Contract 61475: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 13
Project Number:
Title:
CTUIR Grand Ronde Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
61475
Contract Title:
1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 13
Contract Continuation:
Previous: Next:
57028: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 12
  • 65847: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 14
Contract Status:
Closed
Contract Description:
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Grande Ronde Subbasin Restoration Project (199608300) was initiated in 1996 to develop and implement a fish habitat program that contributes to the mitigation of Snake River Basin salmon and steelhead losses associated with the Federal Columbia River Hydropower System (FCRPS) and recovery of ESA anadromous fish.  The project works collaboratively with multiple agencies, organizations, and private landowners to identify, prioritize, plan, design, implement, maintain, and monitor tributary fish habitat restoration and enhancement projects.  The Project  embraces the goals of the CTUIR established in its’ Columbia Basin Salmon Policy (CTUIR, 1995) River Vision (Jones, et. al., 2008), Wykan-Ush-Me Wa Kush, Spirit of the Salmon (CRITFC, 1995), and is tiered to the Northwest Power Planning Council Fish and Wildlife Program as amended(NPPC, 2009), Grande Ronde Subbasin Plan (NPPC, 2004), Draft Recovery Plan For Oregon Spring/Summer Chinook Salmon And Steelhead Populations In The Snake River Chinook Salmon Evolutionary Significant Unit And Snake River Steelhead Distinct Population Segment (NMFS, 2010), and the Federal Columbia River Power System Biological Opinion (FCRPS BiOP), (NMFS, 2008).  The CTUIR propose ongoing fish habitat protection, enhancement, maintenance, and monitoring under the Project to achieve the primary goal of protecting habitat and restoring/enhancing degraded habitats to support the recovery of focal species. Project staff participates in BiOp remand efforts in the Basin, including the BiOp expert panel, recovery planning, and technical review and planning team.  Work under the project is directly linked to the CTUIR-BPA Accord.

In FY 2013, the project will be focused on initiating implementation on the Rock Creek and Catherine Creek (RM44) Projects, Rock Creek is a tributary to the Grande Ronde River near Hilgard State Park and the confluence of 5-Point Creek.  This project area encompasses over 15.8 miles of fish bearing streams, supporting all life stages for summer steelhead and rearing habitat for juvenile spring Chinook salmon which CTUIR secured a 15 year term conservation easement to during FY2011.Planned habitat enhancement includes stream channel and meander construction, large wood additions to enhance habitat complexity, floodplain road obliteration, culvert replacements, riparian exclosure fence construction, and riparian planting.  This large scale project will be implemented in phases beginning in summer 2013 and continuing through 2014.  Additionally, the CTUIR and project partners (UCSWCD, BOR, and ODFW) plan to initiate small scale phase 1 construction effort on the Catherine Creek (RM 44) project involving during summer 2013.  Planned work includes installation of large wood complexes at strategic sites to stabilize actively eroding streambanks as part of a larger scale habitat restoration effort that is currently undergoing a rigorous planning and design effort along 4 plus miles of mainstem Catherine Creek.

Land acquisition planning will continue during FY2013 with the expectation that the CTUIR and BPA will initiate and possibly complete acquisition of several parcels and/or easements during the contract period.  CTUIR fish habitat project staff have identified five primary parcels which are currently under evaluation.  

Project staff will continue to coordinate with project partners in the development and prioritization of BiOp and Accord fish habitat projects and develop future project opportunities.  

A base budget of $629,550 is planned to perform watershed restoration-related tasks associated with several project areas.  An additional $84,287 has been added to the base budget from CTUIR-BPA Accord Passage Funds and prior year un-used Accord project funds. Additional funds are anticipated to be added to the base budget during the contract period  to facilitate phase 1 construction on the Rock Creek project as environmental compliance is completed and subcontracting processes are finalized.
Account Type(s):
Expense
Contract Start Date:
05/01/2013
Contract End Date:
04/30/2014
Current Contract Value:
$736,546
Expenditures:
$736,546

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Receipt of environmental compliance clearance from BPA. A: 165. Complete and/or initiate Environmental Permitting for Project Activities 04/30/2014 04/30/2014
Receipt of environmental compliance clearance from BPA. B: 165. Rock Creek Fish Habitat Enhancement Project (Graves Creek) EC requirements 04/30/2014 04/30/2014
Successful Project Administration C: 119. Phase 1 Rock Creek (Graves) Project Administration 04/30/2014 04/30/2014
Replace undersized culvert on Chicken Creek D: 184. Provide Cost-Share Funding to USFS Wallowa Whitman NF for Chicken Creek Culvert Replacement 07/31/2013 07/31/2013
Re-activate historic stream channel E: 30. Re-activate Graves Creek Historic Channel Segment 04/30/2014
Install large wood to increase habitat complexity F: 29. Install Large Wood and Riffle Complexes along Graves Creek 11/01/2013 11/01/2013
Conduct project maintenance on McCoy, Dark Canyon, Meadow, Willow Catherine & Wallowa Projects G: 186. Maintain instream structures, fences, and off-channel water developments 04/30/2014 04/30/2014
Maintain vegetation and control noxious weeds H: 197. Maintain vegetation and control noxious weeds 04/30/2014 04/30/2014
Successfully Administer project I: 119. Manage and Administer CTUIR GR Subbasin Restoration Project 04/30/2014 04/30/2014
BiOp Fish Habitat Project Opportunity Development and Review J: 114. Solicit, review and select BiOp expense & capital projects 04/30/2014 04/30/2014
Complete outreach & education activities K: 99. Public Outreach and Education 04/30/2014 04/30/2014
Conduct ongoing project development and coordination activities L: 114. CTUIR Grande Ronde Subbasin Restoration Coordination 04/30/2014 04/30/2014
Develop project design plan sets. M: 174. Develop project designs and produce plans 04/30/2014 04/30/2014
Collect Project Monitoring Data N: 157. Monitoring & Evaluation CTUIR GR Subbasin Restoration Project 04/30/2014 04/30/2014
Complete data analysis and interpretation O: 162. Analyze and Interpret M&E Data 04/30/2014 04/30/2014
Upload 2013 Annual Report P: 132. Prepare FY2013 Annual Report - May 2013 - April 2014 04/30/2014 04/30/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete and/or initiate Environmental Permitting for Project Activities 05/01/2013
B 165 Rock Creek Fish Habitat Enhancement Project (Graves Creek) EC requirements 05/01/2013
C 119 Phase 1 Rock Creek (Graves) Project Administration 05/01/2013
D 184 Provide Cost-Share Funding to USFS Wallowa Whitman NF for Chicken Creek Culvert Replacement 05/01/2013
E 30 Re-activate Graves Creek Historic Channel Segment 07/30/2014
F 29 Install Large Wood and Riffle Complexes along Graves Creek 07/31/2014
G 186 Maintain instream structures, fences, and off-channel water developments 05/01/2013
H 197 Maintain vegetation and control noxious weeds 05/01/2013
I 119 Manage and Administer CTUIR GR Subbasin Restoration Project 05/01/2013
J 114 Solicit, review and select BiOp expense & capital projects 05/01/2013
K 99 Public Outreach and Education 05/01/2013
L 114 CTUIR Grande Ronde Subbasin Restoration Coordination 05/01/2013
M 174 Develop project designs and produce plans 05/01/2013
N 157 Monitoring & Evaluation CTUIR GR Subbasin Restoration Project 05/01/2013
O 162 Analyze and Interpret M&E Data 05/01/2013
P 132 Prepare FY2013 Annual Report - May 2013 - April 2014 05/01/2013
Q 185 Periodic Status Reports for BPA 05/01/2013