| Province | Subbasin | % |
|---|---|---|
| Basinwide | - | 100.00% |
| Previous: | Next: |
|---|---|
| 76914 REL 8: 1997-024-00 EXP AVIAN PREDATION ON JUVENILE SALMON 2021 |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Full Name | Organization | Write Permission | Contact Role | Work Phone | |
|---|---|---|---|---|---|
| Daniel Affonso | Bonneville Power Administration | Yes | Contracting Officer | dxaffonso@bpa.gov | (503) 230-5918 |
| Ken Collis | Real Time Research | Yes | Contract Manager | kencollis1234@gmail.com | (541) 719-1652 |
| Allen Evans | Real Time Research | No | Technical Contact | allen@realtimeresearch.com | (541) 719-1653 |
| Daniel Gambetta | Bonneville Power Administration | Yes | Env. Compliance Lead | dagambetta@bpa.gov | (503) 230-3493 |
| Kristen Jule | Bonneville Power Administration | Yes | F&W Approver | krjule@bpa.gov | (503) 230-3588 |
| Timothy Lawes | Oregon State University | Yes | Technical Contact | timothy.lawes@oregonstate.edu | (541) 737-5895 |
| Daniel Roby | Oregon State University | Yes | Supervisor | daniel.roby@oregonstate.edu | (541) 737-1955 |
| Gregory Smith | Bonneville Power Administration | Yes | COR | gmsmith@bpa.gov | (503) 230-5049 |
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Complete Environmental Compliance | A: 165. Obtain NEPA/ESA Clearance | 01/31/2023 | 01/31/2023 | |
| Produce accessible, error-checked datasets | B: 157. Assess the distribution and size of piscivorous waterbird colonies that may pose a threat to smolt survival in the Columbia River basin above Bonneville Dam | 01/31/2023 | 01/31/2023 | |
| Deliverable: An accessible, error-checked data set with metadata | C: 162. Determine the colony-specific and cumulative, system-wide impacts of colonial waterbirds on salmonid smolt survival in the Columbia River basin | 01/31/2023 | 01/31/2023 | |
| Produce accessible, error-checked datasets | D: 157. Collect smolt PIT tags at selected unmanaged piscivorous waterbird colonies in the Columbia River estuary | 10/01/2022 | 10/01/2022 | |
| Produce accessible, error-checked datasets | E: 157. Assess colony size of piscivorous waterbird colonies in the Columbia River estuary | 12/01/2022 | 12/01/2022 | |
| Complete website postings and professional presentations | F: 161. Website maintenance and professional presentations | 01/31/2023 | 01/31/2023 | |
| All administrative tasks fulfilled with timely quality products | G: 119. Project coordination and administration | 01/31/2023 | 01/31/2023 | |
| Annual Progress Report on Avian Predation Monitoring in the Lower Columbia River for CY 2022 | H: 132. Avian Predation Monitoring in the Lower Columbia River - 2022 Annual Report | 01/31/2023 | 01/31/2023 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened) |
|
| Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
| Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
| Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
| Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
| Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
| Wildlife |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Obtain NEPA/ESA Clearance | |||||||
| B | 157 | Assess the distribution and size of piscivorous waterbird colonies that may pose a threat to smolt survival in the Columbia River basin above Bonneville Dam | 01/11/2022 | ||||||
| C | 162 | Determine the colony-specific and cumulative, system-wide impacts of colonial waterbirds on salmonid smolt survival in the Columbia River basin | |||||||
| D | 157 | Collect smolt PIT tags at selected unmanaged piscivorous waterbird colonies in the Columbia River estuary | 01/11/2022 | ||||||
| E | 157 | Assess colony size of piscivorous waterbird colonies in the Columbia River estuary | 01/11/2022 | ||||||
| F | 161 | Website maintenance and professional presentations | |||||||
| G | 119 | Project coordination and administration | |||||||
| H | 132 | Avian Predation Monitoring in the Lower Columbia River - 2022 Annual Report | |||||||
| I | 185 | Periodic Status Reports for BPA |