Contract 78136: 2000-027-00 EXP MALHEUR RIVER WILDLIFE MITIGATION BPT
Project Number:
Title:
Malheur River Wildlife Mitigation
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Middle Snake Malheur 100.00%
Contract Number:
78136
Contract Title:
2000-027-00 EXP MALHEUR RIVER WILDLIFE MITIGATION BPT
Contract Continuation:
Previous: Next:
74624: 2000-027-00 EXP MALHEUR RIVER WILDLIFE MITIGATION
  • 81111: 2000-027-00 EXP MALHEUR RIVER WILDLIFE MITIGATION
Contract Status:
Closed
Contract Description:
The Malheur River Wildlife Mitigation Project was purchased in November 2000 to compensate, in part, for the loss of fish and wildlife resources in the Columbia and Snake River Basins.  The 31,781-acre Project is located eleven miles east of Juntura, Oregon and is adjacent to the Malheur River.  The Project includes 6,385 deeded acres owned by the Burns Paiute Tribe, 4,154 acres leased from the Department of State Lands, and 21,242 acres leased from the BLM.  The Project is comprised of meadow, wetland, and shrub-steppe habitats and stretches for seven miles along the Malheur River.

In 2018, this contract will allow the Burns Paiute Tribe in the following management activities: complying with cultural resource and ESA requirements, improving and maintaining multiple vegetation communities through seeding and planting projects, identifying and controlling noxious weeds, re-establishing a riparian corridor, providing access, and education/coordination with tribal, government and general public parties.
Account Type(s):
Expense
Contract Start Date:
01/01/2018
Contract End Date:
12/31/2018
Current Contract Value:
$362,709
Expenditures:
$362,709

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Cultural Resource clearance complete A: 165. Complete Environmental Compliance Requirements & Tribal/Cultural Surveys 12/31/2018 12/21/2018
Install off-stream water source in South-side upland area. EC required. B: 34. Explore spring sites for installation off-stream water sources in upland areas 10/31/2018 09/28/2018
Bunkhouse Renovated C: 186. Renovate bunkhouse 12/31/2018 12/21/2018
Update roof on barn D: 186. Update roof on barn 07/31/2018 03/30/2018
Work on diversion dam structure E: 186. Work on diversion dam structure 11/30/2018 12/14/2018
Improved roads F: 38. Improve roads on mitigation site 12/31/2018 10/30/2018
Maintain Wet Meadow Irrigation System G: 198. Maintain Wet Meadow Irrigation 12/31/2018 10/15/2018
Plant seed in alfalfa field H: 47. Seed alfalfa field 12/31/2018 03/19/2018
Fence Maintained I: 186. Maintain and Build Fence 12/31/2018 10/30/2018
Weed Control J: 198. Cost share: Weed Control 12/31/2018 12/21/2018
Haying Operations K: 198. Cost share: Haying Operations 12/31/2018 09/30/2018
Graze BLM, State and Meadows. L: 199. Cost share: Graze BLM, State, and Meadows 12/31/2018 08/30/2018
Conservation Reserve Enhancement Program Maintenance M: 198. Cost share: Conservation Reserve Enhancement Program Maintenance 12/31/2018 09/28/2018
Plant herbaceous plants and trees N: 47. Cost share: Plant herbaceous plants and trees for pollinator and wildlife habitat 12/31/2018 12/21/2018
Juniper removed O: 199. Cost share: Juniper eradication - NRCS SGI contract 12/31/2018 10/17/2018
Sage Grouse study P: 158. Cost share: Sage Grouse Study 12/31/2018 12/21/2018
Data Collected and entered Q: 157. Conduct Project Surveys 12/31/2018 12/21/2018
Access controlled R: 188. Control Access 12/31/2018 12/21/2018
Community education and information S: 99. Public Education and Information 12/31/2018 12/21/2018
Tribal education complete T: 99. Tribal Community Education 12/31/2018 12/21/2018
Project administration U: 119. Project Administration & Assist Fisheries department 12/31/2018 12/21/2018
Completed Annual Report X: 132. Submit Annual Report for 1/1/2017 to 12/31/2017 05/15/2018 03/30/2018
Trench and install waterlines for bunkhouse Y: 186. Waterlines for Bunkhouse 12/31/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 4 instances of WE 198 Maintain Vegetation
  • 2 instances of WE 199 Remove Vegetation
  • 5 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete Environmental Compliance Requirements & Tribal/Cultural Surveys 01/01/2018
B 34 Explore spring sites for installation off-stream water sources in upland areas 09/19/2018
C 186 Renovate bunkhouse 05/08/2018
D 186 Update roof on barn 05/08/2018
E 186 Work on diversion dam structure 01/01/2018
F 38 Improve roads on mitigation site 09/19/2018
G 198 Maintain Wet Meadow Irrigation 08/17/2018
H 47 Seed alfalfa field 01/01/2018
I 186 Maintain and Build Fence 06/15/2018
J 198 Cost share: Weed Control 06/15/2018
K 198 Cost share: Haying Operations 01/01/2018
L 199 Cost share: Graze BLM, State, and Meadows 01/01/2018
M 198 Cost share: Conservation Reserve Enhancement Program Maintenance 01/01/2018
N 47 Cost share: Plant herbaceous plants and trees for pollinator and wildlife habitat 06/15/2018
O 199 Cost share: Juniper eradication - NRCS SGI contract 09/19/2018
P 158 Cost share: Sage Grouse Study 01/01/2018
Q 157 Conduct Project Surveys 01/01/2018
R 188 Control Access 01/01/2018
S 99 Public Education and Information 01/01/2018
T 99 Tribal Community Education 01/01/2018
U 119 Project Administration & Assist Fisheries department 01/01/2018
V 185 Periodic Status Reports for BPA 01/01/2018
W 132 Prepare data for draft annual report for period 1/2018 to 12/2018 01/01/2018
X 132 Submit Annual Report for 1/1/2017 to 12/31/2017 01/01/2018
Y 186 Waterlines for Bunkhouse 01/01/2018