Close Message
CBFish website will be offline for approximately one hour starting at 5 PM today for maintenance. Thank you for your patience.
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 64730: 1993-066-00 CAP OREGON FISH SCREENS
Project Number:
Title:
Oregon Fish Screens Project
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
64730
Contract Title:
1993-066-00 CAP OREGON FISH SCREENS
Contract Continuation:
Previous: Next:
60212: 1993-066-00 CAP OREGON FISH SCREENS
  • 67802: 1993-066-00 CAP OREGON FISH SCREENS
Contract Status:
Closed
Contract Description:
The project provides immediate and long-term protection for anadromous and resident fish species in the Deschutes, John Day, Umatilla, and Walla Walla subbasins by the installation fish screens, and improvements to fish passage by installation of fish passage devices (ladders, siphons, bottomless culverts at road crossings, etc.) or complete passage barrier removals.  These facilities reduce or eliminate fish loss associated with irrigation withdrawals and passage barriers.  The program uses cost share from NOAA, OWEB Measure 66 (M66) funds, and BPA for implementation.  From 1993 to 1997, the program focused on an inventory of irrigation diversions in need of fish screens, or due to the change in NOAA criteria for Salmonids needed replaced, in the John Day, Umatilla and Walla Walla Basins.  During this time, there were also several pump irrigation screens installed.  In 1997, the program, directed the focus on replacement of non-criteria fish screens and related passage barriers, throughout the John Day, Umatilla and Walla Walla Subbasins.  Since the start of the cooperative efforts between BPA, NOAA, OWEB/M66, ODFW, private landowners, and a multitude of government entities, to present, the program has installed over 297 gravity irrigation diversion screens, over 53 pump screens and 8 fishways that meet the new criteria.  Annual Reports have been provided to BPA that detail results.  

The program will install up to 20 new or replacement fish screens, and implement fish passage project (s) if identified.  If fish passage projects are identified, for each passage project completed, a minimum of two fish screens will be removed from the implementation list.  Size and scope of passage projects will be evaluated prior to work beginning to determine if more screens should be removed from the implementation list.  It should be noted that fish barriers on irrigation return are considered fish passage structures.  The work elements will aid in the breakdown of the costs and describe the actions needed to continue these efforts.
Account Type(s):
Capital
Contract Start Date:
01/01/2014
Contract End Date:
12/31/2014
Current Contract Value:
$1,036,456
Expenditures:
$1,036,456

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Complete Environmental Clearance Documentation or Prepare Biological Assessment A: 165. Complete Environmental Clearance Documentation or Prepare Biological Assessment 12/31/2014 12/31/2014
Identify Projects B: 114. Project Pre-Work 12/31/2014 12/31/2014
Prepare Design & Layout C: 175. Prepare Design & Layout 12/31/2014 12/31/2014
Technical Review: Outside (FS&P) Projects in the John Day Basin D: 122. Technical Review of Screens & Passage Projects 12/31/2014 12/31/2014
Passage Improvement E: 184. Passage Improvement - #1 12/31/2014 12/31/2014
Passage Improvement F: 184. Passage Improvement - #2 12/31/2014 09/30/2014
Passage Improvement G: 184. Passage Improvement - #3 12/31/2014 08/31/2014
Install Gravity Fish Screen H: 69. Install Gravity Fish Screen - #1 12/31/2014
Install Gravity Fish Screen I: 69. Install Gravity Fish Screen - #2 12/31/2014 12/31/2014
Install Gravity Fish Screen J: 69. Install Gravity Fish Screen - #3 12/31/2014 12/31/2014
Install Gravity Fish Screen K: 69. Install Gravity Fish Screen - #4 12/31/2014 12/31/2014
Install Gravity Fish Screen L: 69. Install Gravity Fish Screen - #5 12/31/2014 07/31/2014
Install Gravity Fish Screen M: 69. Install Gravity Fish Screen - #6 12/31/2014 07/31/2014
Install Gravity Fish Screen N: 69. Install Gravity Fish Screen - #7 12/31/2014 07/31/2014
Install Gravity Fish Screen O: 69. Install Gravity Fish Screen - #8 12/31/2014 07/31/2014
Install Pump Fish Screen P: 69. Install Pump Fish Screen - #1 12/31/2014 07/01/2014
Install Pump Fish Screen Q: 69. Install Pump Fish Screen - #2 12/31/2014 07/01/2014
Install Pump Fish Screen R: 69. Install Pump Fish Screen - #3 12/31/2014 07/01/2014
Install Pump Fish Screen S: 69. Install Pump Fish Screen - #4 12/31/2014 07/01/2014
Install Pump Fish Screen T: 69. Install Pump Fish Screen - #5 12/31/2014 07/01/2014
Install Siphon/Fish Exclusion Barrier (Placeholder) U: 80. Install Siphon/Fish Exclusion Barrier #1 (Placeholder) 12/31/2014
Install Siphon/Fish Exclusion Barrier (Placeholder) V: 80. Install Siphon/Fish Exclusion Barrier #2 (Placeholder) 12/31/2014
Install Water Control Structure (Headgate or Water Measuring Device) W: 148. Install Water Control Structure (Headgate or Water Measuring Device) #1 12/31/2014 09/30/2014
Install Water Control Structure (Headgate or Water Measuring Device) X: 148. Install Water Control Structure (Headgate or Water Measuring Device) #2 12/31/2014 09/30/2014
Install Water Control Structure (Headgate or Water Measuring Device) Y: 148. Install Water Control Structure (Headgate or Water Measuring Device) #3 12/31/2014 09/30/2014
Install Water Control Structure (Headgate or Water Measuring Device) Z: 148. Install Water Control Structure (Headgate or Water Measuring Device) #4 12/31/2014
Install Water Control Structure (Headgate or Water Measuring Device) AA: 148. Install Water Control Structure (Headgate or Water Measuring Device) #5 12/31/2014 07/31/2014
Install Water Control Structure (Headgate or Water Measuring Device) AB: 148. Install Water Control Structure (Headgate or Water Measuring Device) #6 12/31/2014 06/30/2014
Install Water Control Structure (Headgate or Water Measuring Device) AC: 148. Install Water Control Structure (Headgate or Water Measuring Device) #7 12/31/2014 06/30/2014
Install Water Control Structure (Headgate or Water Measuring Device) AD: 148. Install Water Control Structure (Headgate or Water Measuring Device) #8 12/31/2014
Install Water Control Structure (Headgate or Water Measuring Device) AE: 148. Install Water Control Structure (Headgate or Water Measuring Device) #9 12/31/2014 08/31/2014
Install Water Control Structure (Headgate or Water Measuring Device) AF: 148. Install Water Control Structure (Headgate or Water Measuring Device) #10 12/31/2014
Install Water Control Structure (Headgate or Water Measuring Device) AG: 148. Install Water Control Structure (Headgate or Water Measuring Device) #11 12/31/2014
Instream Improvement (Placeholder) AH: 29. Instream Improvement (Placeholder) 12/31/2014 09/30/2014
Annual Report Submitted - Uploaded to BPA Website AK: 132. Produce Annual Report 04/09/2014 03/31/2014
All Administrative Tasks Fulfilled with Timely Quality Products AL: 119. Manage & Administer Projects 12/31/2014 12/31/2014
Passage Improvement AM: 184. Passage Improvement - #4 12/31/2014 12/31/2014
Install Pump Fish Screen AN: 69. Install Pump Fish Screen - #6 12/31/2014 12/31/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 14 instances of WE 69 Install Fish Screen
  • 2 instances of WE 80 Install Siphon
  • 4 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 11 instances of WE 148 Install Flow Measuring Device
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 14 instances of WE 69 Install Fish Screen
  • 2 instances of WE 80 Install Siphon
  • 4 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 11 instances of WE 148 Install Flow Measuring Device
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 14 instances of WE 69 Install Fish Screen
  • 2 instances of WE 80 Install Siphon
  • 4 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 11 instances of WE 148 Install Flow Measuring Device
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 14 instances of WE 69 Install Fish Screen
  • 2 instances of WE 80 Install Siphon
  • 4 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 11 instances of WE 148 Install Flow Measuring Device
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 14 instances of WE 69 Install Fish Screen
  • 2 instances of WE 80 Install Siphon
  • 4 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 11 instances of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete Environmental Clearance Documentation or Prepare Biological Assessment 01/01/2014
B 114 Project Pre-Work 01/01/2014
C 175 Prepare Design & Layout 01/28/2014
D 122 Technical Review of Screens & Passage Projects 01/01/2014
E 184 Passage Improvement - #1 10/06/2014
F 184 Passage Improvement - #2 09/24/2014
G 184 Passage Improvement - #3 10/14/2014
H 69 Install Gravity Fish Screen - #1 12/15/2014
I 69 Install Gravity Fish Screen - #2
J 69 Install Gravity Fish Screen - #3
K 69 Install Gravity Fish Screen - #4 12/15/2014
L 69 Install Gravity Fish Screen - #5 10/20/2014
M 69 Install Gravity Fish Screen - #6 07/29/2014
N 69 Install Gravity Fish Screen - #7 07/29/2014
O 69 Install Gravity Fish Screen - #8 07/28/2014
P 69 Install Pump Fish Screen - #1 01/30/2014
Q 69 Install Pump Fish Screen - #2 01/30/2014
R 69 Install Pump Fish Screen - #3 01/30/2014
S 69 Install Pump Fish Screen - #4 02/06/2014
T 69 Install Pump Fish Screen - #5 01/30/2014
U 80 Install Siphon/Fish Exclusion Barrier #1 (Placeholder)
V 80 Install Siphon/Fish Exclusion Barrier #2 (Placeholder)
W 148 Install Water Control Structure (Headgate or Water Measuring Device) #1 12/15/2014
X 148 Install Water Control Structure (Headgate or Water Measuring Device) #2 12/15/2014
Y 148 Install Water Control Structure (Headgate or Water Measuring Device) #3 12/15/2014
Z 148 Install Water Control Structure (Headgate or Water Measuring Device) #4
AA 148 Install Water Control Structure (Headgate or Water Measuring Device) #5 10/20/2014
AB 148 Install Water Control Structure (Headgate or Water Measuring Device) #6 07/29/2014
AC 148 Install Water Control Structure (Headgate or Water Measuring Device) #7 07/29/2014
AD 148 Install Water Control Structure (Headgate or Water Measuring Device) #8 07/29/2014
AE 148 Install Water Control Structure (Headgate or Water Measuring Device) #9 07/29/2014
AF 148 Install Water Control Structure (Headgate or Water Measuring Device) #10 10/20/2014
AG 148 Install Water Control Structure (Headgate or Water Measuring Device) #11 07/29/2014
AH 29 Instream Improvement (Placeholder) 09/24/2014
AI 186 Maintain Screen & Passage Devices
AJ 185 Periodic Status Reports for BPA 01/01/2014
AK 132 Produce Annual Report 01/01/2014
AL 119 Manage & Administer Projects 01/01/2014
AM 184 Passage Improvement - #4 11/03/2014
AN 69 Install Pump Fish Screen - #6 11/12/2014