| Province | Subbasin | % |
|---|---|---|
| Columbia Plateau | Walla Walla | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| All administrative tasks fulfilled with timely quality products | B: 119. Admin oversight for Exp Activities | 11/30/2018 | 10/31/2018 | |
| Environmental Compliance complete | C: 165. Environmental Compliance Documentation for all Exp actions | 10/31/2018 | 11/29/2018 | |
| Surface Water Data collected for recharge projects and water monitoring | D: 157. Collect Surface Water Data for Recharge project and Water monitoring | 10/31/2018 | 10/31/2018 | |
| Groundwater Data collected for recharge projects and water monitoring | E: 157. Collect Groundwater Data for Recharge project and Water monitoring | 10/31/2018 | 10/31/2018 | |
| Produce accessible, error-checked datasets | F: 157. Collect Water Temperature Data for Recharge project and Water monitoring | 10/31/2018 | 10/31/2018 | |
| Updated WWBWC Database | G: 160. Maintain Surface Water Database for Recharge project and Water monitoring | 10/31/2018 | 10/31/2018 | |
| Maintain Groundwater Database | H: 160. Maintain Groundwater Database for Recharge project and Water monitoring | 10/31/2018 | 10/31/2018 | |
| Maintain water temperature database | I: 160. Maintain Water Temperature Database for Recharge project and Water monitoring | 10/31/2018 | 10/31/2018 | |
| Results on the success of the Recharge Project, On-farm Efficiency, and Water Management | J: 162. Analyze Surface Water Data for Recharge Project | 10/31/2018 | 10/31/2018 | |
| Results on the success of the Recharge Project, On-farm Efficiency, and Water Management | K: 162. Analyze Groundwater Data for Recharge Project | 10/31/2018 | 10/31/2018 | |
| Results on the success of the Recharge Project, On-farm Efficiency, and Water Management | L: 162. Analyze Water Temperature Data for Recharge Project | 10/31/2018 | 10/31/2018 | |
| Annual Progress Report | M: 132. Annual Progress Report (11-1-16 to 10-31-17) | 03/15/2018 | 03/30/2018 | |
| Youth and Adult Presentations | N: 99. Youth and adult presentations | 10/31/2018 | 08/08/2018 | |
| Education and Outreach | O: 99. Irrigation Efficiency and Aquifer Recharge project | 10/31/2018 | 10/31/2018 | |
| White Ditch Pipe Design | W: 175. White Ditch Pipe Design | 10/31/2018 | 10/31/2018 | |
| Couse Creek Fish Passage Design | X: 175. Couse Creek Assessment & Fish Passage Final Design | 11/30/2018 | 11/29/2018 | |
| North Sunquist Aquifer Recharge Site Construction | Z: 205. North Sunquist Aquifer Recharge Site Construction | 10/31/2018 | 10/31/2018 | |
| Locust Road Sprinkler Efficiency Phase 3 | AA: 203. Locust Road Sprinkler Efficiency Phase 3 | 10/31/2018 | 10/18/2018 | |
| Ringer Road Aquifer Recharge Site Constructed | AB: 205. Ringer Road Aquifer Recharge Site Construction | 10/31/2018 | 10/31/2018 | |
| WWRID Flow Telemetry | AC: 148. WWRID Flow Telemetry | 10/31/2018 | 10/31/2018 | |
| Eastside Recharge Delivery ASR/SAR Design | AG: 175. Eastside Recharge Delivery ASR/SAR Design | 10/31/2018 | ||
| Milton-Freewater ASR Design | AH: 175. Milton-Freewater ASR Design | 10/31/2018 | 10/31/2018 | |
| On Farm ASR Water Exchange Design Alternatives | AI: 175. On Farm ASR Water Exchange Design Alternatives | 10/31/2018 | 10/31/2018 | |
| Lampson Side Channel Entrance Concept Design | AJ: 175. Lampson Side Channel Entrance Concept Design | 10/31/2018 | 10/31/2018 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
| Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
| Trout, Bull (S. confluentus) (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | 11/01/2017 | ||||||
| B | 119 | Admin oversight for Exp Activities | 11/01/2017 | ||||||
| C | 165 | Environmental Compliance Documentation for all Exp actions | 11/01/2017 | ||||||
| D | 157 | Collect Surface Water Data for Recharge project and Water monitoring | 11/01/2017 | ||||||
| E | 157 | Collect Groundwater Data for Recharge project and Water monitoring | 11/01/2017 | ||||||
| F | 157 | Collect Water Temperature Data for Recharge project and Water monitoring | 11/01/2017 | ||||||
| G | 160 | Maintain Surface Water Database for Recharge project and Water monitoring | 11/01/2017 | ||||||
| H | 160 | Maintain Groundwater Database for Recharge project and Water monitoring | 11/01/2017 | ||||||
| I | 160 | Maintain Water Temperature Database for Recharge project and Water monitoring | 11/01/2017 | ||||||
| J | 162 | Analyze Surface Water Data for Recharge Project | 11/01/2017 | ||||||
| K | 162 | Analyze Groundwater Data for Recharge Project | 11/01/2017 | ||||||
| L | 162 | Analyze Water Temperature Data for Recharge Project | 11/01/2017 | ||||||
| M | 132 | Annual Progress Report (11-1-16 to 10-31-17) | 11/01/2017 | ||||||
| N | 99 | Youth and adult presentations | 11/01/2017 | ||||||
| O | 99 | Irrigation Efficiency and Aquifer Recharge project | 11/01/2017 | ||||||
| P | 175 | CANCEL this WE for CCR 39894: Ringer Road Aquifer Recharge Designs | |||||||
| Q | 175 | CANCEL this WE for CCR 39894: Mud Springs Aquifer Recharge Designs | |||||||
| R | 175 | CANCEL this WE for CCR 39894: North Locust Read Recharge Designs | |||||||
| S | 175 | CANCEL this WE for CCR 39894: Eastside Recharge Delivery ASR/SAR Design | |||||||
| T | 175 | CANCEL this WE for CCR 39894: Milton-Freewater ASR Design | |||||||
| U | 175 | CANCEL this WE for CCR 39894: On Farm ASR Water Exchange Design Atlernatives | |||||||
| V | 175 | CANCEL this WE for CCR 39894: WWRID Small Leterals/Ditch Piping Design - Pleasantview Ditch 1 | |||||||
| W | 175 | White Ditch Pipe Design | 11/01/2017 | ||||||
| X | 175 | Couse Creek Assessment & Fish Passage Final Design | 03/15/2018 | ||||||
| Y | 175 | CANCEL this WE for CCR 39894: Fruitvale Bulges Design | |||||||
| Z | 205 | North Sunquist Aquifer Recharge Site Construction | 03/15/2018 | ||||||
| AA | 203 | Locust Road Sprinkler Efficiency Phase 3 | 07/18/2018 | ||||||
| AB | 205 | Ringer Road Aquifer Recharge Site Construction | 07/18/2018 | ||||||
| AC | 148 | WWRID Flow Telemetry | 07/18/2018 | ||||||
| AD | 115 | CANCEL this WE for CCR 39894: White Reservoir Assessment | |||||||
| AE | 148 | CANCEL this WE for CCR 39894: East Mud Creek Phase 1 - Headgates and Measuring Devices | |||||||
| AF | 203 | CANCEL this WE for CCR 39894: East Mud Creek Phase 1 - Piping | |||||||
| AG | 175 | Eastside Recharge Delivery ASR/SAR Design | 11/01/2017 | ||||||
| AH | 175 | Milton-Freewater ASR Design | 11/01/2017 | ||||||
| AI | 175 | On Farm ASR Water Exchange Design Alternatives | 11/01/2017 | ||||||
| AJ | 175 | Lampson Side Channel Entrance Concept Design | 11/01/2017 |