| Province | Subbasin | % |
|---|---|---|
| Columbia Plateau | Columbia Lower Middle | 100.00% |
| Previous: | Next: |
|---|---|
| 73354 REL 65: 2007-155-00 EXP DEVELOP STURGEON MASTER PLAN; SUPPORT DESIGN |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Effective implementation management and timely contract administration | B: 119. Contract Development and Direction | 08/31/2023 | 08/31/2022 | |
| Workshop Proceedings | D: 189. Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin | 08/31/2023 | 05/10/2023 | |
| Environmental Compliance Documentation | E: 165. STEP 2: Assist with NEPA process contracted by BPA | 08/31/2023 | ||
| Water Plan for Yakama Sturgeon Hatchery | F: 174. Water Evaluations at Marion Drain Hatchery Site | 08/31/2023 | ||
| Preliminary Hatchery Design Report | G: 175. Preliminary Design of the Marion Drain Sturgeon facility | 08/31/2023 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | |||||||
| B | 119 | Contract Development and Direction | |||||||
| C | 196 | STEP 2: Master Plan Step 2 Tasks | |||||||
| D | 189 | Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin | |||||||
| E | 165 | STEP 2: Assist with NEPA process contracted by BPA | |||||||
| F | 174 | Water Evaluations at Marion Drain Hatchery Site | |||||||
| G | 175 | Preliminary Design of the Marion Drain Sturgeon facility | |||||||
| H | 132 | Annual progress report not required |