Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 75266: 1992-026-01 EXP UPPER GRANDE RONDE CULVERT REPLACEMENT
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
75266
Contract Title:
1992-026-01 EXP UPPER GRANDE RONDE CULVERT REPLACEMENT
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
Overview

Limber Jim, North Fork Limber Jim, and North Fork West Chicken Creeks are streams where culvert replacements would occur.  All three of the pipes are round, undersized, and without native streambed.  This project would replace the culverts with arch pipes or concrete box culverts that have native streambed, are capable of passing a 100 year event and meet ODFW fish passage criteria.

Project Description

Culvert removal/replacement will occur on Limber Jim Creek, North Fork Limber Jim Creek and North Fork West Fork Chicken Creek.  All three of the pipes are round, undersized, and without native streambed.  This project would replace the culverts with arch pipes or concrete box culverts that have native streambed, are capable of passing a 100 year event and meet ODFW fish passage criteria.  Culvert replacements on Limber Jim and North Fork Limber Jim Creeks will provide full passage to 2 miles of chinook, 6.5 miles of steelhead, and 7.5 miles of bull trout habitat.  The culvert replacement on North Fork West Chicken Creek will provide habitat to 1 mile of steelhead habitat. All disturbed areas would be seeded, mulched and planted with 300 conifer and deciduous seedlings.

Objective

Fish passage for 2 miles of chinook, 7.5 miles of steelhead habitat and 7.5 miles of bull trout habitat

Effectiveness Monitoring

Monitoring will include:  

•   Photo points:  Monitoring will involve photo points of before and after operations occur.  Follow up photo points will occur at year 1, 2 and 3 after project completion.  This monitoring will occur by Joe Platz.
    
•   Culvert Assessment:  An assessment of culvert stability, erosion concerns, associated damage and debris clogs will occur on every year for 3 years.  This monitoring will be conducted by Mark Gomez.
Account Type(s):
Expense
Contract Start Date:
05/01/2017
Contract End Date:
04/30/2018
Current Contract Value:
$182,172
Expenditures:
$182,172

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Sarah Brandy US Forest Service (USFS) No Interested Party sarah.brandy@usda.gov (541) 962-8590
Mary Estes Grande Ronde Model Watershed Foundation No Interested Party mary@grmw.org (541) 663-0570
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Aric Johnson US Forest Service (USFS) No Supervisor ajjohnson@fs.fed.us (541) 962-8517
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Joe Platz US Department of Agriculture (USDA) Yes Contract Manager joe.platz@usda.gov (541) 962-8571
Robert Shull Bonneville Power Administration No Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Jesse Steele Grande Ronde Model Watershed Foundation No Interested Party jesse@grmw.org (541) 663-0570
Connar Stone Grande Ronde Model Watershed Foundation No Interested Party connar@grmw.org (541) 663-0570
Alexandra Towne Grande Ronde Model Watershed Foundation Yes Interested Party alex@grmw.org (541) 663-0570


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance A: 165. Environmental Compliance 11/30/2017 11/30/2017
Limber Jim Mainstem Culvert B: 184. Limber Jim Mainstem culvert 11/30/2017 11/30/2017
North Fork Limber Jim Mainstem Culvert C: 184. North Fork Limber Jim culvert 11/30/2017 11/30/2017
North Fork West Chicken Culvert D: 184. North Fork West Chicken culvert 11/30/2017 11/30/2017
Successful Project Administration E: 119. Project/Contract Administration 04/30/2018 04/30/2018
Upload Completion Report F: 132. Completion Report - Upper Grande Ronde Culvert Replacement 03/15/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 3 instances of WE 184 Install Fish Passage Structure
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 05/01/2017
B 184 Limber Jim Mainstem culvert 01/12/2017
C 184 North Fork Limber Jim culvert 01/12/2017
D 184 North Fork West Chicken culvert 06/14/2017
E 119 Project/Contract Administration 05/01/2017
F 132 Completion Report - Upper Grande Ronde Culvert Replacement 05/01/2017
G 185 Quarterly Status Reports 05/01/2017