Environmental compliance |
A: 165. Environmental Compliance |
|
05/31/2012 |
05/31/2012 |
20 rainbow trout radio tagged and tracked through Fall 2012 |
B: 158. Radio tag rainbow trout |
|
10/12/2012 |
10/12/2012 |
Receiver downloads/maintenance/takedown |
C: 157. Mobile track and download stationary receivers |
|
03/28/2013 |
03/28/2013 |
Identify overwintering locations of rainbow trout |
D: 157. Identify overwintering locations of rainbow trout |
|
04/30/2013 |
04/30/2013 |
Analysis and Interpretation of three year dataset on movements and overwintering habitat |
E: 162. Analysis and interpreting of overwintering and movement data. |
|
03/15/2013 |
03/15/2013 |
Install Fish Monitoring Equipment |
F: 70. Install screw traps on the Sanpoil River |
|
04/30/2013 |
04/30/2013 |
Install Fish Monitoring Equipment |
G: 70. Install PIT tag array on the Sanpoil River |
|
04/30/2013 |
04/30/2013 |
Collect adult rainbow trout in the Sanpoil River weir |
H: 157. Collect adult rainbow trout in the Sanpoil River weir |
|
04/30/2013 |
04/30/2013 |
Collect juvenile rainbow trout |
I: 157. Collect juvenile rainbow trout in screw traps |
|
04/30/2013 |
04/30/2013 |
Monitor PIT tag array on the Sanpoil River |
J: 157. Monitor PIT tag array |
|
04/30/2013 |
04/30/2013 |
Collect Harvest Data from Lake Roosevelt creel survey |
K: 157. Collect harvest data from creel surveys |
|
04/30/2013 |
04/30/2013 |
PIT tagged rainbow trout |
L: 158. PIT tag rainbow trout |
|
04/30/2013 |
04/30/2013 |
Analysis and interpretation of weir trap data |
M: 162. Analyze and interpret weir trap data |
|
04/30/2013 |
04/30/2013 |
Analysis and interpretation of screw trap data |
N: 162. Analyze and interpret screw trap data |
|
04/30/2013 |
04/30/2013 |
Analysis and interpretation of PIT tag array data |
O: 162. Analyze and interpret PIT tag array data |
|
04/30/2013 |
04/30/2013 |
Analysis and interpretation of creel data |
P: 162. Analyze and interpret creel data |
|
04/30/2013 |
04/30/2013 |
Provide assistance with predator removal |
Q: 190. Assist with Predator Removal in the Sanpoil River |
|
04/30/2013 |
06/29/2012 |
Funding Package - Submit draft to COTR |
R: 119. Project Administration |
|
12/03/2012 |
12/03/2012 |
Final Technical Report from sub-contractor for 2010-2013 Movement Study |
T: 132. Submit Progress Report for the contract period 5/1/2010 - 4/30/2013 _Final Report subcontract |
|
04/30/2013 |
04/30/2013 |