Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 77111 REL 11: 2007-402-00 EXP SBT SNAKE RIVER SOCKEYE M&E/HABITAT
Project Number:
Title:
Snake River Sockeye Captive Propagation
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
77111 REL 11
Contract Title:
2007-402-00 EXP SBT SNAKE RIVER SOCKEYE M&E/HABITAT
Contract Continuation:
Previous: Next:
77111 REL 1: 2007-402-00 EXP SBT SNAKE RIVER SOCKEYE HABITAT
  • 77111 REL 20: 2007-402-00 EXP SBT SNAKE RIVER SOCKEYE M&E/HABITAT
Contract Status:
Closed
Contract Description:
Goal:  To assess habitat limitations as it pertains to Snake River sockeye salmon Oncorhynchus nerka preservation and recovery, to implement activities necessary to increase and\or reestablish O. nerka productivity in nursery areas in the historic range of Snake River sockeye salmon, and to investigate fish community dynamics in lake nursery areas, including interactions between resident and anadromous O. nerka in present or potential Sawtooth Valley production areas.  We will collaborate with the IDFG to determine release strategies, and assess fish performance from introduction into the lakes up through smolt migration. And provide input to the Technical Oversight Committee for annual strategies regarding the fate of returning adults.

FY19 Contract objectives include: 1) monitor limnological parameters of the Sawtooth Valley lakes to assess lake productivity; 2) monitor sockeye salmon smolt migration from the production of wild/natural adults in Pettit and Alturas lakes;  3) monitor the number of mature kokanee spawning in Fishhook Creek and estimate fry recruitment in Fishhook and Alturas Lake creeks; 4) conduct sockeye and kokanee salmon population surveys; 5) evaluate potential competition and predation between stocked juvenile sockeye salmon and a variety of fish species in Pettit, and Alturas lakes; and 6) assist IDFG with captive broodstock production activities and supply IDFG with requested RM&E and RPA/BiOp data.
Account Type(s):
Expense
Contract Start Date:
12/01/2018
Contract End Date:
11/30/2019
Current Contract Value:
$699,502
Expenditures:
$699,502

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Supervisor ccolter@sbtribes.com (208) 239-4553
Kendra Eaton Shoshone-Bannock Tribes Yes Technical Contact keaton@sbtribes.com (208) 478-4048
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Elsha Leavitt Shoshone-Bannock Tribes No Interested Party eleavitt@sbtribes.com (208) 478-3795
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Jenna Peterson Bonneville Power Administration No Interested Party jepeterson@bpa.gov (503) 230-3018
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Kurt Tardy Shoshone-Bannock Tribes Yes Contract Manager ktardy@sbtribes.com (208) 239-4562
Shannell Ward Shoshone-Bannock Tribes No Administrative Contact shannell.ward@sbtribes.com (208) 478-3821
Pam Waterhouse Shoshone-Bannock Tribes Yes Administrative Contact pwaterhouse@sbtribes.com (208) 478-3819
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Diana Yupe Shoshone-Bannock Tribes Yes Interested Party dyupe@sbtribes.com (208) 478-3790


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
NEPA compliance, NOAA and IDEQ permit reports submitted A: 165. NEPA clearance, NOAA/DEQ Permits 11/15/2019 11/15/2019
Snake River sockeye RPA/BiOp data submission to IDFG project leader B: 202. Snake River sockeye RPA/BiOp Data 02/28/2019 03/26/2019
Complete collection of all limnological variables C: 157. Complete data collection for all limnological variables 11/15/2019 11/15/2019
Evaluate sockeye salmon smolt migrations D: 157. Evaluate sockeye salmon smolt migration from Pettit and Alturas lakes 07/17/2019 07/15/2019
PIT Tag sockeye smolts E: 158. PIT Tag sockeye salmon smolts 06/12/2019 06/04/2019
Complete all adult O. nerka spawning and hydroacoustic surveys F: 157. Estimate O. nerka populations in Sawtooth Valley lakes and creeks 11/15/2019 10/22/2019
30% design, surveys, and BPA review G: 175. 30% weir design Pettit Lake creek 11/13/2019 11/13/2019
Completion of nutrient sample collections and processing H: 157. Historical Nutrient Evaluations - Nutrient Sample Collection 07/31/2019 07/16/2019
Produce scientifically defensible study I: 162. Historical Nutrient Evaluations - Data Analyses and Defensible Results 11/15/2019 11/15/2019
Monitor and download data from PIT tag arrays in Pettit and Alturas creeks. J: 157. Monitor PIT tag arrays for returning adult sockeye salmon 11/13/2019 10/11/2019
Complete all milestones K: 162. Provide recommendations on lake fertilization and fish stocking 11/13/2019 11/13/2019
Fertilization of selected lakes L: 44. Nutrient Enhancement 10/30/2019 10/15/2019
Attend and Participate in TOC meetings M: 191. Stanley Basin Sockeye Technical Oversight Committee Meetings 11/22/2019 09/10/2019
Completed Annual Report N: 132. Submit Progress Report for the period 1.01.2018 to 12.31.2018 10/01/2019 08/07/2019
Contract package (SOW, budget and property inventory) O: 119. Manage and Administer contract associated with SBT Snake River Sockeye Habitat Project 10/16/2019 10/16/2019
60% design, permitting, surveys, and BPA review Q: 175. 60%+ weir design for Pettit Lake Creek 11/13/2019 11/13/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 1 instance of WE 44 Enhance Nutrients in Water Bodies
  • 2 instances of WE 175 Produce Design
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 NEPA clearance, NOAA/DEQ Permits 12/01/2018
B 202 Snake River sockeye RPA/BiOp Data
C 157 Complete data collection for all limnological variables 12/01/2018
D 157 Evaluate sockeye salmon smolt migration from Pettit and Alturas lakes 10/25/2018
E 158 PIT Tag sockeye salmon smolts 10/25/2018
F 157 Estimate O. nerka populations in Sawtooth Valley lakes and creeks 10/25/2018
G 175 30% weir design Pettit Lake creek 05/03/2019
H 157 Historical Nutrient Evaluations - Nutrient Sample Collection 10/25/2018
I 162 Historical Nutrient Evaluations - Data Analyses and Defensible Results 12/01/2018
J 157 Monitor PIT tag arrays for returning adult sockeye salmon 10/25/2018
K 162 Provide recommendations on lake fertilization and fish stocking 12/01/2018
L 44 Nutrient Enhancement 10/25/2018
M 191 Stanley Basin Sockeye Technical Oversight Committee Meetings 12/01/2018
N 132 Submit Progress Report for the period 1.01.2018 to 12.31.2018 12/01/2018
O 119 Manage and Administer contract associated with SBT Snake River Sockeye Habitat Project 12/01/2018
P 185 Periodic Status Reports for BPA 12/01/2018
Q 175 60%+ weir design for Pettit Lake Creek 05/03/2019