Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 63637: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED-IDFG ACCORD
Project Number:
Title:
Lower Clearwater and Potlatch Watersheds Habitat Improvements
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
63637
Contract Title:
2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED-IDFG ACCORD
Contract Continuation:
Previous: Next:
59853: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED-IDFG ACCORD
  • 67594: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED ACCORD IDFG
Contract Status:
Closed
Contract Description:
This project is intended to implement habitat restoration activities in the Potlatch River Basin as identified in The Accord. The 377,776-acre Potlatch River watershed is located in north-central Idaho and is the largest tributary in the lower Clearwater River.  The Potlatch River is critical to wild Snake River steelhead.  This project seeks to restore wild Snake River Steelhead to a robust, self-sustaining population within the Potlatch River through coordinated implementation of best management practices on private timber, agricultural and range lands, coordination of interagency watershed planning efforts, and continuation of watershed monitoring and evaluation. This proposal is consistent with the NWPCC Fish and Wildlife Program’s goal to develop habitat-based programs designed to rebuild healthy, naturally producing fish and wildlife populations by protecting, mitigating, and restoring habitats. This project is consistent with the objectives and strategies of the Clearwater Subbasin Management Plan.

This project is intended to implement the Potlatch River Watershed Management Plan. The Plan has identified and prioritized limiting factors and restoration strategies critical to steelhead spawning and rearing within each subwatershed. Priority tributaries for restoration work include:  East and West Fork Potlatch River, Big Bear, Little Bear,  Pine, Cedar, and Corral creeks. The mainstem Potlatch River is also a priority restoration area. Projects will address limiting factors including removing migration barriers, increasing instream habitat complexity, reducing stream temperature and sediment load,  increasing base flows, and reducing high spring run conditions.  Implementation efforts will include but are not limited to repair, removal or replacement of old culverts and bridges, stream and floodplain reconnection, installation of large woody debris and other instream habitat structures, implementation of erosion/sediment control structures, riparian planting, livestock exclusion fencing, off-site water development, and protection of riparian and floodplain areas through easements or direct purchase.

It is intended that project staff will continue to seek additional non-BPA funds to implement best management practices designed for the improvement of steelhead spawning and rearing habitat.  Project staff will also continue coordination efforts with other watershed planning efforts throughout the region to improve fish habitat.

The primary objectives of this contract include:

- Identify, plan, design, fund and implement high priority habitat restoration actions to improve steelhead habitat within the Potlatch River watershed cooperatively with Pacific Coast Salmon Recovery Funds.
- Implement restoration actions in Bloom Creek a tributary to the East Fork Potlatch River;
- Implement restoration actions in Shea Meadow, in the headwaters of Corral Creek;
- Complete the restoration of Fry Meadow on the East Fork of the Potlatch River with spring planting;
- Develop a plan to replace or modify a large culvert on state highway 8 on Big Meadows Creek (Bear Creek drainage) to provide fish passage;
- Develop a plan to allow fish passage at Big Bear Falls in the Bear Creek drainage;
- Fly LiDAR over the Bear Creek drainage and summarize the results.
Account Type(s):
Expense
Contract Start Date:
01/01/2014
Contract End Date:
12/31/2014
Current Contract Value:
$191,149
Expenditures:
$191,149

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Ryan Banks Idaho Department of Fish and Game (IDFG) No Interested Party ryan.banks@idfg.idaho.gov (208) 799-5010
Jan Brady Bonneville Power Administration Yes COR jebrady@bpa.gov (503) 230-4514
Rossana Callejas Bonneville Power Administration No Interested Party rxcallejas@bpa.gov (503) 230-7558
Sharon Clark Idaho Department of Fish and Game (IDFG) No Interested Party sharon.clark@idfg.idaho.gov (208) 287-2784
Mike Edmondson Idaho Governor's Office of Species Conservation No Supervisor mike.edmondson@osc.idaho.gov (208) 334-2189
Peter Hassemer Idaho Department of Fish and Game (IDFG) No Interested Party pete.hassemer@idfg.idaho.gov (208) 287-2781
Amy Hines Idaho Governor's Office of Species Conservation Yes Contract Manager amy.hines@osc.idaho.gov (208) 332-1557
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Eric (IDFG) Leitzinger Idaho Department of Fish and Game (IDFG) Yes Supervisor eric.leitzinger@idfg.idaho.gov (208) 287-2798
Jennifer Lord Bonneville Power Administration Yes Env. Compliance Lead jklord@bpa.gov (503) 230-5192
Ken Stinson Latah Soil and Water Conservation District (SWCD) No Interested Party kstinson@latahswcd.org (509) 338-2549
Tiege Ulschmid Idaho Department of Fish and Game (IDFG) No Contract Manager tiege.ulschmid@idfg.idaho.gov (208) 799-5010
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
All administrative tasks fulfilled with timely quality products A: 119. Project management and administration 12/31/2014 12/31/2014
Environmental Compliance and Consultation Review B: 165. Environmental Compliance and Consultation Review 12/31/2014 12/31/2014
Future Project Identification C: 114. IDFG: Lower Clearwater Project Identification 12/31/2014 12/31/2014
Fry Meadow Planted D: 47. IDFG: Fry Meadow Revegetation 08/31/2014 05/16/2014
Shea Meadow new channel E: 30. IDFG: Shea Meadow Restoration - new channel 12/31/2014
Increase Instream Habitat Complexity in Shea Meadow F: 29. IDFG: Shea Meadow Restoration - complexity 12/01/2014
Shea Meadow planted G: 47. IDFG: Shea Meadow Restoration - vegetation 12/31/2014
Shea Meadow Fence H: 40. IDFG: Shea Meadow Restoration - fence 12/31/2014
Bloom Creek New Channel I: 30. IDFG: Bloom Creek Restoration - new channel 12/31/2014 09/30/2014
Increase Instream Habitat Complexity in Bloom Creek J: 29. IDFG: Bloom Creek Restoration - complexity 12/31/2014 09/30/2014
Bloom Creek Planted K: 47. IDFG: Bloom Creek Restoration - vegetation 12/31/2014 12/31/2014
Bloom Creek Fence L: 40. IDFG: Bloom Creek Restoration - fence 12/31/2014 11/14/2014
Design that allows fish passage at the Hwy 8 culvert. M: 175. IDFG: Big Meadows Creek Culvert - design 12/31/2014 06/30/2014
Final design for fish passage at Big Bear Creek Falls N: 175. IDFG: Big Bear Creek Falls - design 12/31/2014
Bear Creek Drainage LiDAR O: 115. Bear Creek Drainage LiDAR 12/31/2014
Annual Completion Report P: 132. IDFG: Annual report for Contract 59853 04/11/2014 04/11/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 40 Install Fence
  • 3 instances of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project management and administration 01/01/2014
B 165 Environmental Compliance and Consultation Review 01/01/2014
C 114 IDFG: Lower Clearwater Project Identification 01/01/2014
D 47 IDFG: Fry Meadow Revegetation 01/01/2014
E 30 IDFG: Shea Meadow Restoration - new channel 05/08/2014
F 29 IDFG: Shea Meadow Restoration - complexity 05/08/2014
G 47 IDFG: Shea Meadow Restoration - vegetation 05/08/2014
H 40 IDFG: Shea Meadow Restoration - fence 05/08/2014
I 30 IDFG: Bloom Creek Restoration - new channel
J 29 IDFG: Bloom Creek Restoration - complexity 07/02/2014
K 47 IDFG: Bloom Creek Restoration - vegetation 07/02/2014
L 40 IDFG: Bloom Creek Restoration - fence 07/02/2014
M 175 IDFG: Big Meadows Creek Culvert - design 11/18/2013
N 175 IDFG: Big Bear Creek Falls - design 11/18/2013
O 115 Bear Creek Drainage LiDAR 11/18/2013
P 132 IDFG: Annual report for Contract 59853 01/01/2014
Q 185 Periodic Status Reports for BPA 01/01/2014