Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 58411: 2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
Project Number:
Title:
Pend Oreille River Basin Initiative: Land Acquisitions, Watershed Restoration, Conservation Hatchery
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
58411
Contract Title:
2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
Contract Continuation:
Previous: Next:
n/a
  • 62378: 2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
Contract Status:
Closed
Contract Description:
This project supports implementing larger-scale projects to improve local watershed health and ecosystem conditions and function within the Pend Oreille subbasin, consistent with the NPCC Sub-Basin Plan. The Kalispel Tribe has a history of matching & leveraging  funds from various sources (e.g. SRFB, DOE, DOT, BIA, USFS) to implement large scale watershed projects.  Land management and watershed restoration will be based upon the jointly-developed objectives and expected performance outcomes. There is an opportunity to begin implementation of this project in 2012 with a cost share on Cee Cee Ah Culvert with the US Forest Service.  A total of 3 culverts that are blockages to fish passage will be replaced.  Two of these culverts are in areas where brook trout were removed through another BPA funded project (Non-Native Fish Suppression Project). The design for these culvert replacements were funded through the Salmon Recovery Funding Board (SRFB).  

This project includes plans to design and implement a feasibility study for a westslope cutthroat and/or bull trout conservation aquaculture facility. The Tribe will obtain BPA concurrence about purpose and need, and project objectives to be served through conservation aquaculture – including agreement about appropriate cost-share (relative to the magnitude of the impacts attributable to the FCRPS and Albeni Falls Dam in particular) – before beginning the Northwest Power and Conservation Council’s Major Projects Review (3-STEP) process in about years 5 through 7.
  
• Target Habitats: Pend Oreille River and its tributaries both upstream and downstream of Albeni Falls Dam.

• Projected Benefits: Land acquisitions and conservations easements in core bull trout and westslope cutthroat watersheds.  Large scale tributary fish passage projects.  Improved ecosystem function through re-establishment of ecological conditions that foster abundance, diversity, and productivity of affected species.  A better understanding of westslope cutthroat and bull trout rebuilding needs and objectives; greater definition of the purposes to be served through conservation aquaculture; and the possible construction of a production facility commencing after the ten-year term of this agreement.  

• References: Intermountain Subbasin Plan (Pend Oreille Subbasin), Draft Bull Trout Recovery Plan (Chapter 23)
Account Type(s):
Expense
Contract Start Date:
08/15/2012
Contract End Date:
07/31/2013
Current Contract Value:
$119,784
Expenditures:
$119,784

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Matthew Berger Kalispel Tribe Yes Technical Contact mberger@knrd.org (509) 447-7244
Jason Connor Kalispel Tribe No Interested Party jconnor@knrd.org (509) 447-7285
Ray Entz Kalispel Tribe Yes Administrative Contact rentz@knrd.org (509) 445-1147
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Joe Maroney Kalispel Tribe Yes Supervisor jmaroney@knrd.org (509) 447-7272
Jason Olson Kalispel Tribe No Interested Party jolson@knrd.org (509) 447-7290
Donald Rose Bonneville Power Administration Yes Env. Compliance Lead dlrose@bpa.gov (503) 230-3796
Jolene Seymour Kalispel Tribe No Administrative Contact jseymour@kalispeltribe.com (509) 445-1147
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Obtain Required Permits B: 165. Obtain Required Permits 07/30/2013 07/30/2013
Fulfill all administrative tasks with quality products and in a timely manner. C: 119. Manage and fulfill all administrative tasks 07/30/2013 07/30/2013
Replace Cee Cee Ah Creek culvert site #1. D: 184. Replace Cee Cee Ah Creek Culvert Site #1 11/01/2012 11/01/2012
Replace Cee Cee Ah Culvert Site #2 E: 184. Replace Cee Cee Ah Creek Culvert Site #2 11/01/2012 11/01/2012
Replace Cee Cee Ah Culvert Site #3 F: 184. Replace Cee Cee Ah Creek Culvert Site #3 11/01/2012 11/01/2012
Attach Progress Report in Pisces G: 132. Submit Progress Report for the period Aug 1,2012 to July 31,2013 07/31/2013 07/31/2013
Project coordination among all stakeholders H: 189. Coordination with other entities on restoration efforts 07/30/2013 07/30/2013
Investigate needs for conservation hatchery I: 174. Investigate needs for conservation hatchery 07/30/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Westslope (O. c. lewisi)
  • 3 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 174 Produce Plan
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 05/01/2012
B 165 Obtain Required Permits 08/15/2012
C 119 Manage and fulfill all administrative tasks 08/15/2012
D 184 Replace Cee Cee Ah Creek Culvert Site #1 08/20/2012
E 184 Replace Cee Cee Ah Creek Culvert Site #2 08/20/2012
F 184 Replace Cee Cee Ah Creek Culvert Site #3 08/20/2012
G 132 Submit Progress Report for the period Aug 1,2012 to July 31,2013 08/15/2012
H 189 Coordination with other entities on restoration efforts 08/15/2012
I 174 Investigate needs for conservation hatchery 08/01/2012