SOW Report
Contract 83368: 2010-004-00 EXP CREST ESTUARY HABITAT RESTORATION (USFWS-CREST)
Project Number:
Title:
CREST Estuary Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia River Estuary Columbia Estuary 100.00%
Contract Number:
83368
Contract Title:
2010-004-00 EXP CREST ESTUARY HABITAT RESTORATION (USFWS-CREST)
Contract Continuation:
Previous: Next:
80692: 2010-004-00 EXP CREST ESTUARY HABITAT RESTORATION (USFWS-CREST)
  • 86381: 2010-004-00 EXP CREST ESTUARY HABITAT RESTORATION (USFWS-CREST)
Contract Status:
Closed
Contract Description:
** This contract serves as a pass-through of USFWS funds to CREST.  The funding is not directly from BPA, but from USFWS in order to utilize USFWS wetland restoration funding.  Therefore, the SOW and LIB are not fully developed since the subcontractors have not been determined and project details have not been completed.  BPA is not responsible for the environmental compliance for these two projects under this contract.**


CREST proposes to continue to implement estuary habitat restoration projects during this contract period using funds allotted to CREST from the US Fish and Wildlife Service (USFWS) through an Intergovernmental Agreement between the USFWS and BPA.

The funding CREST receives through this individual contract is an extension of a previous contract. The remaining funding for this contract will be used for the John Day #11 Tidal Habitat Restoration. The John Day #11 project is currently in design, engineering, and permitting and will move to construction in 2020.

Deliverables for this contract include:
1) Implementing on-the-ground estuarine restoration at the proposed John Day #11 site

The proposed project described above will provide immediate access to estuarine habitats for juvenile salmonids. CREST has secured, and will continue to pursue cost share for project engineering and construction during this contract period from the National Oceanic and Atmospheric Administration, Oregon Watershed Enhancement Board, and the United States Fish and Wildlife Service.

Within this contract, major work elements are directly related to implementation of a previously designed project.

The John Day #11 project has undergone a cost/SBU preliminary review and preliminary scoring by ERTG. It is possible that these project will go through the ERTG review again, if recommended by BPA.
Account Type(s):
Expense
Contract Start Date:
11/01/2019
Contract End Date:
10/31/2020
Current Contract Value:
$55,000
Expenditures:
$55,000

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Grant
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Obtain and provide BPA with Environmental Compliance Documentation B: 165. Produce EC for projects 06/01/2020 06/01/2020
CREST Administrative Oversight of BPA Contract C: 119. Manage and Administer Projects 10/31/2020 10/31/2020
Remove fish passage barriers D: 85. JOHN DAY #11-- Fish passage barrier removal 10/31/2020 09/15/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
Cutthroat Trout, Coastal (Oncorhynchus clarkii clarkii) - All Anadromous Populations
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Produce EC for projects
C 119 Manage and Administer Projects
D 85 JOHN DAY #11-- Fish passage barrier removal 06/03/2020
E 132 *NO ANNUAL REPORT REQUIRED*