Contract 65847: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 14
Project Number:
Title:
CTUIR Grand Ronde Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
65847
Contract Title:
1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 14
Contract Continuation:
Previous: Next:
61475: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 13
  • 69118: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 15
Contract Status:
Closed
Contract Description:
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Grande Ronde Subbasin Restoration Project (199608300) was initiated in 1996 to develop and implement a fish habitat program that contributes to the mitigation of Snake River Basin salmon and steelhead losses associated with the Federal Columbia River Hydropower System (FCRPS) and recovery of ESA anadromous fish.  The project works collaboratively with multiple agencies, organizations, and private landowners to identify, prioritize, plan, design, implement, maintain, and monitor tributary fish habitat restoration and enhancement projects.  The Project  embraces the goals of the CTUIR established in its’ Columbia Basin Salmon Policy (CTUIR, 1995) River Vision (Jones, et. al., 2008), Wykan-Ush-Me Wa Kush, Spirit of the Salmon (CRITFC, 1995), and is tiered to the Northwest Power Planning Council Fish and Wildlife Program as amended(NPPC, 2009), Grande Ronde Subbasin Plan (NPPC, 2004), Draft Recovery Plan For Oregon Spring/Summer Chinook Salmon And Steelhead Populations In The Snake River Chinook Salmon Evolutionary Significant Unit And Snake River Steelhead Distinct Population Segment (NMFS, 2010), and the Federal Columbia River Power System Biological Opinion (FCRPS BiOP), (NMFS, 2008).  The CTUIR propose ongoing fish habitat protection, enhancement, maintenance, and monitoring under the Project to achieve the primary goal of protecting habitat and restoring/enhancing degraded habitats to support the recovery of focal species. Project staff participates in BiOp remand efforts in the Basin, including the BiOp expert panel, recovery planning, and technical review and planning team.  Work under the project is directly linked to the CTUIR-BPA Accord.

In FY 2014, the project will be focused on constructing phase 2 of the Rock Creek, Graves Creek, and Catherine Creek (RM44) projects. Rock Creek is a tributary to the Grande Ronde River near Hilgard State Park and the confluence of 5-Point Creek.  This project area encompasses over 15.8 miles of fish bearing streams, supporting all life stages for summer steelhead and rearing habitat for juvenile spring Chinook salmon which CTUIR secured a 15 year term conservation easement to during FY2011.Planned habitat enhancement includes large wood and habitat boulder additions to enhance habitat complexity, floodplain levee removal, riparian exclosure fence construction, and riparian planting.  This large scale project will be implemented in phases beginning in summer 2014.  Phase 3 along lower Rock Creek is planned for FY2015.  Additionally, the CTUIR and project partners (UCSWCD, BOR, and ODFW) plan to initiate Phase 2 along the CC44 project complex.  Work during FY2014 includes large wood additions, development of side channels and alcoves, riparian planting and fencing, consolidation of irrigation diversions and installation of irrigation delivery pipe to improve water conservation.  Phase 2 of the project is funded by GRMW-BPA, CTUIR-BPA Accord, NRCS EQUIP.  Additional funding sources are currently being pursued by project partners.

Land acquisition planning will continue during FY2014 with the expectation that the CTUIR and BPA will complete fee title acquisition on a Catherine Creek property and a a permanent easement on Dark Canyon.  CTUIR fish habitat project staff have identified five primary parcels which are currently under evaluation.  

Project staff will continue to coordinate with project partners in the development and prioritization of BiOp and Accord fish habitat projects and develop future project opportunities.  

A base budget of $1,462,335 is planned to perform watershed restoration-related tasks associated with several project areas.  An additional $348,151 has been added to the base budget from CTUIR-BPA Accord Passage Funds and prior year un-used Accord project funds. Additional funds are anticipated to be added to the base budget during the contract period  to facilitate phase 1 construction on the Rock Creek project as environmental compliance is completed and subcontracting processes are finalized.
Account Type(s):
Expense
Contract Start Date:
05/01/2014
Contract End Date:
04/30/2015
Current Contract Value:
$1,364,608
Expenditures:
$1,364,608

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Receipt of environmental compliance clearance from BPA. A: 165. Complete and/or initiate Environmental Permitting for Project Activities 04/30/2015 04/30/2015
Receipt of environmental compliance clearance from BPA. B: 165. Rock Creek Fish Habitat Enhancement Project EC requirements 04/30/2015 04/30/2015
All administrative tasks fulfilled with timely quality products C: 119. Phase 2 Rock Creek Project Administration 11/14/2014 11/14/2014
Install large wood complexes and habitat boulders to increase habitat complexity and diversity D: 29. Install Large Wood Complexes and habitat boulders along Rock Creek, Little Rock, and Sheep Creek 04/30/2015 04/30/2015
Remove Floodplain Levee E: 180. Remove Floodplain Levees on Rock Creek 04/30/2015 04/30/2015
Re-activate historic stream channel F: 30. Re-activate Graves Creek and Rock Creek Historic Channel Segments 04/30/2015 04/30/2015
Construct Riparian Conservation Easement Fences G: 40. Install Rock Creek Riparian Easement Fences 04/30/2015 04/30/2015
Construct Riparian Conservation Easement Fences H: 40. Install Catherine Creek (CC44) Riparian Easement Fences 04/30/2015 04/30/2015
Plant native trees, shrubs, and grass on Rock Creek Project I: 47. Plant native trees, shrubs, and grasses along Rock, Sheep, and Little Rock Creeks 04/30/2015 04/30/2015
Plant native trees, shrubs, and grass J: 47. Plant native trees, shrubs, and grasses along Catherine Creek 11/28/2014 12/19/2014
Install Sprinklers to Improve Irrigation Effie K: 150. Cost-Share Catherine Creek (CC44) Irrigation Efficiency Plan Install Sprinklers 04/30/2015 04/30/2015
Conduct Fish Salvage Operations L: 28. Conduct Fish Salvage operations on the Phase 2 CC44 and Rock Creek Projects 10/15/2014 08/28/2014
Replace undersized culvert on Ladd Creek and Highway 203 M: 184. Ladd Creek Highway 203 Culvert Replacement 10/15/2014 10/15/2014
Conduct project maintenance on McCoy, Dark Canyon, Meadow, Willow, Rock, Catherine & Wallowa Project N: 186. Maintain instream structures, fences, and off-channel water developments 04/30/2015 04/30/2015
Assist the Oregon Ag Foundation with planting & fence construction subcontract administration O: 119. Assist with managing & admin CREP fencing & planting plans on Willow Creek Project 04/30/2015 04/30/2015
Maintain vegetation and control Weeds on the Willow Creek Fish Habitat Enhancement Project P: 198. Maintain Vegetation and Control Weeds on the Willow Creek Project 04/30/2015 04/30/2015
Successfully Administer project Q: 119. Manage and Administer CTUIR GR Subbasin Restoration Project 04/30/2015 04/30/2015
Complete outreach & education activities R: 99. Public Outreach and Education 04/30/2015 04/30/2015
Conduct ongoing project development and coordination activities S: 114. CTUIR Grande Ronde Subbasin Restoration Coordination 04/30/2015 04/30/2015
BiOp Fish Habitat Project Opportunity Development and Review T: 114. Solicit, review and select BiOp expense & capital projects 04/30/2015 04/30/2015
Develop project design plan sets. U: 174. Develop project designs and produce plans 04/30/2015 04/30/2015
Upload 2014 Annual Report V: 132. Prepare FY2014 Annual Report - May 2014 - April 2015 04/30/2015 04/30/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 150 Install Sprinkler
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 28 Trap and Haul
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 28 Trap and Haul
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 40 Install Fence
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 150 Install Sprinkler
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 47 Plant Vegetation
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete and/or initiate Environmental Permitting for Project Activities 05/01/2014
B 165 Rock Creek Fish Habitat Enhancement Project EC requirements 05/01/2014
C 119 Phase 2 Rock Creek Project Administration 05/01/2014
D 29 Install Large Wood Complexes and habitat boulders along Rock Creek, Little Rock, and Sheep Creek 07/30/2014
E 180 Remove Floodplain Levees on Rock Creek 07/30/2014
F 30 Re-activate Graves Creek and Rock Creek Historic Channel Segments 07/30/2014
G 40 Install Rock Creek Riparian Easement Fences 10/14/2014
H 40 Install Catherine Creek (CC44) Riparian Easement Fences 10/14/2014
I 47 Plant native trees, shrubs, and grasses along Rock, Sheep, and Little Rock Creeks 07/30/2014
J 47 Plant native trees, shrubs, and grasses along Catherine Creek 05/29/2014
K 150 Cost-Share Catherine Creek (CC44) Irrigation Efficiency Plan Install Sprinklers 10/14/2014
L 28 Conduct Fish Salvage operations on the Phase 2 CC44 and Rock Creek Projects 05/29/2014
M 184 Ladd Creek Highway 203 Culvert Replacement 02/19/2014
N 186 Maintain instream structures, fences, and off-channel water developments 02/20/2014
O 119 Assist with managing & admin CREP fencing & planting plans on Willow Creek Project 05/01/2014
P 198 Maintain Vegetation and Control Weeds on the Willow Creek Project 10/14/2014
Q 119 Manage and Administer CTUIR GR Subbasin Restoration Project 05/01/2014
R 99 Public Outreach and Education 05/01/2014
S 114 CTUIR Grande Ronde Subbasin Restoration Coordination 05/01/2014
T 114 Solicit, review and select BiOp expense & capital projects 05/01/2014
U 174 Develop project designs and produce plans 02/19/2014
V 132 Prepare FY2014 Annual Report - May 2014 - April 2015 05/01/2014
W 185 Periodic Status Reports for BPA 05/01/2014