Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 57257: 1987-100-01 EXP UMATILLA ANAD FISH HAB - CTUIR
Project Number:
Title:
Umatilla Anadromous Fish Habitat-Umatilla Tribe
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
57257
Contract Title:
1987-100-01 EXP UMATILLA ANAD FISH HAB - CTUIR
Contract Continuation:
Previous: Next:
52770: 1987-100-01 EXP UMATILLA ANAD FISH HAB - CTUIR
  • 60836: 1987-100-01 EXP UMATILLA ANAD FISH HAB - CTUIR
Contract Status:
Closed
Contract Description:
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose ongoing fish habitat protection, restoration and enhancement, maintenance, and monitoring activities under the CTUIR Umatilla Anadromous Fish Habitat Project (198710001) to achieve the aquatic biological objectives and strategies and management plans established in the Umatilla Subbasin Plan (NPCC, 2004) and the Northwest Power and Conservation Council (NPCC) Fish and Wildlife Program (NPPC 2000).

The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore functional floodplain, channel, and watershed processes to provide sustainable and healthy habitat for aquatic species in the Umatilla River Basin, including Threatened Mid-Columbia summer steelhead.  Project work further supports the CTUIR Department of Natural Resource ecological (River Vision 2008) and First Foods mission statements to sustain production.

The following is an agreement between BPA and CTUIR to provide funds for implementing habitat enhancement actions in the Umatilla River Basin.
Account Type(s):
Expense
Contract Start Date:
02/01/2012
Contract End Date:
01/31/2013
Current Contract Value:
$1,477,426
Expenditures:
$1,477,426

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Upload SOW, budget, property inventory for upcoming contract period to Pisces. B: 119. Manage and Administer Project 11/01/2012 11/01/2012
Receipt of environmental compliance clearance on project work elements from BPA C: 165. Produce Environmental Compliance Documentation 01/31/2013 01/31/2013
Attach 2011 Annual Progress Report in Pisces D: 132. Produce Annual Progress Report for the FY 2011 period (Feb 2011) to (Jan 2012) 01/31/2013 01/31/2013
Attach Progress Report in Pisces E: 132. Submit combined 2009/2010 Progress Report- carry over from FY11 contract 11/30/2012 11/30/2012
List of final projects F: 114. CTUIR Umatilla Subbasin Restoration Coordination 01/31/2013 12/31/2012
Provide technical input and summaries to enhance or protect natural resources in the subbasin. G: 122. Review and provide technical input on issues and topics that affect the areas natural resource 01/31/2013 01/31/2013
Coordinate watershed association activities H: 191. Umatilla River Watershed coordination duties 01/31/2013 01/31/2013
Complete outreach and education activities I: 99. Public Outreach and Education 01/31/2013 12/31/2012
Maximize survival of native vegetation in enhancement project areas J: 197. Maintain vegetation and control noxious weeds in project areas within the Umatilla River Basin 01/31/2013 12/31/2012
Complete scheduled tree and shrub plantings in project areas K: 47. Supplement riparian areas of existing and new projects with additional vegetation 01/31/2013 01/31/2013
Maintain proper operation of instream habitat structures L: 186. Inspect and maintain function of instream improvement structures 01/31/2013 01/31/2013
Maintenance of land or structures associated with conservation easements M: 186. Maintenance of habitat features associated with project conservation easements 01/31/2013 01/31/2013
Meacham Creek Restoration Design and Implementation Plan, River Miles 7.0-8.5 N: 175. Meacham Creek Restoration Reach Design, river miles 7.0 to 8.5 01/31/2013 01/31/2013
Maintain 355 acres (61 riparian, 294 upland) in project area O: 197. Enhance native vegetation growth in the B&G Resources Property, Umatilla River (RM 41-44) 11/30/2012 11/30/2012
Construction technical oversight of the Birch Creek Taylor Dam Removal and Habitat Restoration Proj P: 100. Construction Oversight of the Birch Creek Taylor Dam Removal and Habitat Restoration Project 01/31/2013 01/31/2013
Construction technical oversight of the West Birch Creek Low Dam Removal and Habitat Rest Project Q: 100. Construction Oversight of the West Birch Creek Low Barrier Removal and Habitat Restoration Project 01/31/2013 01/31/2013
Produce methods for monitoring project effectiveness R: 156. Incorporate developed strategic and scientifically accepted monitoring methods for application 01/31/2013 01/31/2013
Incorporate project effectiveness data into project activities and annual BPA reporting S: 115. Field Data Collection 01/31/2013 01/31/2013
Data findings are incorporated annually into project activities. T: 159. Monitoring and Evaluation CTUIR Umatilla Anadromous Fish Habitat Project 01/31/2013 01/31/2013
Samples analyzed and data uploaded to CTUIR water quality data base U: 157. Meacham Creek Water Quality ISCO Sampling and Analysis 01/31/2013 01/31/2013
Written summary report describing the 2011 and 2012 findings compared to previous work. V: 157. Macroinvertebrate study for evaluating Meacham Creek restoration effectiveness 01/31/2013 01/31/2013
Upload about 150 project effectiveness photo point photos to CTUIR data depository. W: 157. Project Effectiveness Photo Point Monitoring 01/31/2013 01/31/2013
A summary report with data analysis and findings will be incorporated into the annual report. X: 157. Geomorphic-Hyporheic Flow Study on Meacham Creek 01/31/2013 01/31/2013
USGS posted real-time accurate instantaneous stream flow data Y: 157. Meacham Flow/Hydrology Monitoring (USGS) 01/31/2013 01/31/2013
Final report and summarized data uploaded in a data repository Z: 157. Meacham CHaMP Compatible Salmonid Habitat Surveys 01/31/2013 01/31/2013
Attach Meacham Creek Floodplain Restoration and In-Stream Enhancement Phase 1 Completion Report AA: 141. Meacham Creek Floodplain Restoration and In-Stream Enhancement Phase 1 Completion Report 11/15/2012 11/15/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 175 Produce Design
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 197 Maintain/Remove Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 2 instances of WE 100 Construction Management
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 175 Produce Design
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2012
B 119 Manage and Administer Project 02/01/2012
C 165 Produce Environmental Compliance Documentation 02/01/2012
D 132 Produce Annual Progress Report for the FY 2011 period (Feb 2011) to (Jan 2012) 02/01/2012
E 132 Submit combined 2009/2010 Progress Report- carry over from FY11 contract 02/01/2012
F 114 CTUIR Umatilla Subbasin Restoration Coordination 02/01/2012
G 122 Review and provide technical input on issues and topics that affect the areas natural resource 02/01/2012
H 191 Umatilla River Watershed coordination duties 02/01/2012
I 99 Public Outreach and Education 02/01/2012
J 197 Maintain vegetation and control noxious weeds in project areas within the Umatilla River Basin 05/17/2012
K 47 Supplement riparian areas of existing and new projects with additional vegetation 05/17/2012
L 186 Inspect and maintain function of instream improvement structures 05/17/2012
M 186 Maintenance of habitat features associated with project conservation easements 05/17/2012
N 175 Meacham Creek Restoration Reach Design, river miles 7.0 to 8.5 02/01/2012
O 197 Enhance native vegetation growth in the B&G Resources Property, Umatilla River (RM 41-44) 05/17/2012
P 100 Construction Oversight of the Birch Creek Taylor Dam Removal and Habitat Restoration Project 02/01/2012
Q 100 Construction Oversight of the West Birch Creek Low Barrier Removal and Habitat Restoration Project 02/01/2012
R 156 Incorporate developed strategic and scientifically accepted monitoring methods for application 02/01/2012
S 115 Field Data Collection 02/01/2012
T 159 Monitoring and Evaluation CTUIR Umatilla Anadromous Fish Habitat Project 02/01/2012
U 157 Meacham Creek Water Quality ISCO Sampling and Analysis 02/01/2012
V 157 Macroinvertebrate study for evaluating Meacham Creek restoration effectiveness 02/01/2012
W 157 Project Effectiveness Photo Point Monitoring 02/01/2012
X 157 Geomorphic-Hyporheic Flow Study on Meacham Creek 02/01/2012
Y 157 Meacham Flow/Hydrology Monitoring (USGS) 02/01/2012
Z 157 Meacham CHaMP Compatible Salmonid Habitat Surveys 02/01/2012
AA 141 Meacham Creek Floodplain Restoration and In-Stream Enhancement Phase 1 Completion Report 02/01/2012