SOW Report
Contract 72585: 2002-059-00 EXP WEST FORK YANKEE FORK PHASE II
Project Number:
Title:
Yankee Fork Salmon River Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
72585
Contract Title:
2002-059-00 EXP WEST FORK YANKEE FORK PHASE II
Contract Continuation:
Previous: Next:
69333: 2002-059-00 EXP WEST FORK YANKEE FORK PHASE I
  • 76751: 2002-059-00 EXP YANKEE FORK PS1/PREACHERS PLUS
Contract Status:
Closed
Contract Description:
Create habitat for Chinook and steelhead at the confluence of the Yankee Fork and the West Fork by moving the Yankee Fork to the new channel, created during 2015 (phase I of this project), and creating a side-channel where the existing Yankee Fork channel will be abandoned.  Fish habitat will be created in the Yankee Fork downstream from the new confluence by creating two split channel segments.  Dredge tailings will be removed from the flood plain so that the flood-plain can be re-activated.  Disturbed areas will be seeded and planted with woody vegetation.
Account Type(s):
Expense
Contract Start Date:
06/01/2016
Contract End Date:
05/31/2017
Current Contract Value:
$268,281
Expenditures:
$268,281

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Interested Party ccolter@sbtribes.com (208) 239-4553
Mark Davidson Trout Unlimited (TU) No Supervisor mdavidson@tu.org (208) 720-2475
Lytle Denny Shoshone-Bannock Tribes No Interested Party ldenny@sbtribes.com (208) 239-4560
Paul Drury US Bureau of Reclamation (BOR) No Interested Party pdrury@usbr.gov (208) 378-5076
Israel Duran Bonneville Power Administration No Env. Compliance Lead induran@bpa.gov (503) 230-3967
Evelyn Galloway Shoshone-Bannock Tribes No Technical Contact egalloway@sbtribes.com (208) 239-4570
Matt Green Trout Unlimited (TU) Yes Interested Party mgreen@tu.org (208) 251-0197
Jim Gregory Trout Unlimited (TU) Yes Technical Contact gregory_jim@yahoo.com (208) 390-5306
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Daniel Stone Shoshone-Bannock Tribes No Interested Party dstone@sbtribes.com (208) 239-4555
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Caselle Wood Trout Unlimited (TU) Yes Contract Manager caselle.wood@tu.org (208) 390-2028
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Complete all required EC and obtain site specific permits prior to implementation of project A: 165. Environmental Compliance 02/15/2017 03/22/2017
Construction Management Complete B: 100. Construction management for West Fork Yankee Fork Phase I restoration project 03/31/2017 12/30/2016
As built record drawings submitted to BPA. C: 29. Increase complexity on West Fork Yankee Fork Phase I restoration project 01/31/2017 10/21/2016
Obtain and stage trees and stage spawning gravel D: 29. Obtain and stage trees and stage spawning gravel 09/30/2016 07/29/2016
As Built Map of Channel E: 30. Construct new channel 01/31/2017 10/21/2016
Create, Restore, and Enhance wetlands F: 181. Create, Restore, and Enhance wetlands 11/01/2016 09/14/2016
As built record drawings submitted. G: 55. Construction Site Best Management Practices 01/31/2017 12/30/2016
Enhance Floodplain H: 180. Enhance Floodplain 11/30/2016 09/30/2016
Remove mine tailings I: 52. Remove Mine Tailings 11/01/2016 09/14/2016
Plant vegetation at West Fork Yankee Fork Phase II restoration project J: 47. Plant vegetation at West Fork Yankee Fork Phase I restoration project 12/15/2016 12/15/2016
All administrative tasks fulfilled with timely quality products K: 119. Manage and Administer Project 05/31/2017 05/31/2017
Completed Annual Report M: 132. Submit Progress Report for the period June 2016 thru May 2017 05/31/2017 05/18/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 52 Remove Mine Tailings
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 52 Remove Mine Tailings
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 06/01/2016
B 100 Construction management for West Fork Yankee Fork Phase I restoration project 06/01/2016
C 29 Increase complexity on West Fork Yankee Fork Phase I restoration project 06/01/2016
D 29 Obtain and stage trees and stage spawning gravel 06/01/2016
E 30 Construct new channel 06/01/2016
F 181 Create, Restore, and Enhance wetlands 06/01/2016
G 55 Construction Site Best Management Practices 06/01/2016
H 180 Enhance Floodplain 06/01/2016
I 52 Remove Mine Tailings 06/01/2016
J 47 Plant vegetation at West Fork Yankee Fork Phase I restoration project 06/01/2016
K 119 Manage and Administer Project 06/01/2016
L 185 Periodic Status Reports for BPA 06/01/2016
M 132 Submit Progress Report for the period June 2016 thru May 2017 06/01/2016