Contract 56228: 2007-397-00 CAP JOHN DAY TRIB/PASS & FLOW-CAP
Project Number:
Title:
John Day Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
56228
Contract Title:
2007-397-00 CAP JOHN DAY TRIB/PASS & FLOW-CAP
Contract Continuation:
Previous: Next:
46942: 2007-397-00 CAP JOHN DAY TRIB/PASS & FLOW-CAP
  • 64905: 2007-397-00 CAP JOHN DAY TRIB/PASS & FLOW
Contract Status:
Closed
Contract Description:
The John Day is the nation’s second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish.  Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon’s fourth largest drainage basin, and incorporates portions of eleven counties.  Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam.  With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance.

The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes).  In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands.  Once established, the John Day Basin Office (JDBO) formed a partnership with local  Soil and Water Conservation Districts, Watershed Councils, and other organizations to assist in the implementation of these projects.

For projects covered under the Capital contract, the JDBO works with local SWCDs, Watershed Councils, and other agencies to complete landowner contacts, preliminary planning, engineering designs, permitting, construction contracting, and construction implementation phases for most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, juniper removal contracting, water development implementation, riparian planting, and reporting portion of the program.  Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies.
Account Type(s):
Capital
Contract Start Date:
02/01/2012
Contract End Date:
01/31/2014
Current Contract Value:
$3,651,814
Expenditures:
$3,651,814

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Amy Charette Confederated Tribes of Warm Springs Yes Contract Manager amy.charette@ctwsbnr.org (541) 575-1866
Jamie Cleveland Bonneville Power Administration Yes COR jacleveland@bpa.gov (503) 230-3160
Brian Cochran Confederated Tribes of Warm Springs Yes Supervisor brian.cochran@ctwsbnr.org (541) 553-2003
Brad Houslet Confederated Tribes of Warm Springs Yes Supervisor brad.houslet@ctwsbnr.org (541) 553-2039
Dennis Johnson Confederated Tribes of Warm Springs No Interested Party dennis.johnson@wstribes.org (541) 553-3479
Archie Martell Confederated Tribes of Warm Springs No Technical Contact archie.martell@wstribes.org (541) 575-1866
Arthur Mitchell Confederated Tribes of Warm Springs No Administrative Contact arthur.mitchell@wstribes.org (541) 553-3219
Chris Moan Confederated Tribes of Warm Springs No Technical Contact chris.moan@ctwsbnr.org (541) 575-1866
Jenna Peterson Bonneville Power Administration Yes Env. Compliance Lead jepeterson@bpa.gov (503) 230-3018
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Lori Switzler Confederated Tribes of Warm Springs No Administrative Contact lswitzler@wstribes.org (541) 553-3487
Scott Turo Confederated Tribes of Warm Springs Yes Supervisor scott.turo@ctwsbnr.org (541) 553-2025
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Sean Welch Bonneville Power Administration No Interested Party spwelch@bpa.gov (503) 230-7691


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Produce all required NEPA documents A: 165. Produce Environmental Compliance Documentation - 2012 10/30/2012 10/30/2012
Oliver Ditch 47 and 48 Pipe B: 149. Oliver Ditch No. 47 & 48 Pipe 11/01/2012 11/01/2012
Pump startup C: 186. Murray Diversion Pump Station #1 07/31/2012 07/31/2012
Beech Creek Measuring Device D: 186. Beech Creek Measuring Device 09/30/2012 09/30/2012
Harley Allen Return Flow Cooling Project E: 149. Harley Allen RFC 04/30/2013 03/30/2013
Chandler Passage Improvements F: 184. Chandler Passage Improvement 09/30/2013 09/30/2013
Dovenberg Pump Station G: 84. Dovenberg Pump Station 09/30/2013 09/30/2013
Holliday Long Meadow Ditch H: 84. Holliday Long Meadow Ditch Diversion 09/30/2013 09/30/2013
Final Design L: 175. Design Voigt Diversions 08/31/2013 08/31/2013
MNF Camp Creek Culvert 2012 - Big Rock Creek M: 184. MNF Camp Creek Culvert Replacement 2012 09/30/2012 09/30/2012
Mountain Creek Habitat Phase 2 - Instream N: 29. Mountain Creek Habitat Phase 2 - Instream 11/01/2012 11/01/2012
Replace Culvert O: 184. Mountain Creek Habitat Phase 2 - Culvert 09/30/2012 09/30/2012
Replace Bridge P: 184. Mountain Creek Habitat Phase 2 - Bridge 09/30/2012 09/30/2012
Install pivots S: 150. Lower Bridge Creek Connectivity - Install Pivot 10/31/2013 10/31/2013
Stock water Developments U: 34. Bridge-Bear Creek Habitat Water Quality Phase 1 - Stock water development 12/31/2012 12/31/2012
Spring/Ditch Development V: 34. Bridge-Bear Creek Habitat Water Quality Phase 1 - Spring Development 12/31/2012 12/31/2012
Remove Russian Olive W: 197. Bridge-Bear Creek Habitat Water Quality Phase 1 - Remove Russian Olive 10/31/2012 10/31/2012
Plantings X: 47. Bridge-Bear Creek Habitat Water Quality Phase 1 - Plantings 11/30/2013 11/30/2013
Install Fence Y: 40. Bridge-Bear Creek Habitat Water Quality Phase 1 - Fence 06/30/2013 06/30/2013
Instream habitat complexity Z: 29. Mountain Creek - Jones Habitat Project 11/01/2013 11/01/2013
Badger Creek #1 Diversion AA: 84. Badger Creek #1 Diversion 09/30/2013 09/30/2013
Badger Creek #2 Diversion AB: 84. Badger Creek #2 Diversion 09/30/2013 09/30/2013
Install sprinkler AC: 150. Woodward Phase 3 - Pivot 11/01/2012 11/01/2012
Install Bridge AD: 184. Lower Bear Creek Crossing #1 09/30/2013 09/30/2012
Install Culvert AE: 184. Lower Bear Creek Crossing #2 09/30/2012 09/30/2012
Final Design AF: 175. Design Bettencourt Diversion 06/30/2013 06/30/2013
Final Design AG: 175. Design Lonerock Culverts 08/31/2012 08/31/2012
Alternatives Report AJ: 115. Thirtymile Pipeline Assessment 11/30/2013 11/30/2013
Final Design AL: 175. Design Cavender Pump Site 10/31/2013 06/30/2013
Install Fence AM: 40. Indian Creek Fence 11/30/2012 09/30/2012
Ripples in Time AN: 99. Ripples in Time 08/31/2012 08/31/2012
Install pipeline AP: 149. Coelho Riparian Project 12/31/2013 12/31/2013
Stock water development AR: 34. Hufstader Water Development 11/30/2013 09/30/2013
Replace Culvert AS: 184. Berry Creek Culvert Replacement #1 09/30/2012 09/30/2012
Replace Culvert AT: 184. Berry Creek Culvert Replacement #2 09/30/2012 09/30/2012
Little Wilson Creek Aquatic Passage AU: 184. Little Wilson Creek Aquatic Passage 09/30/2012 09/30/2012
Analysis of alternatives AV: 175. Design Dovenberg Habitat 10/31/2013 09/30/2013
Replace Culvert AW: 184. Rowe Creek Culvert 11/30/2012 12/31/2012
Rowe Creek Fish Passage and Habitat Enhancement Design AX: 175. Design Rowe Creek Passage 10/31/2012 10/31/2012
Rudio Creek Instream Habitat AY: 29. Rudio Creek Instream Habitat 12/31/2012 12/31/2012
Alternatives Report AZ: 115. Reach Assessment (JDR-Rowe Creek) 03/31/2013 03/31/2013
Remove 855 acres of juniper and treat 125 acres of noxious weeds BA: 197. Maxwell Ranch Juniper 12/01/2013 12/01/2013
Produce all required NEPA documents BB: 165. Produce Environmental Compliance Documentation - 2013 10/30/2013 10/30/2013
Voigt Austin Ranch Ditch Diversion BC: 84. Voigt Austin Ranch Ditch Diversion 09/30/2013 09/30/2013
Final Design CF: 175. Design Mountain Creek Phase 3 06/01/2013 06/01/2013
Mountain Creek Habitat Phase 3 CG: 29. Mountain Creek Habitat Phase 3 09/30/2013 09/30/2013
Final Design CH: 175. Design Lower Bridge-Bear Creek Phase 2 06/01/2013 06/01/2013
Lower Bridge-Bear Creek Habitat Water Quality Phase 2 CI: 29. Lower Bridge-Bear Creek Habitat Water Quality Phase 2 09/30/2013 09/30/2013
Final Design CJ: 175. Design Mountain Creek Phase 4 06/01/2013 06/01/2013
Final Design CK: 175. Design Lower Rock Creek Diversion 06/01/2013 06/01/2013
Replace Diversion CL: 84. Lower Rock Creek Diversion 09/30/2013 09/30/2013
Final Design CM: 175. Design Badger Creek #3 06/01/2013 06/01/2013
Replace Diversion CN: 84. Badger Creek #3 Diversion 09/30/2013
Final Design CQ: 175. Design Willow Creek Pipeline 06/01/2013 06/01/2013
Install Pipeline CR: 149. Willow Creek Pipeline 11/30/2013 09/30/2013
Final Design CS: 175. Design Lonerock Diversion 06/01/2013 06/01/2013
Cuttings and plants planted at construction sites. CU: 47. Plant Vegetation - Grant SWCD Construction Sites from 2011/12/13 11/30/2013 11/30/2013
Cuttings and plants planted at construction sites of Wheeler SWCD Projects. CV: 47. Plant Vegetation - Wheeler SWCD Construction Sites from 2011/12/13 10/30/2013 10/30/2013
Cuttings and plants planted at construction sites of Gilliam SWCD Projects. CW: 47. Plant Vegetation - Gilliam SWCD Construction Sites from 2011/12/13 10/30/2013 10/30/2013
BPA Project Administration Requirements CX: 119. Manage Administer Projects 05/01/2013 05/01/2013
Upper Kayser Passage Improvements DE: 184. Upper Kayser Passage Improvements 10/31/2012 09/30/2012
Alternatives Report DF: 115. Juniper Assessment 11/30/2012 11/30/2012
Final Design DG: 175. Cottonwood Diversion Design 11/30/2013 11/30/2013
Alternatives Report DI: 115. Dovenberg Pipeline Assessment 11/30/2013 09/30/2013
Stimac Pump Station DK: 84. Stimac Pump Station 11/30/2013 11/30/2013
Enright Return Flow Cooling Project DL: 149. Enright RFC 06/30/2013 06/30/2013
Install Riparian Fence DM: 40. Hay Creek Riparian Fence 10/31/2013 10/31/2013
Install Riparian Fence DN: 40. Ten Mile Riparian Fence 10/31/2013 10/31/2013
Prairie Springs Wildlife Watering Project DO: 175. Prairie Springs Wildlife Watering Project 01/31/2014
Assessment of Herbicide Use for Juniper Management DP: 197. Assessment of Herbicide Use for Juniper Management 01/31/2014 12/31/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 3 instances of WE 197 Maintain/Remove Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 10 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 3 instances of WE 34 Develop Alternative Water Source
  • 4 instances of WE 40 Install Fence
  • 4 instances of WE 47 Plant Vegetation
  • 24 instances of WE 84 Remove/Install Diversion
  • 17 instances of WE 184 Install Fish Passage Structure
  • 5 instances of WE 115 Produce Inventory or Assessment
  • 31 instances of WE 175 Produce Design
  • 6 instances of WE 149 Install Pipeline
  • 2 instances of WE 150 Install Sprinkler
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 3 instances of WE 197 Maintain/Remove Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 10 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 3 instances of WE 34 Develop Alternative Water Source
  • 4 instances of WE 40 Install Fence
  • 4 instances of WE 47 Plant Vegetation
  • 24 instances of WE 84 Remove/Install Diversion
  • 17 instances of WE 184 Install Fish Passage Structure
  • 5 instances of WE 115 Produce Inventory or Assessment
  • 31 instances of WE 175 Produce Design
  • 6 instances of WE 149 Install Pipeline
  • 2 instances of WE 150 Install Sprinkler

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Environmental Compliance Documentation - 2012 02/01/2012
B 149 Oliver Ditch No. 47 & 48 Pipe 02/01/2012
C 186 Murray Diversion Pump Station #1 06/26/2012
D 186 Beech Creek Measuring Device 06/26/2012
E 149 Harley Allen RFC 06/26/2012
F 184 Chandler Passage Improvement 05/20/2013
G 84 Dovenberg Pump Station 11/14/2012
H 84 Holliday Long Meadow Ditch Diversion 07/25/2013
I 84 Jacobs Lower Island Ditch Diversion
J 84 Emmel-Mill/Galbraith Ditch Diversion
K 175 CANCELED - Design Gibbs Habitat 02/01/2012
L 175 Design Voigt Diversions 02/01/2012
M 184 MNF Camp Creek Culvert Replacement 2012 02/01/2012
N 29 Mountain Creek Habitat Phase 2 - Instream 07/09/2012
O 184 Mountain Creek Habitat Phase 2 - Culvert 07/11/2012
P 184 Mountain Creek Habitat Phase 2 - Bridge 07/11/2012
Q 29 Lower Bridge Creek Connectivity - Instream Habitat
R 84 Lower Bridge Creek Connectivity - Diversion
S 150 Lower Bridge Creek Connectivity - Install Pivot 10/16/2013
T 29 Bridge-Bear Creek Habitat Water Quality Phase 1 - Instream
U 34 Bridge-Bear Creek Habitat Water Quality Phase 1 - Stock water development 10/12/2012
V 34 Bridge-Bear Creek Habitat Water Quality Phase 1 - Spring Development 10/05/2012
W 197 Bridge-Bear Creek Habitat Water Quality Phase 1 - Remove Russian Olive
X 47 Bridge-Bear Creek Habitat Water Quality Phase 1 - Plantings 10/12/2012
Y 40 Bridge-Bear Creek Habitat Water Quality Phase 1 - Fence 10/12/2012
Z 29 Mountain Creek - Jones Habitat Project 08/05/2013
AA 84 Badger Creek #1 Diversion 02/21/2013
AB 84 Badger Creek #2 Diversion 08/22/2013
AC 150 Woodward Phase 3 - Pivot 10/12/2012
AD 184 Lower Bear Creek Crossing #1 02/01/2012
AE 184 Lower Bear Creek Crossing #2 02/01/2012
AF 175 Design Bettencourt Diversion 02/01/2012
AG 175 Design Lonerock Culverts 02/01/2012
AH 184 Lonerock Culvert #1 Buckhorn
AI 184 Lonerock Culvert #2 Brown
AJ 115 Thirtymile Pipeline Assessment 02/01/2012
AK 149 Archie Osburn Pipeline Phase 2
AL 175 Design Cavender Pump Site 02/01/2012
AM 40 Indian Creek Fence 02/01/2012
AN 99 Ripples in Time 02/01/2012
AO 99 CANCELED - Stream Smart 02/01/2012
AP 149 Coelho Riparian Project 10/12/2012
AQ 115 Rudio Monitoring Data Compliation 06/26/2012
AR 34 Hufstader Water Development 10/12/2012
AS 184 Berry Creek Culvert Replacement #1 08/06/2012
AT 184 Berry Creek Culvert Replacement #2 08/06/2012
AU 184 Little Wilson Creek Aquatic Passage
AV 175 Design Dovenberg Habitat 02/01/2012
AW 184 Rowe Creek Culvert 11/01/2012
AX 175 Design Rowe Creek Passage 02/01/2012
AY 29 Rudio Creek Instream Habitat 02/01/2012
AZ 115 Reach Assessment (JDR-Rowe Creek) 06/26/2012
BA 197 Maxwell Ranch Juniper 06/26/2012
BB 165 Produce Environmental Compliance Documentation - 2013 02/01/2012
BC 84 Voigt Austin Ranch Ditch Diversion 07/12/2013
BD 84 Voigt Lower Clear Creek Diversion
BE 29 CANCELED - Gibbs Habitat Improvement
BF 175 Design Jacobs Roberts Creek Diversion 02/01/2012
BG 184 Jacobs Roberts Creek Diversion
BH 175 Design Baucum Passage Improvements 02/01/2012
BI 184 Baucum Passage Improvements
BJ 175 Design Enterprise Improvements 02/01/2012
BK 184 Enterprise Passage Improvements
BL 175 CANCELED - Design Meredith Diversion 1 02/01/2012
BM 84 CANCELED - Meredith Beech Creek Diversion 1
BN 175 CANCELED - Design Meredith Diversion 2 02/01/2012
BO 84 CANCELED - Meredith Beech Creek Diversion 2
BP 175 CANCELED - Design Meredith Diversion 3 02/01/2012
BQ 84 CANCELED - Meredith Beech Creek Diversion 3
BR 175 CANCELED - Design Ricco Bradford Diversion 02/01/2012
BS 84 CANCELED - Ricco Bradford Ditch Diversion
BT 175 CANCELED - Design Ricco Settlemire Diversion 02/01/2012
BU 84 CANCELED - Ricco Settlemire Ditch Diversion
BV 175 CANCELED - Design Ricco Ditch 02/01/2012
BW 84 CANCELED - Ricco Ditch Diversion
BX 175 CANCELED - Design Ricco Unnamed Ditch 02/01/2012
BY 84 CANCELED - Ricco Unnamed Ditch Diverison
BZ 175 CANCELED - Design Ricco Hall Ditch 02/01/2012
CA 84 CANCELED - Ricco Hall Ditch Diversion
CB 175 CANCELED - Design Ricco JDR Diversion 02/01/2012
CC 84 CANCELED - Ricco John Day River Ditch
CD 175 CANCELED - Design Ledgerwood Diversion 02/01/2012
CE 84 CANCELED - Ledgerwood Diversion
CF 175 Design Mountain Creek Phase 3 02/01/2012
CG 29 Mountain Creek Habitat Phase 3 08/29/2013
CH 175 Design Lower Bridge-Bear Creek Phase 2 02/01/2012
CI 29 Lower Bridge-Bear Creek Habitat Water Quality Phase 2 10/16/2013
CJ 175 Design Mountain Creek Phase 4 02/01/2012
CK 175 Design Lower Rock Creek Diversion 02/01/2012
CL 84 Lower Rock Creek Diversion 08/13/2013
CM 175 Design Badger Creek #3 02/01/2012
CN 84 Badger Creek #3 Diversion
CO 175 CANCELED - Design Upper Bear Creek Habitat 02/01/2012
CP 29 CANCELED - Upper Bear Creek Habitat
CQ 175 Design Willow Creek Pipeline 02/01/2012
CR 149 Willow Creek Pipeline
CS 175 Design Lonerock Diversion 02/01/2012
CT 84 Lonerock Diversion
CU 47 Plant Vegetation - Grant SWCD Construction Sites from 2011/12/13 02/01/2012
CV 47 Plant Vegetation - Wheeler SWCD Construction Sites from 2011/12/13 02/01/2012
CW 47 Plant Vegetation - Gilliam SWCD Construction Sites from 2011/12/13 02/01/2012
CX 119 Manage Administer Projects 02/01/2012
CY 185 Periodic Status Reports for BPA 02/01/2012
CZ 132 Submit Progress Report for the period (Feb 1 2011) to (Jan 31 2012) 02/01/2012
DA 132 Submit Progress Report for the period (Feb 1 2012) to (Jan 31 2013) 02/01/2012
DB 132 Submit Progress Report for the period (Feb 1 2010) to (Jan 31 2011) 02/01/2012
DC 29 Holliday Streambank
DD 184 MNF Camp Creek Culvert Replacement 2013
DE 184 Upper Kayser Passage Improvements 10/16/2013
DF 115 Juniper Assessment 02/01/2012
DG 175 Cottonwood Diversion Design 02/01/2012
DH 175 CANCELED - Wall Creek Crossing Design 02/01/2012
DI 115 Dovenberg Pipeline Assessment 02/01/2012
DJ 84 CANCELED - FCA Diversion
DK 84 Stimac Pump Station
DL 149 Enright RFC 10/16/2013
DM 40 Hay Creek Riparian Fence 01/02/2013
DN 40 Ten Mile Riparian Fence 10/23/2013
DO 175 Prairie Springs Wildlife Watering Project 02/01/2012
DP 197 Assessment of Herbicide Use for Juniper Management 10/16/2013