Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 67802: 1993-066-00 CAP OREGON FISH SCREENS
Project Number:
Title:
Oregon Fish Screens Project
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
67802
Contract Title:
1993-066-00 CAP OREGON FISH SCREENS
Contract Continuation:
Previous: Next:
64730: 1993-066-00 CAP OREGON FISH SCREENS
  • 71422: 1993-066-00 EXP OREGON FISH SCREENS PROJECTS
Contract Status:
Closed
Contract Description:
The project provides immediate and long-term protection for anadromous and resident fish species in the Deschutes, John Day, Umatilla, and Walla Walla subbasins by the installation fish screens, and improvements to fish passage by installation of fish passage devices (ladders, siphons, bottomless culverts at road crossings, etc.) or complete passage barrier removals.  These facilities reduce or eliminate fish loss associated with irrigation withdrawals and passage barriers.  The program uses cost share from NOAA, OWEB Measure 66 (M66) funds, and BPA for implementation.  From 1993 to 1997, the program focused on an inventory of irrigation diversions in need of fish screens, or due to the change in NOAA criteria for Salmonids needed replaced, in the John Day, Umatilla and Walla Walla Basins.  During this time, there were also several pump irrigation screens installed.  In 1997, the program, directed the focus on replacement of non-criteria fish screens and related passage barriers, throughout the John Day, Umatilla and Walla Walla Subbasins.  As of the end of FY2013, cooperative efforts between BPA, NOAA, OWEB/M66, ODFW, private landowners, and a multitude of government entities have allowed the program to install over 321 gravity diversion screens, 67 pump screens, and 10 passage structures that meet the new criteria in the John Day, Umatilla and Walla Walla River subbasins..  Annual Reports have been provided to BPA that detail results.  

The program will install up to 8 gravity screens, up to 5 pump screens, up to 3 passage projects, and up to 11 water control structures (Headgates and/or Water measuring devices); and implement fish habitat restoration project(s) if identified. The project may elect to move money between pump fish screens, gravity fish screens, water control structures, and passage structures. The following ratios will be used to re-distribute funds: 1 passage structure equals 2 gravity fish screens; 5 pump screens equal 1 gravity fish screen; and 3 water control structures equal 1 pump fish screen. Size and scope of all projects will be evaluated prior to work beginning to determine if projects should be removed from the implementation list (larger projects equal more money).  It should be noted that fish barriers on irrigation returns are considered fish passage structures.  The work elements will aid in the breakdown of the costs and describe the actions needed to continue these efforts.
Account Type(s):
Capital
Contract Start Date:
01/01/2015
Contract End Date:
12/31/2015
Current Contract Value:
$1,063,719
Expenditures:
$1,063,719

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Complete Environmental Clearance Documentation or Prepare Biological Assessment A: 165. Complete Environmental Clearance Documentation 12/31/2015 12/21/2015
Identify Projects B: 114. Project Pre-Work 12/31/2015 12/21/2015
Prepare Design & Layout C: 175. Prepare Design & Layout 12/31/2015 12/21/2015
Technical Review: Outside (FS&P) Projects in the John Day Basin D: 122. Technical Review of Screens & Passage Projects 12/31/2015 12/21/2015
Passage Improvement G: 184. Passage Improvement - #3 12/31/2015 08/31/2015
Passage Improvement H: 184. Passage Improvement - #4 (Placeholder) 12/31/2015 08/14/2015
Passage Improvement I: 184. Passage Improvement - #5 (Placeholder) 12/31/2015 08/31/2015
Passage Improvement J: 184. Passage Improvement - #6 (Placeholder) 12/31/2015 08/31/2015
Passage Improvement K: 184. Passage Improvement - #7 (Placeholder) 12/31/2015 08/31/2015
Install Gravity Fish Screen N: 69. Install Gravity Fish Screen - #3 12/31/2015 11/30/2015
Install Gravity Fish Screen Q: 69. Install Gravity Fish Screen - #6 12/31/2015 06/30/2015
Install Gravity Fish Screen U: 69. Install Gravity Fish Screen - #10 (Placeholder) 12/31/2015 10/01/2015
Install Pump Fish Screen AA: 69. Install Pump Fish Screen - #2 12/31/2015 12/21/2015
Install Pump Fish Screen AB: 69. Install Pump Fish Screen - #3 12/31/2015 06/30/2015
Install Pump Fish Screen AC: 69. Install Pump Fish Screen - #4 12/31/2015 06/30/2015
Install Pump Fish Screen AD: 69. Install Pump Fish Screen - #5 12/31/2015 06/30/2015
Install Pump Fish Screen AE: 69. Install Pump Fish Screen - #6 (Placeholder) 12/31/2015 09/30/2015
Install Pump Fish Screen AF: 69. Install Pump Fish Screen - #7 (Placeholder) 12/31/2015 09/30/2015
Install Pump Fish Screen AG: 69. Install Pump Fish Screen - #8 (Placeholder) 12/31/2015 09/30/2015
Install Pump Fish Screen AH: 69. Install Pump Fish Screen - #9 (Placeholder) 12/31/2015 09/30/2015
Install Pump Fish Screen AI: 69. Install Pump Fish Screen - #10 (Placeholder) 12/31/2015 12/21/2015
Install Siphon/Fish Exclusion Barrier (Placeholder) AK: 80. Install Siphon/Fish Exclusion Barrier #2 (Placeholder) 12/31/2015 06/30/2015
Install Water Control Structure (Headgate or Water Measuring Device) AT: 148. Install Water Control Structure (Headgate or Water Measuring Device) #1 12/31/2015 12/21/2015
Install Water Control Structure (Headgate or Water Measuring Device) AW: 148. Install Water Control Structure (Headgate or Water Measuring Device) #4 12/31/2015 12/21/2015
Install Water Control Structure (Headgate or Water Measuring Device) AX: 148. Install Water Control Structure (Headgate or Water Measuring Device) #5 12/31/2015 12/21/2015
Install Water Control Structure (Headgate or Water Measuring Device) BE: 148. Install Water Control Structure (Headgate or Water Measuring Device) #12 (Placeholder) 12/31/2015 08/31/2015
Install Water Control Structure (Headgate or Water Measuring Device) BF: 148. Install Water Control Structure (Headgate or Water Measuring Device) #13 (Placeholder) 12/31/2015 10/01/2015
Instream Improvement (Placeholder) BI: 29. Instream Improvement #1 (Placeholder) 12/31/2015 08/31/2015
Instream Improvement (Placeholder) BJ: 29. Instream Improvement #2 (Placeholder) 12/31/2015 08/14/2015
Progress Report has been published BM: 132. Submit Progress Report for the Period (1/1/2014) to (12/31/2014) 03/31/2015 03/30/2015
All Administrative Tasks Fulfilled with Timely Quality Products BN: 119. Manage & Administer Projects 12/31/2015 12/21/2015
Passage Improvement BO: 184. Passage Improvement - #8 12/31/2015 08/31/2015
Install Water Control Structure (Headgate or Water Measuring Device) BQ: 148. Install Water Control Structure (Headgate or Water Measuring Device) #12 (Placeholder) 12/31/2015 12/21/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 24 instances of WE 69 Install Fish Screen
  • 10 instances of WE 80 Install Siphon
  • 9 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 16 instances of WE 148 Install Flow Measuring Device
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 24 instances of WE 69 Install Fish Screen
  • 10 instances of WE 80 Install Siphon
  • 9 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 16 instances of WE 148 Install Flow Measuring Device
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
Cutthroat Trout, Coastal (O. clarkii clarkii)- Resident Populations
  • 1 instance of WE 184 Install Fish Passage Structure
Cutthroat Trout, Westslope (O. c. lewisi)
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 24 instances of WE 69 Install Fish Screen
  • 10 instances of WE 80 Install Siphon
  • 8 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 16 instances of WE 148 Install Flow Measuring Device
Trout, Bull (S. confluentus) (Threatened)
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 24 instances of WE 69 Install Fish Screen
  • 10 instances of WE 80 Install Siphon
  • 9 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 16 instances of WE 148 Install Flow Measuring Device
Trout, Interior Redband (O. mykiss gairdnerii)
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 24 instances of WE 69 Install Fish Screen
  • 10 instances of WE 80 Install Siphon
  • 9 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 16 instances of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete Environmental Clearance Documentation 01/01/2015
B 114 Project Pre-Work 01/01/2015
C 175 Prepare Design & Layout 01/01/2015
D 122 Technical Review of Screens & Passage Projects 01/01/2015
E 184 Passage Improvement - #1 08/25/2015
F 184 Passage Improvement - #2 08/25/2015
G 184 Passage Improvement - #3 07/14/2015
H 184 Passage Improvement - #4 (Placeholder) 07/09/2015
I 184 Passage Improvement - #5 (Placeholder) 09/08/2015
J 184 Passage Improvement - #6 (Placeholder) 09/15/2015
K 184 Passage Improvement - #7 (Placeholder) 09/08/2015
L 69 Install Gravity Fish Screen - #1 07/01/2015
M 69 Install Gravity Fish Screen - #2 06/23/2015
N 69 Install Gravity Fish Screen - #3 06/23/2015
O 69 Install Gravity Fish Screen - #4 06/24/2015
P 69 Install Gravity Fish Screen - #5 06/23/2015
Q 69 Install Gravity Fish Screen - #6 06/24/2015
R 69 Install Gravity Fish Screen - #7
S 69 Install Gravity Fish Screen - #8
T 69 Install Gravity Fish Screen - #9 (Placeholder)
U 69 Install Gravity Fish Screen - #10 (Placeholder) 08/11/2015
V 69 Install Gravity Fish Screen - #11 (Placeholder) 07/14/2015
W 69 Install Gravity Fish Screen - #12 (Placeholder) 08/25/2015
X 69 Install Gravity Fish Screen - #13 (Placeholder) 08/25/2015
Y 69 Install Gravity Fish Screen - #14 (Placeholder) 08/25/2015
Z 69 Install Pump Fish Screen - #1 06/24/2015
AA 69 Install Pump Fish Screen - #2 10/09/2015
AB 69 Install Pump Fish Screen - #3 06/24/2015
AC 69 Install Pump Fish Screen - #4 06/24/2015
AD 69 Install Pump Fish Screen - #5 06/24/2015
AE 69 Install Pump Fish Screen - #6 (Placeholder) 06/24/2015
AF 69 Install Pump Fish Screen - #7 (Placeholder) 06/24/2015
AG 69 Install Pump Fish Screen - #8 (Placeholder) 06/24/2015
AH 69 Install Pump Fish Screen - #9 (Placeholder) 06/24/2015
AI 69 Install Pump Fish Screen - #10 (Placeholder) 06/25/2015
AJ 80 Install Siphon/Fish Exclusion Barrier #1 (Placeholder)
AK 80 Install Siphon/Fish Exclusion Barrier #2 (Placeholder) 06/24/2015
AL 80 Install Siphon/Fish Exclusion Barrier #3 (Placeholder)
AM 80 Install Siphon/Fish Exclusion Barrier #4 (Placeholder)
AN 80 Install Siphon/Fish Exclusion Barrier #5 (Placeholder)
AO 80 Install Siphon/Fish Exclusion Barrier #6 (Placeholder)
AP 80 Install Siphon/Fish Exclusion Barrier #7 (Placeholder)
AQ 80 Install Siphon/Fish Exclusion Barrier #8 (Placeholder)
AR 80 Install Siphon/Fish Exclusion Barrier #9 (Placeholder)
AS 80 Install Siphon/Fish Exclusion Barrier #10 (Placeholder)
AT 148 Install Water Control Structure (Headgate or Water Measuring Device) #1 10/09/2015
AU 148 Install Water Control Structure (Headgate or Water Measuring Device) #2
AV 148 Install Water Control Structure (Headgate or Water Measuring Device) #3
AW 148 Install Water Control Structure (Headgate or Water Measuring Device) #4 06/23/2015
AX 148 Install Water Control Structure (Headgate or Water Measuring Device) #5 06/23/2015
AY 148 Install Water Control Structure (Headgate or Water Measuring Device) #6 06/23/2015
AZ 148 Install Water Control Structure (Headgate or Water Measuring Device) #7 06/23/2015
BA 148 Install Water Control Structure (Headgate or Water Measuring Device) #8 06/23/2015
BB 148 Install Water Control Structure (Headgate or Water Measuring Device) #9 06/23/2015
BC 148 Install Water Control Structure (Headgate or Water Measuring Device) #10 06/24/2015
BD 148 Install Water Control Structure (Headgate or Water Measuring Device) #11 06/24/2015
BE 148 Install Water Control Structure (Headgate or Water Measuring Device) #12 (Placeholder) 08/11/2015
BF 148 Install Water Control Structure (Headgate or Water Measuring Device) #13 (Placeholder) 08/11/2015
BG 148 Install Water Control Structure (Headgate or Water Measuring Device) #14 (Placeholder)
BH 148 Install Water Control Structure (Headgate or Water Measuring Device) #15 (Placeholder)
BI 29 Instream Improvement #1 (Placeholder) 09/08/2015
BJ 29 Instream Improvement #2 (Placeholder) 07/14/2015
BK 29 Instream Improvement #3 (Placeholder)
BL 185 Periodic Status Reports for BPA 01/01/2015
BM 132 Submit Progress Report for the Period (1/1/2014) to (12/31/2014) 01/01/2015
BN 119 Manage & Administer Projects 01/01/2015
BO 184 Passage Improvement - #8 07/14/2015
BP 184 Passage Improvement - #9 (Placeholder)
BQ 148 Install Water Control Structure (Headgate or Water Measuring Device) #12 (Placeholder) 10/09/2015