Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 62737: 1993-056-00 EXP USFWS - NOAA RESEARCH TO ADVANCE HATCHERY REFORM
Project Number:
Title:
Advance Hatchery Reform Research
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
62737
Contract Title:
1993-056-00 EXP USFWS - NOAA RESEARCH TO ADVANCE HATCHERY REFORM
Contract Continuation:
Previous: Next:
58972: 1993-056-00 EXP USFWS (NOAA) RESEARCH TO ADVANCE HATCHERY REFORM
  • 66666: 1993-056-00 EXP DEMONSTRATION OF CAPTIVE BROODSTOCK TECHNOLOGY
Contract Status:
Complete
Contract Description:
Reasonable and Prudent Alternative (RPA) 63.2 of the FCRPS Biological Opinion calls for determining the effects of implemented hatchery reforms on salmon and steelhead populations.  There is currently a specified gap in coverage for Upper Columbia River steelhead (RM&E workgroup June 2009 pre decisional draft document and subsequent work groups).  This proposal provides for implementation and evaluation of major hatchery reforms identified by the RM&E workgroup for the US Fish and Wildlife Service’ s Winthrop National Fish Hatchery (WNFH). The required transition to local broodstock requires hatchery reform actions that i) can accommodate a later return and spawn timing, ii) induce proper smoltification, iii) promote high survival, and iv) maintain natural levels of fitness in the hatchery stock.  Simply, transition to local broodstock cannot be successful without effective implementation of the hatchery reforms described in this proposal, which is part and parcel to the HGMP being developed by the USFWS for WNFH.

Steelhead in Pacific Northwest hatcheries are typically reared for release as 1-year-old smolts, rather than the 2- and 3-year-old smolt life history patterns found in nature.  High growth rates associated with accelerated hatchery rearing to a 1-year-old smolt life history may contribute to maladaptive behavioral traits and reduced post-release survival, and may constitute a primary mechanism leading to reduced fitness in hatchery fish.  The current proposal offers a unique opportunity to evaluate genetic, physiological, and life history impacts of rearing 1- vs 2-year-old steelhead smolts.  The study is cost effective in that it will be conducted using groups of integrated steelhead already being reared in Washington tributaries of the upper Columbia River as part of ESA recovery efforts.  The study will aim to provide husbandry solutions that will help increase fitness, and alleviate maladaptive traits of hatchery-reared steelhead.  The design fills identified gaps the FCRPS BiOp Reasonable and Prudent Alternatives 39, 63.2, 64.2.  It will develop hatchery reform actions and best management practices for artificial production programs to make a net positive contribution to recovery of listed populations.

Nearly all steelhead intervention programs within the Basin will require non-conventional rearing methods in order to minimize the fitness loss described by Araki et al. (2008 and 2009) while achieving high smoltification and survival rates.  The methods developed and tested under this proposal will be transferable in real time to other intervention programs wrestling with the same issues (e.g., Touchet, Tucannon, East Fork Salmon River).  The RME workgroup indicated under RPA 64.2 that additional analysis may be needed to determine if supplementation programs are having a negative impact on recovery.  Negative effects from ecological interactions constitute one of the primary concerns with hatchery programs.  This project will focus on the effects of hatchery reform actions on residualism, which can exacerbate competition and predation effects on natural-origin fish survival.  Hatchery-induced residualism caused by early male maturity would make it nearly impossible to implement hatchery reform alternatives because controlling the proportionate natural influence (PNI) and other important parameters included HSRG models cannot be controlled if residuals are maturing and interbreeding with natural-origin fish.

The project has two biological objectives: 1) Improve survival and reduce fitness loss in Columbia River steelhead smolts by minimizing unnatural selection on body size and other smolt characteristics, and 2) Identify behavioral and physiological traits under selection through laboratory-scale research. The project will pursue the objectives by intensive monitoring of S1 and S2 steelhead smolts at WNFH and conducting mechanistic laboratory-based research on the same populations.
Account Type(s):
Expense
Contract Start Date:
10/01/2013
Contract End Date:
09/30/2014
Current Contract Value:
$51,584
Expenditures:
$48,706

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Obtain BPA NEPA Clearance B: 165. Provide BPA NEPA Staff Appropriate Documenation 07/01/2014 06/30/2014
All administrative tasks fulfilled with timely quality products C: 119. Manage and Administer Contract 09/30/2014 09/25/2014
PIT-tag steelhead juveniles E: 158. PIT tag steelhead juveniles at Winthrop National Fish Hatchery 07/01/2014 06/30/2014
Provide Data/Information to NOAA F: 141. Other Reports for BPA 09/30/2014 09/25/2014
Construct spawning channels and develop monitoring techniques H: 156. Construct spawning channels and develop monitoring techniques 09/30/2014 09/25/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2013
B 165 Provide BPA NEPA Staff Appropriate Documenation 10/01/2013
C 119 Manage and Administer Contract 10/01/2013
D 132 Provide Appropriate PIT Tagging Information to NOAA 10/01/2013
E 158 PIT tag steelhead juveniles at Winthrop National Fish Hatchery 10/01/2013
F 141 Other Reports for BPA 10/01/2013
G 132 RME Annual Technical Report: Provide Data/Information to NOAA 10/01/2013
H 156 Construct spawning channels and develop monitoring techniques 04/11/2014