Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
RSS Feed for updates to Project 2002-059-00 - Yankee Fork Salmon River Restoration Follow this via RSS feed. Help setting up RSS feeds?

Project Summary

Project 2002-059-00 - Yankee Fork Salmon River Restoration
Project Number:
2002-059-00
Title:
Yankee Fork Salmon River Restoration
Summary:
The goal of the Yankee Fork Dredge Tailings Restoration Project is to restore natural river channel characteristics, floodplain function, hydraulic and sediment regimes, and aquatic habitat within the dredged reach of the YFSR, initially by redistributing dredge tailings piles from the floodplain. Restoring the YFSR, historically a major Chinook salmon producer, to natural conditions will create a healthy, functioning riparian community providing numerous benefits to fish and wildlife.

The Yankee Fork Restoration Project is working to improve floodplain/riparian zones along the dredge sections of the Yankee Fork Salmon River (YFSR). Approximately six miles of stream habitat on private land on the YFSR have been severely altered by dredge -mining (1938-1952), eliminating much of the natural meander pattern of the stream and associated in-stream habitat, and riparian vegetation and function. The altered stream corridor consists of unconsolidated and un-vegetated dredge tailings, which have increased sedimentation of spawning gravels and rearing pools. The mainstem YFSR has down-cut, causing upslope instability, also affecting many tributary streams. As a result of the extensive dredge mining, a complete re-channeling of lower portions of the Yankee Fork has occurred along with the deposition of extensive unconsolidated dredge piles. This section of the river has been widened and the channel straightened compared to pre-dredging conditions. The substrate has been severely altered and is now dominated by boulders and cobbles with few spawning gravels. The historic floodplain can no longer be accessed and the riparian zone has been severely altered. Following dredge mining, the Yankee Fork road was rebuilt over the dredge tailings. This road is the primary public thoroughfare to the Yankee Fork drainage, and provides access for popular seasonal recreational activities, and also to the jointly-administered USFS and State of Idaho "Land of the Yankee Fork" State Park and Historical Area established for the interpretation of historic mining in this area of Idaho. The road also provides access to an on-going large-scale open pit gold mine and to private holdings and residences within the drainage.

The goal of the Yankee Fork Dredge Tailings Restoration Project is to restore natural river channel characteristics, floodplain function, hydraulic and sediment regimes, and aquatic habitat within the dredged reach of the YFSR. Restoring the YFSR, historically a major Chinook salmon producer, to natural conditions will create a healthy, functioning riparian community providing numerous benefits to fish and wildlife. Expected outcomes include benefits to anadromous salmonids through a healthy, functioning floodplain and riparian community, an increase in spawning and rearing habitat for salmonids, an increase in instream habitat diversity, and upslope stabilization.

The Yankee Fork, one of the larger watersheds within the upper Salmon River, is a large stream with diversity of habitats, availability of low gradient stream channel reaches, aquatic productivity, and a remnant spawning and rearing population, make the Yankee Fork a potential important Chinook drainage within the upper Salmon River subbasin. Snake River stocks of Chinook salmon have used the Yankee Fork and its tributaries for spawning and rearing long before human settlements or mining within the watershed. Every summer the Bannock Tribe would camp at the mouth of Ramey Creek to harvest spawning salmon. Because of the strong historical fish populations, habitat capability must have been high to support the different species' life histories. More recently, Snake River Chinook salmon populations have suffered direct mortality associated with hydropower operations of on the Columbia River and the lower Snake River. In addition, habitat degradation, introduction of exotic species, hatchery supplementation, and instream flow diversions have induced additive pressures on the population as a whole. Due to the decline of this species, Snake River spring/summer salmon were listed under the Endangered Species Act as threatened on April 22, 1992 (57 FR 42529), and the Yankee Fork is classified as critical habitat (57 FR 14653). Until passage problems are resolved, the resiliency and persistence of remaining wild Chinook salmon stocks will be largely dependent on the quality and diversity of remaining stream habitats. All remaining populations and habitats for Chinook salmon are critical to the persistence and recovery of this species.
In accordance with the Fish and Wildlife Program goals, this project will benefit the biological needs of salmon, steelhead, and bull trout and protect other native fish and wildlife species by improving habitat conditions in the Yankee Fork Salmon River. This project will involve cooperative habitat protection and improvement with private landowners; majority of the land is owned by Simplot, Inc. These priva
Proposer:
None
Proponent Orgs:
Shoshone-Bannock Tribes (Tribe)
Starting FY:
2002
Ending FY:
2032
BPA PM:
Stage:
Implementation - Project Status Report
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Purpose:
Habitat
Emphasis:
Restoration/Protection
Focal Species:
Chinook - All Populations
Chinook - Snake River Fall ESU
Chinook - Snake River Spring/Summer
Chinook - Snake River Spring/Summer ESU
Chinook - Upper Columbia River Spring ESU
Cutthroat Trout, Westslope
Cutthroat Trout, Yellowstone
Other Resident
Steelhead - All Populations
Steelhead - Snake River DPS
Trout, Bull
Trout, Rainbow
Whitefish, Mountain
Species Benefit:
Anadromous: 100.0%   Resident: 0.0%   Wildlife: 0.0%
Special:
None
BiOp Association:
FCRPS 2008 – view list of FCRPS 2008 BiOp Actions

Tributary Habitat Implementation 2007 to 2009,
Tributary Habitat Implementation 2007 to 2009,
Tributary Habitat Implementation 2007 to 2009

Description: Page: 31 Figure 1: Yankee Fork Salmon River location within central Idaho, a major tributary to Salmon River. Map by HHayball.

Project(s): 2002-059-00

Document: P127273

Dimensions: 898 x 707

Description: Page: 32 Figure 2: Topographic map of Yankee Fork Salmon River with sonde locations at: Flat Rock Bridge, Bonanza Bridge, Custer Bridge, Jordan Creek Bridge and West Fork Yankee Fork.

Project(s): 2002-059-00

Document: P127273

Dimensions: 515 x 860


Summary of Budgets

To view all expenditures for all fiscal years, click "Project Exp. by FY"

To see more detailed project budget information, please visit the "Project Budget" page

Decided Budget Transfers  (FY2024 - FY2026)

Acct FY Acct Type Amount Fund Budget Decision Date
FY2024 Expense $307,500 From: Fish Accord - Shoshone Bannock Shoshone Bannock Tribe (SBT) 2023-2025 Accord Extension 09/30/2022
FY2024 Expense $18,408 From: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 3/20/24 03/21/2024
FY2024 Expense $18,408 To: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 3/20/24 03/21/2024
FY2024 Expense $10,806 From: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 3/20/24 03/21/2024
FY2024 Expense $10,806 To: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 3/20/24 03/21/2024
FY2024 Expense $115,681 From: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 3/20/24 03/21/2024
FY2024 Expense $115,681 To: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 3/20/24 03/21/2024
FY2024 Expense $28,614 From: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 3/20/24 03/21/2024
FY2024 Expense $28,614 To: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 3/20/24 03/21/2024
FY2024 Expense $8,746 From: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 3/20/24 03/21/2024
FY2024 Expense $8,746 To: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 3/20/24 03/21/2024
FY2024 Expense $164 From: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 3/20/24 03/21/2024
FY2024 Expense $57,282 From: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 5/1/2024 05/02/2024
FY2024 Expense $57,282 To: Fish Accord - Shoshone Bannock Accord Transfers (SBT) 5/1/2024 05/02/2024
FY2025 Expense $315,188 From: Fish Accord - Shoshone Bannock Shoshone Bannock Tribe (SBT) 2023-2025 Accord Extension 09/30/2022

Pending Budget Decision?  No


Actual Project Cost Share

Current Fiscal Year — 2025
Cost Share Partner Total Proposed Contribution Total Confirmed Contribution
There are no project cost share contributions to show.
Previous Fiscal Years
Fiscal Year Total Contributions % of Budget
2024 (Draft)
2023 $47,217 14%
2022 $25,196 8%
2021 $356,085 54%
2020 $841,622 56%
2019 $889,477 60%
2018 $1,123,251 64%
2017 $929,635 67%
2016 $655,799 55%
2015 $1,125,352 70%
2014 $3,727,045 88%
2013 $19,367 4%
2012 $2,500 0%
2011
2010
2009 $0 0%
2008 $0 0%
2007 $176,797 32%

Contracts

The table below contains contracts with the following statuses: Active, Closed, Complete, History, Issued.
* "Total Contracted Amount" column includes contracted amount from both capital and expense components of the contract.
Expense Contracts:
Number Contractor Name Title Status Total Contracted Amount Dates
21531 SOW Shoshone-Bannock Tribes PI 2002-059-00 PL YANKEE FORK SALMON RIVER DREDGE TAILINGS RESTOR Closed $146,238 4/1/2005 - 3/31/2006
27719 SOW Shoshone-Bannock Tribes 2002-059-00 YANKEE FORK SALMON R. DREDGE TAILINGS Closed $154,897 4/1/2006 - 6/30/2007
34513 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FK SALMON R. DREDGE TAILINGS RESTORE Closed $367,473 6/15/2007 - 12/31/2008
40747 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON R. DREDGE TAILINGS RESTORATION Closed $313,042 1/1/2009 - 1/31/2010
45892 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Closed $273,944 2/1/2010 - 1/31/2011
51571 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Closed $317,134 2/1/2011 - 1/31/2012
56041 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Closed $254,963 2/1/2012 - 1/31/2013
58324 SOW Idaho Governor's Office of Species Conservation 2002-059-00 EXP YANKEE FORK SIDE CHANNEL RESTORATION - SERIES 3 History $1,318,468 8/15/2012 - 9/30/2013
60303 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION History $245,999 2/1/2013 - 1/31/2014
62671 SOW Trout Unlimited (TU) 2002-059-00 EXP YANKEE FORK SALMON RIVER PS2 History $173,892 9/1/2013 - 8/31/2014
63691 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION - SBT Closed $308,052 2/1/2014 - 1/31/2015
65446 SOW Trout Unlimited (TU) 2002-059-00 EXP YANKEE FORK RESTORATION - PREACHERS COVE History $181,592 6/15/2014 - 8/31/2015
67810 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Closed $240,676 2/1/2015 - 1/31/2016
69333 SOW Trout Unlimited (TU) 2002-059-00 EXP WEST FORK YANKEE FORK PHASE I Closed $241,303 6/1/2015 - 5/31/2016
71277 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Closed $272,258 2/1/2016 - 1/31/2017
72585 SOW Trout Unlimited (TU) 2002-059-00 EXP WEST FORK YANKEE FORK PHASE II Closed $268,281 6/1/2016 - 5/31/2017
75002 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Closed $276,813 2/1/2017 - 1/31/2018
76751 SOW Trout Unlimited (TU) 2002-059-00 EXP YANKEE FORK PS1/PREACHERS PLUS Closed $52,164 6/1/2017 - 5/31/2018
77111 REL 5 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Closed $298,006 2/1/2018 - 1/31/2019
79310 SOW Trout Unlimited (TU) 2002-059-00 EXP BONANZA PHASE 1 Closed $324,666 6/1/2018 - 2/28/2019
77111 REL 13 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Closed $297,047 2/1/2019 - 1/31/2020
81598 SOW Trout Unlimited (TU) 2002-059-00 EXP BONANZA PHASE II Closed $255,755 3/1/2019 - 2/29/2020
77111 REL 25 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Closed $286,516 2/1/2020 - 1/31/2021
84695 SOW Trout Unlimited (TU) 2002-059-00 EXP BONANZA PHASE III Closed $290,954 3/1/2020 - 2/28/2021
77111 REL 35 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Closed $225,595 3/15/2021 - 2/28/2022
88434 SOW Trout Unlimited (TU) 2002-059-00 EXP BONANZA CITY Closed $3,836 8/1/2021 - 4/30/2022
77111 REL 45 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Closed $209,943 3/1/2022 - 2/28/2023
84068 REL 3 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Issued $235,229 3/1/2023 - 2/29/2024
92782 SOW Trout Unlimited (TU) 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Issued $43,567 7/1/2023 - 6/30/2024
BPA-013988 Bonneville Power Administration FY24 PIT Tags Active $2,166 10/1/2023 - 9/30/2024
84068 REL 12 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Issued $272,104 3/1/2024 - 2/28/2025
94864 SOW Trout Unlimited (TU) 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Signature $33,394 7/1/2024 - 6/30/2025
CR-374864 SOW Shoshone-Bannock Tribes 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Pending $315,188 3/1/2025 - 2/28/2026



Annual Progress Reports
Expected (since FY2004):37
Completed:27
On time:27
Status Reports
Completed:121
On time:65
Avg Days Late:10

                Count of Contract Deliverables
Earliest Contract Subsequent Contracts Title Contractor Earliest Start Latest End Latest Status Accepted Reports Complete Green Yellow Red Total % Green and Complete Canceled
21531 27719, 34513, 40747, 45892, 51571, 56041, 60303, 63691, 67810, 71277, 75002, 77111 REL 5, 77111 REL 13, 77111 REL 25, 77111 REL 35, 77111 REL 45, 84068 REL 3, 84068 REL 12, CR-374864 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Shoshone-Bannock Tribes 04/01/2005 02/28/2026 Pending 78 175 17 1 38 231 83.12% 0
58324 2002-059-00 EXP YANKEE FORK SIDE CHANNEL RESTORATION - SERIES 3 Idaho Governor's Office of Species Conservation 08/15/2012 09/30/2013 History 4 11 0 0 2 13 84.62% 0
62671 2002-059-00 EXP YANKEE FORK SALMON RIVER PS2 Trout Unlimited (TU) 09/01/2013 08/31/2014 History 4 10 0 0 0 10 100.00% 0
65446 69333, 72585, 76751, 79310, 81598, 84695, 88434, 92782, 94864 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION Trout Unlimited (TU) 06/15/2014 06/30/2025 Signature 35 63 4 0 11 78 85.90% 1
BPA-13988 FY24 PIT Tags Bonneville Power Administration 10/01/2023 09/30/2024 Active 0 0 0 0 0 0 0
Project Totals 121 259 21 1 51 332 84.34% 1


The table content is updated frequently and thus contains more recent information than what was in the original proposal reviewed by ISRP and Council.

Review: 2022 Anadromous Fish Habitat & Hatchery Review

Council Recommendation

Assessment Number: 2002-059-00-NPCC-20230310
Project: 2002-059-00 - Yankee Fork Salmon River Restoration
Review: 2022 Anadromous Fish Habitat & Hatchery Review
Approved Date: 4/15/2022
Recommendation: Implement with Conditions
Comments: Sponsor is planning to submit a response by May 2022. Outyear implementation (FY2023) dependent upon Council decision.

[Background: See https://www.nwcouncil.org/2021-2022-anadromous-habitat-and-hatchery-review/]

Independent Scientific Review Panel Assessment

Assessment Number: 2002-059-00-ISRP-20230324
Project: 2002-059-00 - Yankee Fork Salmon River Restoration
Review: 2022 Anadromous Fish Habitat & Hatchery Review
Completed Date: None
Documentation Links:
Review: 2013 Geographic Category Review

Council Recommendation

Assessment Number: 2002-059-00-NPCC-20131126
Project: 2002-059-00 - Yankee Fork Salmon River Restoration
Review: 2013 Geographic Category Review
Proposal: GEOREV-2002-059-00
Proposal State: Pending BPA Response
Approved Date: 11/5/2013
Recommendation: Implement
Comments: Implement through FY 2018 per August 2013 Council recommendation.

Independent Scientific Review Panel Assessment

Assessment Number: 2002-059-00-ISRP-20130610
Project: 2002-059-00 - Yankee Fork Salmon River Restoration
Review: 2013 Geographic Category Review
Proposal Number: GEOREV-2002-059-00
Completed Date: 9/27/2013
Final Round ISRP Date: 8/15/2013
Final Round ISRP Rating: Meets Scientific Review Criteria
Final Round ISRP Comment:

In response to the Northwest Power and Conservation Council’s request, the ISRP expedited its evaluation of the Shoshone-Bannock Tribes’ project titled Yankee Fork Salmon River Restoration (#200205900) as part of the Geographic Review. The ISRP asked for a response in its Preliminary Report for the Geographic Review (ISRP 2013-4). The Tribes responded to the ISRP concerns, many of which were identified in previous reviews of the project (see ISRP 2012-10). The ISRP submitted a final review memo to the Council on July 25, 2013 (ISRP 2013-9). The ISRP’s scientific review comments are provided below.

The ISRP appreciates the complete and timely response. For the most part, the detailed and elaborate response materials effectively address the issues raised in the ISRP’s preliminary review. The sponsor should consider and address the ISRP comments below in project contracting, implementation, monitoring, results reporting, and future reviews.

Preliminary Review Question 1. Winter Cover in Pond Series 3

The ISRP appreciates the new information and excellent photographs regarding winter habitat conditions at work sites. We agree with the response observation that, while not immediately obvious, adequate winter habitat has indeed been created as part of the Pond Series 3. The work on Pond Series 3 should serve as a useful template for ongoing efforts.

It will be interesting to see the effective life-span of some of the smaller trees used to provide cover over part of the project area. It seems likely that trees spanning the channel and situated above the water surface will likely decay rapidly and may lose their effectiveness as overhead cover. This possibility should be tracked as part of project monitoring.

The project focuses on creating "low-velocity (0–25 cm/s), moderate-depth (40–80 cm) pools that contain cover, which will primarily consist of wood" under the assumption that these are habitats selected by juvenile fish during the summer and are critical for overwinter survival. As noted below, some localized monitoring should be done to see if the habitat is actually being used.

Preliminary Review Question 2. ISRP Qualifications from the 2012-10 Review

a. Specific quantitative objectives for VSP parameters

The sponsor states that fish monitoring is conducted by another project. This response misses the point. The ultimate purpose of the project is to improve the status of steelhead and spring Chinook. This project should be using and evaluating itself with a yard-stick based on salmon and steelhead abundance, productivity, spatial distribution, and diversity. It is important for habitat projects to keep the overall goal of improved salmon and steelhead population status in mind when planning, implementing, and evaluating habitat restoration actions.

b. Physical habitat objectives

The sponsor indicates that existing and target metrics for physical habitat conditions in the project areas are provided in Table 6 of the Yankee Fork Fluvial Habitat Rehabilitation Plan (Reclamation and Tribes 2013, Document ID P132500). CHaMP methods will be used for evaluation. This information satisfies the qualification, but at least a summary of Table 6 should be provided in the proposal and, when appropriate, in annual reports so readers can easily locate the information.

c. RM&E Plans - physical and biological monitoring

Our 2010 review of the project (ISRP 2012-10) asked that the sponsor describe monitoring and evaluation sufficient to evaluate fluvial geomorphic conditions following habitat construction and fish population response. The original proposal did not have a habitat monitoring plan available at the time of the geographic review, but the tribes have now submitted a plan (The Fish Habitat Monitoring Plan for the Yankee Fork Watershed [WSI, 2013], Document ID P132591). The plan is based on CHaMP methods and a modified BACI design. With the understanding that the Council, BPA, and the Tribes requested an expedited review, the ISRP has focused on the restoration activities of the project and provides only a limited review of this M&E plan. We offer general rather than detailed comments to improve the plan and project evaluation.

The WSI (2013) document describes a habitat-monitoring plan. Monitoring at the watershed level for fish population responses is described in project #2008-905-00. However, some smaller scale fish population monitoring is needed as the two monitoring plans mentioned above will be insufficient to answer some important questions. For example, do fish move from existing (presumably poor) habitat to the new, restored habitat? WSI (2013, Section 3.2) also recommended that “the fish study design be developed and implemented with the habitat study design to best elucidate how restoration actions influence fish populations.” Local monitoring is important to help the sponsor develop the most efficient designs to improve overwinter rearing habitat in this very harsh environment. This issue can be addressed in the statement of work and evaluated in future reviews.

The ISRP continues to note that CHaMP is a summer physical habitat protocol and important winter attributes may be missed. Additionally, food web and chemical features of the environment may not be detected using CHaMP methods.

Preliminary Review Question 3. Identify Key Habitat Attributes

The discussion of target habitat attributes and fish life stages were clear, detailed, and the conclusions appear to be logical and supportable.

Preliminary Review Question 4. Budget and Logistics

The ISRP understands that these are internal administrative decisions that fall within the purview of the Council, BPA, and Tribe.

Evaluation of results

The program, in conjunction with its partners, has accomplished the following actions to date:

  •  Yankee Fork Tributary Assessment
  •  Pole Flat Area Baseline Condition Assessment
  •  Bonanza Area Reach Assessment
  •  November 2012 completion of Pond Series 3 side channel
  •  Yankee Fork Fluvial Habitat Rehabilitation Plan
First Round ISRP Date: 6/10/2013
First Round ISRP Rating: Response Requested
First Round ISRP Comment:

A response is requested to address the following items:

1) More information is needed about the apparent lack of overwintering habitat and cover for juvenile anadromous fishes created in the just-completed Pond Series 3 channel. The root wads and sufficient overwinter habitat complexity expected by the ISRP were not evident during the site visit. A project engineer mentioned that they were not able to obtain the large wood material from the U.S. Forest Service. If that is the case, the ISRP has concerns that the PS 2 and 4 pond series renovation proposed for the upcoming funding period will have winter habitat issues as well, and that should also be addressed.

2) Qualifications identified in the ISRP 2012-10 review are not resolved based on information provided in the current proposal. See the detailed explanation in the Results, Accomplishments, and Adaptive Management section below.

3)The three objectives, to reconnect historic channel and floodplain interactions, to enhance floodplain and instream complexity, and to conduct adaptive management, including monitoring, seem reasonable. The response, however, should identify the key habitat attributes that are desired and discuss what fish species and life stages will benefit and how they will benefit.

4) The project budget is entirely allocated to contractors beginning in FY 2017. It is not clear from the proposal whether the sponsor believes construction activities for habitat restoration will be complete in Yankee Fork at the close of this proposal in 2018.

Other comments are provided below as feedback for the sponsors for future consideration.The Yankee Fork restoration project is closely associated with the Bureau of Reclamation and Trout Unlimited and has employed a reasonable planning path from subbasin and recovery plan to tributary assessment to reach assessment. The Bonanza Reach Assessment concludes that site specific evaluation is needed before actual project selection and design is initiated. The ISRP believes this approach is justified in pursuing restoration of the Yankee Fork. However, the tasks required to complete the planning are not described in the proposal. Also absent is consideration of the mechanism to determine a preferred approach among various options, which include biological benefits, risks and potential benefits from active management at any specific site, and social challenges such as willing landowners. This discussion needs to be included in Annual Reports.

1. Purpose: Significance to Regional Programs, Technical Background, and Objectives

The proposal to rehabilitate dredged landscape in the Yankee Fork floodplain has been identified in previous reviews. However, the prime benefits were not clear in the proposal, for example juvenile habitat or over winter habitat. The current proposal adequately describes its significance to regional programs. The restoration of the dredge-mined section of the Yankee Fork is identified in the Salmon River subbasin plan, Draft Idaho Recovery Plan, BiOP RPA 35, and is generally consistent with policy and science elements in the 2009 Fish and Wildlife Program.

Technical Background: The sponsor should provide a goal equivalent to a vision statement regarding the status of fish and habitat. Specifically, is there a goal of establishing habitat sufficient to support self-sustaining populations of spring Chinook and steelhead? Reference should be made to the Yankee Fork Technical Assessment and the Bonanza and Pole Creek reach assessments to explain briefly the historical, current, and anticipated restored habitat. The Executive Summary provides the title of several construction projects which should be briefly explained in the technical background. Questions remain such as how do these projects help achieve the Yankee Fork goals and how were they selected using the watershed and reach assessments? In particular, the Bonanza assessment identifies a process of alternatives development. The technical background should provide a paragraph or two on what alternatives were considered and explain why the listed projects were chosen as the preferred alternatives.

Objectives appear consistent with the Fish and Wildlife Program and BiOp RPA. The specific long-term goal of a 30% survival of spring Chinook salmon from egg to smolt seems optimistic.

The BOR Tributary Assessment that was part of the previous review is quoted as indicating that the Pole Flat and Bonanza reaches "had the highest geomorphic potential" and that they, in addition to Jordan Creek represent 90 - 95% of the improvement potential. It was not clear how that conclusion was determined.

2. History: Accomplishments, Results, and Adaptive Management (Evaluation of Results)

Information presented on past accomplishments is contradictory. The summary table shows only water quality information collected, but later sections show that several assessments, PS3 side channel construction, and establishment of a monitoring plan have been completed. In the accomplishments section there is mention of a Yankee Fork Habitat Monitoring Plan, which is a component of the Shoshone-Bannock Tribe's RME Plan under development. The accomplishments section goes on to report the implementation of field studies will begin in 2013. The larger Tribal RME plan and the Yankee Fork plan need to be included. The SRHE project states that they will be collecting habitat data for the Yankee Fork, but in 2013 the work will be contracted to CHaMP. All of these elements need to be discussed, in more detail, in future proposals.

Adaptive Management: The sponsor has demonstrated willingness to follow-up on ISRP recommendations to establish benefit goals for salmon and habitat, conduct reach assessments consistent with the tributary assessment, and use those assessments to develop habitat restoration actions. However, a direct link from the reach assessment to proposed individual actions is not transparent. Also, the reach assessment does not present a clear set of alternative choices to achieve the habitat restoration goal, rather a set of actions that all appear necessary to some degree. The reach assessment does not help with establishing a balance among the actions given the list of social and cost constraints. The overall Yankee Fork restoration effort leaps from the reach assessment to well-developed plans for P3 and P2.

Response to past ISRP qualifications: In a cover letter accompanying the proposal submission the Shoshone-Bannock Tribe addresses qualifications raised by the ISRP in the review of PS-3 (ISRP 2012-10). The ISRP identified three qualifications needing further development: a) biological objectives for focal species in terms of Viable Salmonid Population parameters, b) physical habitat objectives developed in reach scale assessments consistent with the Tributary Assessment, and c) monitoring and evaluation sufficient to evaluate fluvial geomorphic conditions following habitat construction and fish population response.

Biological and physical objectives are addressed in this proposal in the Objectives and Project Deliverables Section. Existing and target metrics are provided and the limiting factors addressed are identified for each deliverable. ISEMP monitoring will evaluate fish population response, and CHaMP monitoring will evaluate geomorphic conditions following construction.

For a) biological objectives for focal species, the proposal provides in the text for Deliverable 1, 2, and 3. “Focal Species: Chinook salmon, steelhead, bull trout and westslope cutthroat. Viable Salmonid Population (VSP) Parameters Improved: Abundance and productivity.”

The ISRP concludes that specific quantitative objectives for VSP parameters need to be established, not just a statement that they will be improved. These quantitative objectives serve as benchmarks for evaluation of the efficacy of restoration strategies in adaptive management.

For b) physical habitat objectives developed in reach scale assessments consistent with the Tributary Assessment, the proposal provides text, but no succinct answer to the question posed. There is no identified linkage between the deliverables and the objectives, reach assessment, and tributary assessment.

For c) monitoring and evaluation sufficient to evaluate fluvial geomorphic conditions following habitat construction and fish population response, the proposal states: ISEMP monitoring will evaluate fish population response and CHaMP monitoring will evaluate geomorphic conditions following construction.”

Without providing more details on ISEMP monitoring of fish population response including the metrics and methods and CHaMP monitoring of physical features including geomorphic and habitat limiting factors, the ISRP is unable to conclude that monitoring is sufficient.

Based on these observations the ISRP concludes that the response to qualifications raised in earlier ISRP reviews were not resolved.

3. Project Relationships, Emerging Limiting Factors, and Tailored Questions

Previous reviews expressed concerns about mobilization of mercury and other contaminants when the dredging works are disturbed. The proposal indicated that work on PS 3 answered these concerns, but nothing was presented.

The Salmon River Habitat Restoration (SRHE) project’s role was not clear. This proposal states that allocation of funds to YFSR restoration project is insufficient and consequently some funds from SRHE are going to be used for restoration implementation. The SRHE proposal identifies that 20% of the budget is supporting restoration deliverables and work elements in this proposal. It is not clear to the ISRP why more funding is not assigned to YFSR restoration project and less to SRHE, and the habitat status and monitoring tasks assigned to SRHE, as suggested by the ISRP in 2006. These seem to be administrative decisions at several levels, not scientific ones, but it leads to difficulty reviewing both proposals.

Emerging Limiting Factors: The discussion is primarily limited to reduction in stream flow volume and altered timing of water supply associated with climate change. There should be some discussion of the status of mining, logging, and grazing that may influence the watershed, as well as discussion of any potential for additional second home building and expanded recreational use that may increase road densities and affect the stream ecology. Also, forest health and potential issues of increased wild fire and insect and disease outbreaks, in existing timber stands, may be a significant issue in the future.

4. Deliverables, Work Elements, Metrics, and Methods

The proposal has a long list of activities in each deliverable but also indicates that achieving rehabilitation would not require implementation of all of the identified actions. It was not clear to reviewers how the decision to stop will be made. Are time and money limiting, or is there some recognizable signal that indicates it is time to stop?

The deliverables section does not provide convenient linkage from the reach assessment to the identified actions so they can be associated with habitat restoration priorities and choices in the reach assessment. The deliverable has a lengthy list of potential sites to implement actions in Floodplain Reconnection RM 8.35-7.45 (DELV-1) and Floodplain Reconnection RM 9.15-8.35 (DELV-3), but no process for developing alternatives and choosing among them is provided. No deliverables or work elements are identified for more planning.

At this time these planned actions are not fully formed and their support requires a leap of faith from reviewers. On the positive side, the range of options being considered for each of the five sites is mentioned. It is not clear what the completed efforts will provide for improved fish production.

No monitoring is described in this study, but the proposal indicates the Tribes are implementing an RM&E strategy based in part on the Columbia Habitat Monitoring Program (CHaMP) and may include contracted services. The Tribes are presently working on the specifics of the RM&E program and plan on having a draft out for review in early spring 2013.

Modified by Dal Marsters on 9/27/2013 11:46:09 AM.
Documentation Links:
  • Proponent Response (7/9/2013)
Review: FY07-09 Solicitation Review

Council Recommendation

Assessment Number: 2002-059-00-NPCC-20090924
Project: 2002-059-00 - Yankee Fork Salmon River Restoration
Review: FY07-09 Solicitation Review
Approved Date: 10/23/2006
Recommendation: Fund
Comments: Fundable in part (qualified). Fund completion of planning work for step submittal to address ISRP concerns. Funding for implementation contingent upon favorable ISRP and Council review.

Independent Scientific Review Panel Assessment

Assessment Number: 2002-059-00-ISRP-20060831
Project: 2002-059-00 - Yankee Fork Salmon River Restoration
Review: FY07-09 Solicitation Review
Completed Date: 8/31/2006
Final Round ISRP Date: None
Final Round ISRP Rating: Meets Scientific Review Criteria - In Part (Qualified)
Final Round ISRP Comment:
The sponsors provided a quality response that is further evidence of the strength of their team. Some progress in negotiating with Simplot is evident. However, significant issues of concern to the ISRP remain. Reviewers continue to agree there can be little doubt that the dredge impacted reach of Yankee Fork could be better habitat for native salmonids. Even with their careful analysis of responses provided by the sponsor, reviewers remain skeptical that significant gains in smolt production from the area and adult production in the upper Salmon River basin will result even if the project sponsors are successful in increasing productivity of the reach. And, because of the profound alteration of the system, reviewers remain unconvinced that the desired rehabilitation is even possible. The ISRP strongly recommends that this project needs a benefits analysis by the Council with comparison to other alternative protection and restoration activities in the area.

The ISRP recommends Fundable in Part (Qualified) for this project. The qualification includes two requirements. First, a thorough analysis of the likely benefits for Chinook salmon and other focal species in the area is required. Second, the sponsors need to obtain pre-implementation reviews of project plans that describe the scientific basis of the methods to be applied and for what purpose. A report of these findings should be submitted to the Council and reviewed by the ISRP before any Fish and Wildlife Program funds are committed to project activities. The ISRP understands that the Council's Three-Step Review Process can be used for complex and high cost restoration projects; this project would benefit from such a review. In sum, this project is scientifically justified to complete this planning phase but is not justified to begin implementation.
Documentation Links:

Legal Assessment (In-Lieu)

Assessment Number: 2002-059-00-INLIEU-20090521
Project Number: 2002-059-00
Review: FY07-09 Solicitation Review
Completed Date: 10/6/2006
In Lieu Rating: Problems May Exist
Cost Share Rating: 3 - Does not appear reasonable
Comment: Restoration activities (addressing impacts of old dredge mining in particular); unclear if on Forest Service lands (in which case, project covered by BPA-FS MOU?) or on private lands (JR Simplot) in which case would need confirmation that Simplot not already required to address, and that cost share is reasonable.

Capital Assessment

Assessment Number: 2002-059-00-CAPITAL-20090618
Project Number: 2002-059-00
Review: FY07-09 Solicitation Review
Completed Date: 2/27/2007
Capital Rating: Does Not Qualify for Capital Funding
Capital Asset Category: None
Comment: None

Project Relationships: None

Name Role Organization
Chad Colter Supervisor Shoshone-Bannock Tribes
Israel Duran Env. Compliance Lead Bonneville Power Administration
David Kaplowe Supervisor Bonneville Power Administration
Jacee Weed Administrative Contact Shoshone-Bannock Tribes
Daniel Stone (Inactive) Technical Contact Shoshone-Bannock Tribes
Hunter Osborne Technical Contact Shoshone-Bannock Tribes
Joseph Snapp Project Lead Shoshone-Bannock Tribes
Ryan Ruggiero Project Manager Bonneville Power Administration