| Province | Subbasin | % |
|---|---|---|
| Middle Snake | Snake Lower Middle | 100.00% |
| Previous: | Next: |
|---|---|
| 70703: 2012-013-00 EXP WDFW SNAKE RIVER FALL CHINOOK M&E |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| All administrative tasks fulfilled with timely quality products | B: 119. Manage and Administer fall Chinook fidelity and fall back Project | 06/30/2018 | 06/29/2018 | |
| Obtain and submit environmental permits | C: 165. Maintain Environmental Compliance | 12/29/2017 | 12/29/2017 | |
| 2017 Escapement monitoring data provided to NPT for archiving | F: 157. Download fixed sites and radio track fall Chinook in the Snake in 2017 | 12/08/2017 | 12/08/2017 | |
| Produce accessible, error-checked datasets | G: 157. Compile and proof datasets of 2017 tagging data and submit to NPT for master database | 12/08/2017 | 12/08/2017 | |
| Complete Radio tagging of adult fall Chinook | H: 158. Insert Radio Transmitters into Adult fall Chinook at Lower Granite Dam in 2017 | 11/20/2017 | 11/20/2017 | |
| Work with the NPT in determining fidelity and fallback of fall Chinook | I: 162. Work with the NPT to evaluate fidelity and fall back of fall Chinook | 07/31/2017 | 05/09/2017 | |
| Dissemination of results | J: 161. Communication of 2013-2016 results and 2017 tagging | 12/29/2017 | 05/16/2017 | |
| Assist NPT with drafting 2013-2017 Roll up report | K: 141. Assist with drafting 2013-2017 Roll up report of results | 06/30/2018 | 05/16/2017 | |
| Assist Nez Perce Tribe as needed with completion of BiOp RPA Report in Taurus | L: 202. BiOp RPA Report for CY2016 | 03/15/2017 | 03/15/2017 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | 01/01/2017 | ||||||
| B | 119 | Manage and Administer fall Chinook fidelity and fall back Project | 01/01/2017 | ||||||
| C | 165 | Maintain Environmental Compliance | 01/01/2017 | ||||||
| D | 132 | 2015 Annual Report with 2016 summary data will be submitted by NPT | 01/01/2017 | ||||||
| E | 132 | 2013-2016 Preliminary rollup report with 2017 summary data | 01/01/2017 | ||||||
| F | 157 | Download fixed sites and radio track fall Chinook in the Snake in 2017 | 11/15/2016 | ||||||
| G | 157 | Compile and proof datasets of 2017 tagging data and submit to NPT for master database | 01/01/2017 | ||||||
| H | 158 | Insert Radio Transmitters into Adult fall Chinook at Lower Granite Dam in 2017 | 01/01/2017 | ||||||
| I | 162 | Work with the NPT to evaluate fidelity and fall back of fall Chinook | 01/01/2017 | ||||||
| J | 161 | Communication of 2013-2016 results and 2017 tagging | 01/01/2017 | ||||||
| K | 141 | Assist with drafting 2013-2017 Roll up report of results | 01/01/2017 | ||||||
| L | 202 | BiOp RPA Report for CY2016 |