Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 59850: 2008-903-00 EXP ESA HABITAT RESTORATION
Project Number:
Title:
ESA Habitat Restoration
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
59850
Contract Title:
2008-903-00 EXP ESA HABITAT RESTORATION
Contract Continuation:
Previous: Next:
55730: 2008-903-00 EXP ESA HABITAT RESTORATION
  • 63756: 2008-903-00 EXP ESA HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
The ESA Habitat Restoration Program in 2013 will be implementing on-the-ground habitat restoration projects in the Lemhi River, Panther Creek, and Upper Salmon River watersheds.  This year the ESA program will collaborate work and cost-share with various agencies, non-profit organization within the Salmon Subbasin; The Nature Conservancy (TNC), Sawtooth National Recreation Area (SNRA), Bureau of Reclamation (BOR), Pacific Coastal Salmon Recovery Funds (PCSRF), Trout Unlimited (TU), and private land owners.  Habitat projects to be implemented in 2013 are exclosure fence on Lee Creek, and Upper Salmon on Pole Creek, as well there will be continued work on Kenney Creek, and a stream reconnect on Lee Creek; both of the latter two are tributaries of the Lemhi River.  This year there is a culvert to bridge replacements on Pole Creek to improve fish passage and complement the project area and other habitat restoration actions.  In addition to those there will be a stream restoration project on Panther Creek by removing an abandoned diversion, remove berms, and leave a uniform channel to allow Panther Creek to flow back across and through the riparian area.
Account Type(s):
Expense
Contract Start Date:
01/01/2013
Contract End Date:
12/31/2013
Current Contract Value:
$340,803
Expenditures:
$340,803

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Supervisor ccolter@sbtribes.com (208) 239-4553
Joe Deherrera Bonneville Power Administration Yes COR jldeherrera@bpa.gov (503) 230-3442
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Jacee Furniss Shoshone-Bannock Tribes No Administrative Contact jfurniss@sbtribes.com (208) 239-4551
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Sammy Matsaw Shoshone-Bannock Tribes Yes Technical Contact smatsaw@sbtribes.com (208) 239-4550
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Shannell Ward Shoshone-Bannock Tribes No Contract Manager shannell.ward@sbtribes.com (208) 478-3821
Dawn Williams Shoshone-Bannock Tribes No Administrative Contact dwilliams@sbtribes.com (208) 478-3927


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Provide all Environmental Compliance documents to BPA A: 165. Environmental Compliance 12/31/2013 12/31/2013
Planning, Prioritize and Selecting habitat restoration projects B: 114. Prioritize & Select Habitat Projects 12/31/2013 12/31/2013
Conference attending, presenting and communicating fisheries science C: 99. Conference attendance and presentation 09/30/2013 04/01/2013
Lee Creek Historical Reconnect, Cottom Ranch Project D: 30. Lee Creek Historical Reconnect, Cottom Ranch Project 12/31/2013 12/31/2013
Lee Creek/Lemhi River Exclosure fence E: 40. Lee Creek/Lemhi River Exclosure Fence 12/31/2013 12/31/2013
Pole Creek I: Upper Salmon River Exclosure Fence F: 40. Pole Creek I: Upper Salmon River Exclosure Fence 11/02/2013 09/06/2013
Pole Creek II: Upper Salmon River Exclosure Fence G: 40. Pole Creek II: Upper Salmon River Exclosure Fence 12/31/2013
Pole Creek culvert to bridge H: 184. Pole Creek culvert to bridge 12/01/2013
Panther Creek Stream Restoration I: 29. Panther Creek Stream Restoration 12/01/2013
Fulfill all administrative tasks with quality products and in a timely manner. L: 119. Administer & Manage ESA Habitat 12/31/2013 12/31/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 3 instances of WE 40 Install Fence
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 3 instances of WE 40 Install Fence
  • 1 instance of WE 114 Identify and Select Projects
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 3 instances of WE 40 Install Fence
  • 1 instance of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 01/01/2013
B 114 Prioritize & Select Habitat Projects 01/01/2013
C 99 Conference attendance and presentation 01/01/2013
D 30 Lee Creek Historical Reconnect, Cottom Ranch Project 01/01/2013
E 40 Lee Creek/Lemhi River Exclosure Fence 01/01/2013
F 40 Pole Creek I: Upper Salmon River Exclosure Fence 01/01/2013
G 40 Pole Creek II: Upper Salmon River Exclosure Fence 01/01/2013
H 184 Pole Creek culvert to bridge 11/07/2013
I 29 Panther Creek Stream Restoration 11/07/2013
J 132 2013 annual report met in 2014 contract 01/01/2013
K 185 Periodic Status Reports for BPA 01/01/2013
L 119 Administer & Manage ESA Habitat 01/01/2013