Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 69118: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 15
Project Number:
Title:
CTUIR Grand Ronde Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
69118
Contract Title:
1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 15
Contract Continuation:
Previous: Next:
65847: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 14
  • 72551: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 16
Contract Status:
Closed
Contract Description:
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Grande Ronde Subbasin Restoration Project (199608300) was initiated in 1996 to develop and implement a fish habitat program that contributes to the mitigation of Snake River Basin salmon and steelhead losses associated with the Federal Columbia River Hydropower System (FCRPS) and recovery of ESA anadromous fish.  The project works collaboratively with multiple agencies, organizations, and private landowners to identify, prioritize, plan, design, implement, maintain, and monitor tributary fish habitat restoration and enhancement projects.  The Project  embraces the goals of the CTUIR established in its’ Columbia Basin Salmon Policy (CTUIR, 1995) River Vision (Jones, et. al., 2008), Wykan-Ush-Me Wa Kush, Spirit of the Salmon (CRITFC, 1995), and is tiered to the Northwest Power Planning Council Fish and Wildlife Program as amended(NPPC, 2009), Grande Ronde Subbasin Plan (NPPC, 2004), Draft Recovery Plan For Oregon Spring/Summer Chinook Salmon And Steelhead Populations In The Snake River Chinook Salmon Evolutionary Significant Unit And Snake River Steelhead Distinct Population Segment (NMFS, 2010), and the Federal Columbia River Power System Biological Opinion (FCRPS BiOP), (NMFS, 2008).  The CTUIR propose ongoing fish habitat protection, enhancement, maintenance, and monitoring under the Project to achieve the primary goal of protecting habitat and restoring/enhancing degraded habitats to support the recovery of focal species. Project staff participates in BiOp remand efforts in the Basin, including the BiOp expert panel, recovery planning, and technical review and planning team.  Work under the project is directly linked to the CTUIR-BPA Accord.

In FY 2015 the project will be focused on planning, design, and implementation of fish habitat enhancement projects along Catherine Creek and Upper Grande Ronde and tributaries.  Project implementation for summer and fall/winter 2015 include: 1) Catherine Creek, CC44 Phase 3 project implementation; and 2) Rock Creek phase 3 implementation.  Fish passage project planning and design includes multiple individual projects, several of which will be designed and implemented in partnership with USFS and BOR including CC44 culvert, Graves Creek culvert replacement, USFS Wallowa-Whitman culvert projects along Limber Jim Creek (2), Sheep Creek, and Muir Creek, and USFS Umatilla NF culvert removal and road decommissioning on Phillips Creek.

Project planning and design includes: 1) Catherine Creek CC42; 2) Birdtrack Springs, Grande Ronde River, and 3) Starkey Meadows, Grande Ronde River.

Project staff will continue to work on developing new project opportunities in Catherine Creek, Grande Ronde River, and tributaries.

Land acquisition planning will continue during FY2015 with the expectation that the CTUIR and BPA will complete fee title acquisition on a Catherine Creek property, Lookingglass, and a  permanent easement on Dark Canyon and Meadow creeks.  Additional acquisition opportunities will continue under development.

Project staff will continue to coordinate with project partners in the development and prioritization of BiOp and Accord fish habitat projects and develop future project opportunities.  

A base budget of $1,608,828 is planned to perform watershed restoration-related tasks associated with several project areas. An additional $xxxx of Accord passage funding has been added to the base budget for planned fish passage projects.
Account Type(s):
Expense
Contract Start Date:
05/01/2015
Contract End Date:
04/30/2016
Current Contract Value:
$648,506
Expenditures:
$648,506

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Receipt of environmental compliance clearance from BPA. A: 165. Complete and/or initiate Environmental Permitting for Project Activities 04/30/2016 04/30/2016
Receipt of environmental compliance clearance from BPA. B: 165. Rock Creek Fish Habitat Enhancement Project EC requirements 04/30/2016 04/30/2016
All administrative tasks fulfilled with timely quality products C: 119. Phase 3 Rock Creek Project Administration 04/30/2016
Install large wood complexes and habitat boulders to increase habitat complexity and diversity D: 29. Install Large Wood Complexes and habitat boulders along Rock Creek 04/30/2016
Construct meandering stream channel E: 30. Construct Rock Creek Restoration Channel 04/30/2016
Remove draw bottom road F: 33. Obliterate draw bottom road along Rock Creek 04/30/2016
All administrative tasks fulfilled with timely quality products G: 119. Assist with managing & admin CREP fencing & planting plans on Rock Creek Project 04/30/2016 03/30/2016
All administrative tasks fulfilled with timely quality products I: 119. Southern Cross Conservation Property Fish Habitat Enhancement Project Administration 04/30/2016 04/30/2016
All administrative tasks fulfilled with timely quality products J: 119. Assist with managing & admin CREP fencing & planting plans on Willow Creek Project 04/30/2016 04/30/2016
Construct Riparian Conservation Easement Fences K: 40. Install Riparian Fences on Cunha Easement along Dark Canyon and Meadow Creeks 04/30/2016
Construct Riparian and Property Fences L: 40. Install Fences on the Southern Cross Conservation Property 04/30/2016
Plant native trees, shrubs, and grass on the CC43 Southern Cross Project M: 47. Plant native trees, shrubs, and grasses along CC44 Project Areas 04/30/2016 04/30/2016
Conduct Fish Salvage Operations N: 28. Conduct Fish Salvage operations on the CC44 Project 04/30/2016 08/14/2015
Replace undersized culvert on Sheep Creek O: 184. Conduct site survey, prepare design and install culvert on Sheep Creek 04/30/2016
Survey & Design for Limber Creek culverts P: 175. Conduct site survey & prepare culvert designs Limber Jim Creek/North Fork Limber Ck 04/30/2016
Remove culvert on Little Philips Creek Q: 184. Remove culvert on Little Phillips Creek and rehabilitate stream 04/30/2016 04/30/2016
Replace undersized culvert on Graves Creek R: 184. Conduct site survey, prepare design and install culvert on Graves Creek 04/30/2016
Replace undersized culvert on side channel Southern Cross Conservation Property S: 184. Install Culvert on the Southern Cross Conservation Property side channel 04/30/2016
Conduct maintenance on McCoy, Dark Canyon, Meadow, Willow, Rock, Catherine & Wallowa Projects T: 186. Maintain instream structures, fences, and off-channel water developments 04/30/2016 04/30/2016
Maintain vegetation and control weeds on the Willow Creek, CC37, and Southern Cross projects U: 198. Maintain Vegetation and Control Weeds on the Willow Creek, CC37, and Southern Cross Projects 04/30/2016 04/30/2016
Successfully Administer project V: 119. Manage and Administer CTUIR GR Subbasin Restoration Project 04/30/2016 04/30/2014
Complete outreach & education activities W: 99. Public Outreach and Education 04/30/2016 04/30/2016
Conduct ongoing project development and coordination activities X: 114. CTUIR Grande Ronde Subbasin Restoration Coordination 04/30/2016 04/30/2016
BiOp Fish Habitat Project Opportunity Development and Review Y: 114. Solicit, review and select BiOp expense & capital projects 04/30/2016 04/30/2013
Develop project design plan sets. Z: 174. Develop project designs and produce plans 04/30/2016 04/30/2016
Upload 2015 Annual Report AA: 132. FY2015 Annual Report - May 2015 - April 2016 04/30/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 2 instances of WE 184 Install Fish Passage Structure
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 175 Produce Design
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 28 Trap and Haul
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 28 Trap and Haul
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 4 instances of WE 184 Install Fish Passage Structure
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete and/or initiate Environmental Permitting for Project Activities 05/01/2015
B 165 Rock Creek Fish Habitat Enhancement Project EC requirements 05/01/2015
C 119 Phase 3 Rock Creek Project Administration 05/01/2015
D 29 Install Large Wood Complexes and habitat boulders along Rock Creek
E 30 Construct Rock Creek Restoration Channel
F 33 Obliterate draw bottom road along Rock Creek
G 119 Assist with managing & admin CREP fencing & planting plans on Rock Creek Project 05/01/2015
H 180 Install Floodplain roughness structure on Bird Track Springs Project
I 119 Southern Cross Conservation Property Fish Habitat Enhancement Project Administration 05/01/2015
J 119 Assist with managing & admin CREP fencing & planting plans on Willow Creek Project 05/01/2015
K 40 Install Riparian Fences on Cunha Easement along Dark Canyon and Meadow Creeks
L 40 Install Fences on the Southern Cross Conservation Property 05/01/2015
M 47 Plant native trees, shrubs, and grasses along CC44 Project Areas 05/01/2015
N 28 Conduct Fish Salvage operations on the CC44 Project 05/01/2015
O 184 Conduct site survey, prepare design and install culvert on Sheep Creek
P 175 Conduct site survey & prepare culvert designs Limber Jim Creek/North Fork Limber Ck 03/18/2015
Q 184 Remove culvert on Little Phillips Creek and rehabilitate stream 12/16/2015
R 184 Conduct site survey, prepare design and install culvert on Graves Creek
S 184 Install Culvert on the Southern Cross Conservation Property side channel 05/01/2015
T 186 Maintain instream structures, fences, and off-channel water developments 05/01/2015
U 198 Maintain Vegetation and Control Weeds on the Willow Creek, CC37, and Southern Cross Projects 12/16/2015
V 119 Manage and Administer CTUIR GR Subbasin Restoration Project 05/01/2015
W 99 Public Outreach and Education 05/01/2015
X 114 CTUIR Grande Ronde Subbasin Restoration Coordination 05/01/2015
Y 114 Solicit, review and select BiOp expense & capital projects 05/01/2015
Z 174 Develop project designs and produce plans 05/01/2015
AA 132 FY2015 Annual Report - May 2015 - April 2016 05/01/2015
AB 185 Quarterly Status Reports 05/01/2015