Contract 60421: 1992-061-02 EXP ALBENI FALLS WL KALISPEL
Project Number:
Title:
Albeni Falls Wildlife Mitigation-Kalispel Tribe
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
60421
Contract Title:
1992-061-02 EXP ALBENI FALLS WL KALISPEL
Contract Continuation:
Previous: Next:
56262: 1992-061-02 EXP ALBENI FALLS WL KALISPEL
  • 64001: 1992-061-02 EXP ALBENI FALLS WL KALISPEL
Contract Status:
Closed
Contract Description:
Traditionally, the Kalispel Tribe relied on the Pend Oreille River Basin and its abundant aquatic and terrestrial resources for subsistence.   The productivity of the area has changed dramatically over the past sixty years due to the construction and inundation by Albeni Falls Dam.   Until the Pacific Northwest Electric Power Planning and Conservation Act (Power Act) of 1980 (Public law 96-501) directed that measures be implemented to protect, mitigate, and enhance fish and wildlife to the extent affected by development and operation of hydropower projects on the Columbia River System and that the Bonneville Power Administration provide the funding to offset identified impacts.  The construction of Albeni Falls Dam resulted in the loss of over 20,000 Habitat Units in wetland and riparian habitat types.  These losses occurred exclusively within the Kalispel Ceded Lands. Through the acquisition of property rights (fee title to management agreements), property protection, and habitat enhancement, the Kalispel Tribe is continuing mitigate for these losses.   This ongoing project (#1992-061-02) provides for the protection, enhancement, restoration, and operation & maintenance (O&M) of acquired lands to offset the negative impacts to wildlife species and habitats affected by the construction and operation of Albeni falls Dam.  Management activities include hydraulic restoration, wetland enhancement, shoreline protection, and vegetation restoration and enhancement.  Along with management activities, this contract will monitor past accomplishments to provide scientific support for the continuation of these types of enhancement/restoration activities as applied to additional properties as they become part of this project.  This contract will also cover the O&M of existing habitat value and previously installed structures.
Account Type(s):
Expense
Contract Start Date:
03/01/2013
Contract End Date:
02/28/2014
Current Contract Value:
$859,458
Expenditures:
$859,458

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Matthew Berger Kalispel Tribe Yes Contract Manager mberger@knrd.org (509) 447-7244
Rossana Callejas Bonneville Power Administration Yes Interested Party rxcallejas@bpa.gov (503) 230-7558
Hannah Dondy-Kaplan Bonneville Power Administration Yes COR hadondy-kaplan@bpa.gov (503) 230-4071
Ray Entz Kalispel Tribe Yes Supervisor rentz@knrd.org (509) 445-1147
Bart George Kalispel Tribe Yes Technical Contact bgeorge@kalispeltribe.com (509) 671-6149
Katey Grange Bonneville Power Administration No Interested Party kcgrange@bpa.gov (503) 230-4047
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Ryan McNee Kalispel Tribe Yes Technical Contact rmcnee@kalispeltribe.com (509) 447-7423
Jenna Peterson Bonneville Power Administration Yes Env. Compliance Lead jepeterson@bpa.gov (503) 230-3018
Jolene Seymour Kalispel Tribe Yes Administrative Contact jseymour@kalispeltribe.com (509) 445-1147
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Completed documentation of environmental compliance to BPA B: 165. Complete Permit Applications and Provide Documentation to Obtain Compliance. 05/31/2013 05/31/2013
Completed hazardous waste surveys C: 172. Complete hazardous waste assessments as a part of the pre-acquisition process. 02/28/2014 02/13/2014
Completed cultural resource surveys D: 172. Complete cultural resource surveys. 02/28/2014 02/18/2014
Completed Acquisition and Easement Agreements E: 172. Land Owner Coordination 02/28/2014 02/18/2014
Completed Designs for Construction/Implementation F: 122. Review Designs and Details for Habitat Enhancements. 06/24/2013 06/30/2013
Completed Operations, Maintenance and Enhancement plan for Indian Creek acquired land acquisitions. G: 174. Complete Management Plan for Indian Creek 12/30/2013
Create Wetland Ponds and plug drainage ditches. H: 181. Create Wetland Ponds on Washington Management Area 12/09/2013 12/09/2013
Restore Wetland on Carey Creek Unit, Idaho. I: 181. Restore floodplain on Carey Creek Unit, Idaho 01/02/2014 02/12/2014
Bank stabilization through LWD placement J: 29. Add LWD to Shoreline Stabilization sites on Washington Management areas 02/28/2014 02/13/2014
Pend Oreille River Shoreline Stabilization Areas Seeded K: 47. Seed Shoreline Stabilization Site 12/09/2013 12/09/2013
Wetland Ponds and shorelines seeded and mulched L: 47. Seed Newly Created Wetland Pond Shorelines 01/02/2014 01/02/2014
Planted Riparian Areas on Enhancement Sites M: 47. Plant Native Trees and Shrubs on the Washington Management Areas 12/02/2013 12/02/2013
Properties Secured From Trespass N: 26. Secure Properties and Provide Enforcement Management. 02/28/2014 02/13/2014
Maintain access to water control structures. O: 38. Maintain access to water control structures. 01/27/2014 01/27/2014
Fence Maintained P: 186. Maintain Fence 02/28/2014 02/13/2014
Fence maintained Q: 186. Maintain Fence 02/28/2014 02/13/2014
Water Control Structures Maintained and Functioning R: 186. Maintain Existing Water Control Structures on Wetland Enhancement Sites. 02/24/2014 02/13/2014
Buildings Maintained S: 186. Manage and Maintain Facility to Maximal Standards 02/28/2014 02/13/2014
Shoreline Stabilization T: 186. Maintain Integrity of Shoreline Stabilization Structures 02/03/2014 02/18/2014
Maintain Vegetation along new channel at Big Meadows unit Idaho. U: 186. Maintain Vegetation along new channel at Big Meadows 11/25/2013 11/25/2013
Assessment of Forested stands on Idaho properties. V: 186. Assess and Maintain Forest stands on Idaho properties for wildlife 02/24/2014 02/18/2014
Completion of Required Project Reporting to BPA W: 119. Oversight of New Projects, Implementation, Construction, O&M, RM&E w/ participating agencies 02/28/2014 02/18/2014
Completed FY13 Annual Report to BPA X: 132. Annual Report for 2013 Contract Cycle 02/28/2014 02/18/2014
Conduct Pre-Acquisition Work Y: 172. Conduct Pre-acquisition work 02/24/2014 02/13/2014
Vegetation Removal Z: 197. Vegetation Removal (Noxious Weed Control) 02/28/2014 02/13/2014
Maintain Established Vegetation assess area for Noxious weed infestations. AA: 197. Maintain/Remove Vegetation (Noxious Weed inventory) 02/24/2014 02/13/2014
Maintain Established Vegetation AB: 197. Maintain Previously Planted Materials within the Idaho Management Areas 02/24/2014 02/13/2014
Completed Spring and Fall Burns AC: 197. Conduct Spring and Fall Controlled Burns 02/24/2014 02/13/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 4 instances of WE 197 Maintain/Remove Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 7 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 3 instances of WE 47 Plant Vegetation
  • 2 instances of WE 181 Create, Restore, and/or Enhance Wetland
  • 4 instances of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 03/01/2013
B 165 Complete Permit Applications and Provide Documentation to Obtain Compliance. 03/01/2013
C 172 Complete hazardous waste assessments as a part of the pre-acquisition process. 03/01/2013
D 172 Complete cultural resource surveys. 03/01/2013
E 172 Land Owner Coordination 03/01/2013
F 122 Review Designs and Details for Habitat Enhancements. 03/01/2013
G 174 Complete Management Plan for Indian Creek 03/01/2013
H 181 Create Wetland Ponds on Washington Management Area 03/01/2013
I 181 Restore floodplain on Carey Creek Unit, Idaho 03/01/2013
J 29 Add LWD to Shoreline Stabilization sites on Washington Management areas 03/01/2013
K 47 Seed Shoreline Stabilization Site 03/01/2013
L 47 Seed Newly Created Wetland Pond Shorelines 03/01/2013
M 47 Plant Native Trees and Shrubs on the Washington Management Areas 03/01/2013
N 26 Secure Properties and Provide Enforcement Management. 03/01/2013
O 38 Maintain access to water control structures. 03/01/2013
P 186 Maintain Fence 03/01/2013
Q 186 Maintain Fence 03/01/2013
R 186 Maintain Existing Water Control Structures on Wetland Enhancement Sites. 03/01/2013
S 186 Manage and Maintain Facility to Maximal Standards 03/01/2013
T 186 Maintain Integrity of Shoreline Stabilization Structures 03/01/2013
U 186 Maintain Vegetation along new channel at Big Meadows 03/01/2013
V 186 Assess and Maintain Forest stands on Idaho properties for wildlife 03/01/2013
W 119 Oversight of New Projects, Implementation, Construction, O&M, RM&E w/ participating agencies 03/01/2013
X 132 Annual Report for 2013 Contract Cycle 03/01/2013
Y 172 Conduct Pre-acquisition work 03/01/2013
Z 197 Vegetation Removal (Noxious Weed Control)
AA 197 Maintain/Remove Vegetation (Noxious Weed inventory) 03/01/2013
AB 197 Maintain Previously Planted Materials within the Idaho Management Areas 03/01/2013
AC 197 Conduct Spring and Fall Controlled Burns