Rowe Creek Fish Passage and Habitat Enhancement Design | AX: 175. Design Rowe Creek Passage | 10/31/2012 | 10/31/2012 | |
| Rudio Creek Instream Habitat | AY: 29. Rudio Creek Instream Habitat | 12/31/2012 | 12/31/2012 | |
| Alternatives Report | AZ: 115. Reach Assessment (JDR-Rowe Creek) | 03/31/2013 | 03/31/2013 | |
| Remove 855 acres of juniper and treat 125 acres of noxious weeds | BA: 197. Maxwell Ranch Juniper | 12/01/2013 | 12/01/2013 | |
| Produce all required NEPA documents | BB: 165. Produce Environmental Compliance Documentation - 2013 | 10/30/2013 | 10/30/2013 | |
| Voigt Austin Ranch Ditch Diversion | BC: 84. Voigt Austin Ranch Ditch Diversion | 09/30/2013 | 09/30/2013 | |
| Final Design | CF: 175. Design Mountain Creek Phase 3 | 06/01/2013 | 06/01/2013 | |
| Mountain Creek Habitat Phase 3 | CG: 29. Mountain Creek Habitat Phase 3 | 09/30/2013 | 09/30/2013 | |
| Final Design | CH: 175. Design Lower Bridge-Bear Creek Phase 2 | 06/01/2013 | 06/01/2013 | |
| Lower Bridge-Bear Creek Habitat Water Quality Phase 2 | CI: 29. Lower Bridge-Bear Creek Habitat Water Quality Phase 2 | 09/30/2013 | 09/30/2013 | |
| Final Design | CJ: 175. Design Mountain Creek Phase 4 | 06/01/2013 | 06/01/2013 | |
| Final Design | CK: 175. Design Lower Rock Creek Diversion | 06/01/2013 | 06/01/2013 | |
| Replace Diversion | CL: 84. Lower Rock Creek Diversion | 09/30/2013 | 09/30/2013 | |
| Final Design | CM: 175. Design Badger Creek #3 | 06/01/2013 | 06/01/2013 | |
| Replace Diversion | CN: 84. Badger Creek #3 Diversion | 09/30/2013 | ||
| Final Design | CQ: 175. Design Willow Creek Pipeline | 06/01/2013 | 06/01/2013 | |
| Install Pipeline | CR: 149. Willow Creek Pipeline | 11/30/2013 | 09/30/2013 | |
| Final Design | CS: 175. Design Lonerock Diversion | 06/01/2013 | 06/01/2013 | |
| Cuttings and plants planted at construction sites. | CU: 47. Plant Vegetation - Grant SWCD Construction Sites from 2011/12/13 | 11/30/2013 | 11/30/2013 | |
| Cuttings and plants planted at construction sites of Wheeler SWCD Projects. | CV: 47. Plant Vegetation - Wheeler SWCD Construction Sites from 2011/12/13 | 10/30/2013 | 10/30/2013 | |
| Cuttings and plants planted at construction sites of Gilliam SWCD Projects. | CW: 47. Plant Vegetation - Gilliam SWCD Construction Sites from 2011/12/13 | 10/30/2013 | 10/30/2013 | |
| BPA Project Administration Requirements | CX: 119. Manage Administer Projects | 05/01/2013 | 05/01/2013 | |
| Upper Kayser Passage Improvements | DE: 184. Upper Kayser Passage Improvements | 10/31/2012 | 09/30/2012 | |
| Alternatives Report | DF: 115. Juniper Assessment | 11/30/2012 | 11/30/2012 | |
| Final Design | DG: 175. Cottonwood Diversion Design | 11/30/2013 | 11/30/2013 | |
| Alternatives Report | DI: 115. Dovenberg Pipeline Assessment | 11/30/2013 | 09/30/2013 | |
| Stimac Pump Station | DK: 84. Stimac Pump Station | 11/30/2013 | 11/30/2013 | |
| Enright Return Flow Cooling Project | DL: 149. Enright RFC | 06/30/2013 | 06/30/2013 | |
| Install Riparian Fence | DM: 40. Hay Creek Riparian Fence | 10/31/2013 | 10/31/2013 | |
| Install Riparian Fence | DN: 40. Ten Mile Riparian Fence | 10/31/2013 | 10/31/2013 | |
| Prairie Springs Wildlife Watering Project | DO: 175. Prairie Springs Wildlife Watering Project | 01/31/2014 | ||
| Assessment of Herbicide Use for Juniper Management | DP: 197. Assessment of Herbicide Use for Juniper Management | 01/31/2014 | 12/31/2013 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
| Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Produce Environmental Compliance Documentation - 2012 | 02/01/2012 | ||||||
| B | 149 | Oliver Ditch No. 47 & 48 Pipe | 02/01/2012 | ||||||
| C | 186 | Murray Diversion Pump Station #1 | 06/26/2012 | ||||||
| D | 186 | Beech Creek Measuring Device | 06/26/2012 | ||||||
| E | 149 | Harley Allen RFC | 06/26/2012 | ||||||
| F | 184 | Chandler Passage Improvement | 05/20/2013 | ||||||
| G | 84 | Dovenberg Pump Station | 11/14/2012 | ||||||
| H | 84 | Holliday Long Meadow Ditch Diversion | 07/25/2013 | ||||||
| I | 84 | Jacobs Lower Island Ditch Diversion | |||||||
| J | 84 | Emmel-Mill/Galbraith Ditch Diversion | |||||||
| K | 175 | CANCELED - Design Gibbs Habitat | 02/01/2012 | ||||||
| L | 175 | Design Voigt Diversions | 02/01/2012 | ||||||
| M | 184 | MNF Camp Creek Culvert Replacement 2012 | 02/01/2012 | ||||||
| N | 29 | Mountain Creek Habitat Phase 2 - Instream | 07/09/2012 | ||||||
| O | 184 | Mountain Creek Habitat Phase 2 - Culvert | 07/11/2012 | ||||||
| P | 184 | Mountain Creek Habitat Phase 2 - Bridge | 07/11/2012 | ||||||
| Q | 29 | Lower Bridge Creek Connectivity - Instream Habitat | |||||||
| R | 84 | Lower Bridge Creek Connectivity - Diversion | |||||||
| S | 150 | Lower Bridge Creek Connectivity - Install Pivot | 10/16/2013 | ||||||
| T | 29 | Bridge-Bear Creek Habitat Water Quality Phase 1 - Instream | |||||||
| U | 34 | Bridge-Bear Creek Habitat Water Quality Phase 1 - Stock water development | 10/12/2012 | ||||||
| V | 34 | Bridge-Bear Creek Habitat Water Quality Phase 1 - Spring Development | 10/05/2012 | ||||||
| W | 197 | Bridge-Bear Creek Habitat Water Quality Phase 1 - Remove Russian Olive | |||||||
| X | 47 | Bridge-Bear Creek Habitat Water Quality Phase 1 - Plantings | 10/12/2012 | ||||||
| Y | 40 | Bridge-Bear Creek Habitat Water Quality Phase 1 - Fence | 10/12/2012 | ||||||
| Z | 29 | Mountain Creek - Jones Habitat Project | 08/05/2013 | ||||||
| AA | 84 | Badger Creek #1 Diversion | 02/21/2013 | ||||||
| AB | 84 | Badger Creek #2 Diversion | 08/22/2013 | ||||||
| AC | 150 | Woodward Phase 3 - Pivot | 10/12/2012 | ||||||
| AD | 184 | Lower Bear Creek Crossing #1 | 02/01/2012 | ||||||
| AE | 184 | Lower Bear Creek Crossing #2 | 02/01/2012 | ||||||
| AF | 175 | Design Bettencourt Diversion | 02/01/2012 | ||||||
| AG | 175 | Design Lonerock Culverts | 02/01/2012 | ||||||
| AH | 184 | Lonerock Culvert #1 Buckhorn | |||||||
| AI | 184 | Lonerock Culvert #2 Brown | |||||||
| AJ | 115 | Thirtymile Pipeline Assessment | 02/01/2012 | ||||||
| AK | 149 | Archie Osburn Pipeline Phase 2 | |||||||
| AL | 175 | Design Cavender Pump Site | 02/01/2012 | ||||||
| AM | 40 | Indian Creek Fence | 02/01/2012 | ||||||
| AN | 99 | Ripples in Time | 02/01/2012 | ||||||
| AO | 99 | CANCELED - Stream Smart | 02/01/2012 | ||||||
| AP | 149 | Coelho Riparian Project | 10/12/2012 | ||||||
| AQ | 115 | Rudio Monitoring Data Compliation | 06/26/2012 | ||||||
| AR | 34 | Hufstader Water Development | 10/12/2012 | ||||||
| AS | 184 | Berry Creek Culvert Replacement #1 | 08/06/2012 | ||||||
| AT | 184 | Berry Creek Culvert Replacement #2 | 08/06/2012 | ||||||
| AU | 184 | Little Wilson Creek Aquatic Passage | |||||||
| AV | 175 | Design Dovenberg Habitat | 02/01/2012 | ||||||
| AW | 184 | Rowe Creek Culvert | 11/01/2012 | ||||||
| AX | 175 | Design Rowe Creek Passage | 02/01/2012 | ||||||
| AY | 29 | Rudio Creek Instream Habitat | 02/01/2012 | ||||||
| AZ | 115 | Reach Assessment (JDR-Rowe Creek) | 06/26/2012 | ||||||
| BA | 197 | Maxwell Ranch Juniper | 06/26/2012 | ||||||
| BB | 165 | Produce Environmental Compliance Documentation - 2013 | 02/01/2012 | ||||||
| BC | 84 | Voigt Austin Ranch Ditch Diversion | 07/12/2013 | ||||||
| BD | 84 | Voigt Lower Clear Creek Diversion | |||||||
| BE | 29 | CANCELED - Gibbs Habitat Improvement | |||||||
| BF | 175 | Design Jacobs Roberts Creek Diversion | 02/01/2012 | ||||||
| BG | 184 | Jacobs Roberts Creek Diversion | |||||||
| BH | 175 | Design Baucum Passage Improvements | 02/01/2012 | ||||||
| BI | 184 | Baucum Passage Improvements | |||||||
| BJ | 175 | Design Enterprise Improvements | 02/01/2012 | ||||||
| BK | 184 | Enterprise Passage Improvements | |||||||
| BL | 175 | CANCELED - Design Meredith Diversion 1 | 02/01/2012 | ||||||
| BM | 84 | CANCELED - Meredith Beech Creek Diversion 1 | |||||||
| BN | 175 | CANCELED - Design Meredith Diversion 2 | 02/01/2012 | ||||||
| BO | 84 | CANCELED - Meredith Beech Creek Diversion 2 | |||||||
| BP | 175 | CANCELED - Design Meredith Diversion 3 | 02/01/2012 | ||||||
| BQ | 84 | CANCELED - Meredith Beech Creek Diversion 3 | |||||||
| BR | 175 | CANCELED - Design Ricco Bradford Diversion | 02/01/2012 | ||||||
| BS | 84 | CANCELED - Ricco Bradford Ditch Diversion | |||||||
| BT | 175 | CANCELED - Design Ricco Settlemire Diversion | 02/01/2012 | ||||||
| BU | 84 | CANCELED - Ricco Settlemire Ditch Diversion | |||||||
| BV | 175 | CANCELED - Design Ricco Ditch | 02/01/2012 | ||||||
| BW | 84 | CANCELED - Ricco Ditch Diversion | |||||||
| BX | 175 | CANCELED - Design Ricco Unnamed Ditch | 02/01/2012 | ||||||
| BY | 84 | CANCELED - Ricco Unnamed Ditch Diverison | |||||||
| BZ | 175 | CANCELED - Design Ricco Hall Ditch | 02/01/2012 | ||||||
| CA | 84 | CANCELED - Ricco Hall Ditch Diversion | |||||||
| CB | 175 | CANCELED - Design Ricco JDR Diversion | 02/01/2012 | ||||||
| CC | 84 | CANCELED - Ricco John Day River Ditch | |||||||
| CD | 175 | CANCELED - Design Ledgerwood Diversion | 02/01/2012 | ||||||
| CE | 84 | CANCELED - Ledgerwood Diversion | |||||||
| CF | 175 | Design Mountain Creek Phase 3 | 02/01/2012 | ||||||
| CG | 29 | Mountain Creek Habitat Phase 3 | 08/29/2013 | ||||||
| CH | 175 | Design Lower Bridge-Bear Creek Phase 2 | 02/01/2012 | ||||||
| CI | 29 | Lower Bridge-Bear Creek Habitat Water Quality Phase 2 | 10/16/2013 | ||||||
| CJ | 175 | Design Mountain Creek Phase 4 | 02/01/2012 | ||||||
| CK | 175 | Design Lower Rock Creek Diversion | 02/01/2012 | ||||||
| CL | 84 | Lower Rock Creek Diversion | 08/13/2013 | ||||||
| CM | 175 | Design Badger Creek #3 | 02/01/2012 | ||||||
| CN | 84 | Badger Creek #3 Diversion | |||||||
| CO | 175 | CANCELED - Design Upper Bear Creek Habitat | 02/01/2012 | ||||||
| CP | 29 | CANCELED - Upper Bear Creek Habitat | |||||||
| CQ | 175 | Design Willow Creek Pipeline | 02/01/2012 | ||||||
| CR | 149 | Willow Creek Pipeline | |||||||
| CS | 175 | Design Lonerock Diversion | 02/01/2012 | ||||||
| CT | 84 | Lonerock Diversion | |||||||
| CU | 47 | Plant Vegetation - Grant SWCD Construction Sites from 2011/12/13 | 02/01/2012 | ||||||
| CV | 47 | Plant Vegetation - Wheeler SWCD Construction Sites from 2011/12/13 | 02/01/2012 | ||||||
| CW | 47 | Plant Vegetation - Gilliam SWCD Construction Sites from 2011/12/13 | 02/01/2012 | ||||||
| CX | 119 | Manage Administer Projects | 02/01/2012 | ||||||
| CY | 185 | Periodic Status Reports for BPA | 02/01/2012 | ||||||
| CZ | 132 | Submit Progress Report for the period (Feb 1 2011) to (Jan 31 2012) | 02/01/2012 | ||||||
| DA | 132 | Submit Progress Report for the period (Feb 1 2012) to (Jan 31 2013) | 02/01/2012 | ||||||
| DB | 132 | Submit Progress Report for the period (Feb 1 2010) to (Jan 31 2011) | 02/01/2012 | ||||||
| DC | 29 | Holliday Streambank | |||||||
| DD | 184 | MNF Camp Creek Culvert Replacement 2013 | |||||||
| DE | 184 | Upper Kayser Passage Improvements | 10/16/2013 | ||||||
| DF | 115 | Juniper Assessment | 02/01/2012 | ||||||
| DG | 175 | Cottonwood Diversion Design | 02/01/2012 | ||||||
| DH | 175 | CANCELED - Wall Creek Crossing Design | 02/01/2012 | ||||||
| DI | 115 | Dovenberg Pipeline Assessment | 02/01/2012 | ||||||
| DJ | 84 | CANCELED - FCA Diversion | |||||||
| DK | 84 | Stimac Pump Station | |||||||
| DL | 149 | Enright RFC | 10/16/2013 | ||||||
| DM | 40 | Hay Creek Riparian Fence | 01/02/2013 | ||||||
| DN | 40 | Ten Mile Riparian Fence | 10/23/2013 | ||||||
| DO | 175 | Prairie Springs Wildlife Watering Project | 02/01/2012 | ||||||
| DP | 197 | Assessment of Herbicide Use for Juniper Management | 10/16/2013 |