| Province | Subbasin | % |
|---|---|---|
| Columbia Plateau | Columbia Lower Middle | 100.00% |
| Previous: | Next: |
|---|---|
| 73354 REL 82: 2007-155-00 EXP SUPPORT DESIGN OF YN STURGEON HATCHERY |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Effective implementation management and timely contract administration | B: 119. Contract Development and Direction | 08/31/2024 | 08/27/2024 | |
| Water Plan completed | C: 174. Water Evaluations at Marion Drain Hatchery Site | 08/31/2024 | 12/15/2023 | |
| Meeting notes | D: 189. Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin | 08/31/2024 | 08/27/2024 | |
| EC documents | F: 165. STEP 2: Assist with NEPA process contracted by BPA | 08/31/2024 | ||
| Final Design Report | G: 175. Preliminary Design of the Marion Drain Sturgeon facility | 08/31/2024 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | |||||||
| B | 119 | Contract Development and Direction | |||||||
| C | 174 | Water Evaluations at Marion Drain Hatchery Site | |||||||
| D | 189 | Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin | |||||||
| E | 196 | STEP 2: Master Plan Step 2 Tasks | |||||||
| F | 165 | STEP 2: Assist with NEPA process contracted by BPA | |||||||
| G | 175 | Preliminary Design of the Marion Drain Sturgeon facility | 08/03/2023 | ||||||
| H | 132 | Submit Progress Report for the period (Sep 2023) to (Aug 2024) |