Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 72415: 1998-019-00 EXP WIND RIVER WATERSHED UCD
Project Number:
Title:
Wind River Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Wind 100.00%
Contract Number:
72415
Contract Title:
1998-019-00 EXP WIND RIVER WATERSHED UCD
Contract Continuation:
Previous: Next:
69740: 1998-019-00 EXP WIND RIVER WATERSHED UCD
  • 76220: 1998-019-00 EXP WIND RIVER WATERSHED UCD
Contract Status:
Closed
Contract Description:
This contract supports and is part of the Wind River Watershed Project, initiated in 1998.  The project's focus is on restoration of Wind River steelhead.  In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical.  In 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia river as "threatened" under the Endangered Species Act.  Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery/restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative.  Project participants are the Underwood Conservation District, US Geological Survey, US Forest Service, and Washington Department of Fish and Wildlife.  

This contract continues Underwood Conservation District's support and participation in the project.  UCD will provide habitat restoration work in support of the recovery of the Wind River summer steelhead stock in 2016 and 2017.  Work will focus on evaluating potential restoration sites for on-the-ground work in future BPA contracts.  At least three sites have been selected, and conceptual restoration plans for at least one will be developed and readied for the subsequent contract.  Additional work involves maintaining vegetation at past planting sites and installing new plants at sites throughout the Wind River watershed.  Other work such as producing periodic (quarterly) status reports, the annual progress report, coordinating with project partners, producing environmental compliance documentation, stream temperature monitoring, as well as managing and administering the project will be funded at levels to allow continued maintenance of these activities.
Account Type(s):
Expense
Contract Start Date:
07/01/2016
Contract End Date:
06/30/2017
Current Contract Value:
$59,305
Expenditures:
$59,305

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jamie Cleveland Bonneville Power Administration Yes COR jacleveland@bpa.gov (503) 230-3160
Jan Douglas Bonneville Power Administration Yes Contracting Officer jmdouglas@bpa.gov (503) 230-4164
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Ann Gross Underwood Conservation District (UCD) Yes Administrative Contact ann@ucdwa.org (509) 493-1936
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Dan Richardson Underwood Conservation District (UCD) Yes Contract Manager dan@ucdwa.org (509) 493-1936
Jan Thomas Underwood Conservation District (UCD) Yes Technical Contact jan@ucdwa.org (509) 493-1936
Tova Tillinghast Underwood Conservation District (UCD) Yes Supervisor tova@ucdwa.org (509) 493-1936


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Manage Project A: 119. Manage and Administer Projects 06/30/2017 06/30/2017
Completed 2016 Annual Report C: 132. Submit Progress Report for the period Jan 01, 2016 - Dec 31, 2016 05/31/2017 05/31/2017
Provide Support to USGS/WDFW for BiOp RPA Report in Taurus D: 202. Support RM&E Leads with CY2016 BiOp RPA Report 03/15/2017 03/15/2017
Share project information E: 191. Share Project Activities Updates with Project Partners 06/30/2017 06/30/2017
Environmental Compliance is complete F: 165. Environmental Compliance 06/30/2017 06/30/2017
Conceptual site plans for at least 1 future habitat enhancement project G: 114. Identify and Develop Potential Steelhead Habitat Restoration Projects 06/30/2017 06/30/2017
Temperature Data Collected, Stored in Water Quality Database H: 157. Stream Temperature Monitoring 06/30/2017 06/30/2017
Plant Native Vegetation - Wind River I: 47. Plant Vegetation - Wind River 06/30/2017 06/30/2017
Former planting sites replanted, maintained, enhanced J: 198. Enhance Vegetation - various sites 06/30/2017 06/30/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and Administer Projects 07/01/2017
B 185 Periodic Status Reports for BPA 07/01/2017
C 132 Submit Progress Report for the period Jan 01, 2016 - Dec 31, 2016 07/01/2017
D 202 Support RM&E Leads with CY2016 BiOp RPA Report
E 191 Share Project Activities Updates with Project Partners 07/01/2017
F 165 Environmental Compliance 07/01/2017
G 114 Identify and Develop Potential Steelhead Habitat Restoration Projects 07/01/2017
H 157 Stream Temperature Monitoring 07/31/2017
I 47 Plant Vegetation - Wind River 07/31/2017
J 198 Enhance Vegetation - various sites 03/09/2017