Contract 67897: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RESTORATION 2015
Project Number:
Title:
Lower South Fork Clearwater/Slate Creek Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
67897
Contract Title:
2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RESTORATION 2015
Contract Continuation:
Previous: Next:
64048: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RESTORATION
  • 71445: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RESTORATION 2016
Contract Status:
Closed
Contract Description:
Contract History:

This project is implemented as part of the Nez Perce-Clearwater National Forests (NPCNF)/Nez Perce Tribe (NPT) restoration partnership.  This project represents a merger of two ongoing Bonneville Power Administration (BPA) and NPT restoration projects, #1996-077-05, Meadow Creek Watershed Restoration and #2000-036-00, Mill Creek Watershed Restoration, and an expansion of the project area to include all of the NPCNF lands in the lower South Fork Clearwater River Basin rather than just selected watersheds.  The restoration partnership has been ongoing in the basin since 1996 and this project unification greatly increases the geographic area covered, and enhances the administrative and financial efficiency in order to maximize the direct benefit to fish and wildlife.

The goal of the project is to restore the physical and biological characteristics of the watershed to provide quality habitat for anadromous and resident fish species that support the historical, cultural, and economic practices of the Nez Perce Tribe.  The South Fork Clearwater River watershed contains proposed critical habitat for listed species Steelhead trout, potential critical habitat for bull Trout, and has moderate habitat potential for Spring Chinook salmon.  Restoration follows a ridge top to ridge top approach with implementation focused on restoring riparian processes by addressing increased water temperatures, increased sedimentation, cattle grazing effects, aquatic habitat connectivity, and exotic, invasive plants.  The cost share for this project has been contributed by the NPCNF who provides at least a 20% match including cash and in-kind contributions. Project planning and implementation responsibilities are also shared with the NPCNF.

FY 15 implementation includes the survey and contract preparation for the future replacement of 2 culverts, three culvert replacement (to improve fish passage and hydrologic capacity, reduce potential sediment delivery, and provide connectivity), riparian planting (to decrease water temperatures and reduce potential sediment delivery), fence maintenance (to protect riparian plants), and continued planning and coordination for next year's projects and out-year habitat improvements.  NPT Watershed personnel will also continue an inventory of roads and stream crossings throughout the Lower South Fork Clearwater River watershed in order to identify fish passage barriers and road associated risks to aquatic species.
Account Type(s):
Expense
Contract Start Date:
03/01/2015
Contract End Date:
02/29/2016
Current Contract Value:
$693,166
Expenditures:
$693,166

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Miranda Gordon Nez Perce Tribe Yes Technical Contact mirandag@nezperce.org (208) 621-3547
Jenifer Harris Nez Perce Tribe No Interested Party jeniferh@nezperce.org (208) 983-1290
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Mark Johnson Nez Perce Tribe Yes Contract Manager markj@nezperce.org (208) 621-3561
Amber MacLachlan Bonneville Power Administration Yes Contracting Officer almcmahon@bpa.gov (503) 230-3983
Heidi McRoberts Nez Perce Tribe Yes Supervisor heidim@nezperce.org (208) 621-3548
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Emmit Taylor, Jr. Nez Perce Tribe No Supervisor emmitt@nezperce.org (208) 621-3544
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental compliance documentation submitted to BPA A: 165. Provide environmental compliance information to BPA for projects 02/29/2016 02/29/2016
Designs and Cost Estimates B: 175. Final Design and Cost Estimate for Leggett Creek Culvert 10/15/2015 11/01/2015
Designs and Cost Estimates C: 175. Final Design and Cost Estimate for Moose Creek Culvert 10/15/2015 11/01/2015
Culvert replaced D: 184. Replace Black George Creek Culvert Replacements 11/30/2015 07/01/2015
Culvert replaced E: 184. Replace Adams Creek Culvert Replacement 11/30/2015 09/01/2015
Riparian Vegetation Planted G: 47. Plant Riparian Vegetation - Previous Restoration Projects 02/29/2016 12/15/2015
Riparian Vegetation Planted H: 47. Plant Riparian Vegetation - McComas Meadows 02/29/2016 12/15/2015
Exclosure Fence Maintained I: 186. Maintain Exclosure Fences - Mill Creek 07/01/2015 05/04/2015
Exclosure fence maintained J: 186. Maintain Exclosure Fences - McComas Meadows 07/01/2015 05/04/2015
Culvert and Bridge Inventory K: 115. Assess Condition of Existing Culverts and Bridges 02/29/2016 02/05/2016
Road Inventory L: 115. Assess Condition of Roads to Identify Aquatic Impacts 02/29/2016 02/05/2016
Manage Projects and Administrative duties M: 119. Management, Coordination, and Communication 12/31/2015 12/31/2015
Upload 2015 Annual Report to Pisces N: 132. 2015 Annual Report - 3/1/2015 - 2/29/2016 02/26/2016 02/25/2016
Meadow Creek Slide assessment completed P: 115. Meadow Creek Slide Area 02/01/2016 02/24/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 47 Plant Vegetation
  • 3 instances of WE 184 Install Fish Passage Structure
  • 3 instances of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 47 Plant Vegetation
  • 3 instances of WE 184 Install Fish Passage Structure
  • 3 instances of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide environmental compliance information to BPA for projects 03/01/2015
B 175 Final Design and Cost Estimate for Leggett Creek Culvert 05/19/2015
C 175 Final Design and Cost Estimate for Moose Creek Culvert 05/19/2015
D 184 Replace Black George Creek Culvert Replacements 04/14/2015
E 184 Replace Adams Creek Culvert Replacement 04/27/2015
F 184 Peasley Creek Culvert Improvement
G 47 Plant Riparian Vegetation - Previous Restoration Projects 04/23/2015
H 47 Plant Riparian Vegetation - McComas Meadows 04/23/2015
I 186 Maintain Exclosure Fences - Mill Creek 05/19/2015
J 186 Maintain Exclosure Fences - McComas Meadows 05/19/2015
K 115 Assess Condition of Existing Culverts and Bridges 05/19/2015
L 115 Assess Condition of Roads to Identify Aquatic Impacts 05/19/2015
M 119 Management, Coordination, and Communication 03/01/2015
N 132 2015 Annual Report - 3/1/2015 - 2/29/2016 03/01/2015
O 185 Periodic Status Reports for BPA 03/01/2015
P 115 Meadow Creek Slide Area 05/19/2015