Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 86381: 2010-004-00 EXP CREST ESTUARY HABITAT RESTORATION (USFWS-CREST)
Project Number:
Title:
CREST Estuary Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia River Estuary Columbia Estuary 100.00%
Contract Number:
86381
Contract Title:
2010-004-00 EXP CREST ESTUARY HABITAT RESTORATION (USFWS-CREST)
Contract Continuation:
Previous: Next:
83368: 2010-004-00 EXP CREST ESTUARY HABITAT RESTORATION (USFWS-CREST)
Contract Status:
Closed
Contract Description:
** This contract serves as a pass-through of USFWS funds to CREST.  The funding is not directly from BPA, but from USFWS in order to utilize USFWS wetland restoration funding.  Therefore, the SOW and LIB are not fully developed since the subcontractors have not been determined and project details have not been completed.  BPA is not responsible for the environmental compliance for these two projects under this contract.**

CREST proposes to continue to implement estuary habitat restoration projects during this contract period using funds allotted to CREST from the US Fish and Wildlife Service (USFWS) through an Intergovernmental Agreement between the USFWS and BPA.

The funding CREST receives through this individual contract will be used for one project site: the Upper Lewis and Clark Restoration project. The Upper Lewis and Clark project is currently at a 30% design phase. Designs will be further developed to a 100% design phase during this contract period.

Deliverables for this contract include: Completing full, 100% designs for the Upper Lewis and Clark Restoration site

The project described above provide immediate access to estuarine habitats for juvenile salmonids. CREST has secured, and will continue to pursue cost share for project engineering and construction during this contract period from the National Park Service, Oregon Watershed Enhancement Board, United States Fish and Wildlife Service, as well as the Lower Columbia River Estuary Partnership.

Within this contract, major work elements are directly related to implementation of a previously designed project, and on engineering and permitting for a future project.

The project CREST is proposing during this contract have undergone a cost/SBU preliminary review and preliminary scoring by ERTG. It is possible that these project will go through the ERTG review again, if recommended by BPA.
Account Type(s):
Expense
Contract Start Date:
11/01/2020
Contract End Date:
10/31/2021
Current Contract Value:
$45,000
Expenditures:
$45,000

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Grant
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Obtain and provide BPA with Environmental Compliance Documentation B: 165. Produce EC for projects 10/31/2021 10/31/2021
CREST Administrative Oversight of BPA Contract C: 119. Manage and Administer Projects 10/31/2021 10/31/2021
Upper Lewis and Clark- Designs D: 175. UPPER LEWIS & CLARK-- Full Design 10/31/2021 10/31/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 175 Produce Design
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 1 instance of WE 175 Produce Design
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 175 Produce Design
Cutthroat Trout, Coastal (Oncorhynchus clarkii clarkii) - All Anadromous Populations
  • 1 instance of WE 175 Produce Design
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Produce EC for projects
C 119 Manage and Administer Projects
D 175 UPPER LEWIS & CLARK-- Full Design 09/25/2020
E 132 *NO ANNUAL REPORT REQUIRED*