Obtain all necessary permits. Work with BPA EC lead, Invasive species management and prevention. |
B: 165. Environmental Compliance |
|
04/30/2026 |
|
Effective implementation management and timely contract administration |
C: 119. Administrative Oversight of the Chief Joseph Hatchery M&E Program |
|
04/30/2026 |
|
Study plan and sample design for Okanogan summer Chinook pilot egg to fry study |
D: 122. Coordination and Development of Okanogan Basin Summer Chinook Egg-to-Fry Survival Study |
|
08/29/2025 |
|
Produce accessible, error-checked datasets |
E: 157. Assessing Summer/Fall Chinook Outmigrants with a Rotary Screw Trap on the Okanogan River |
|
02/28/2026 |
|
Present juvenile outmigration results at the APR and update status and trends in annual report. |
F: 162. Analyze Juvenile Chinook Outmigration |
|
04/30/2026 |
|
Upload PIT tag files to PTAGIS |
G: 158. Collect and PIT Tag Natural-Origin Juvenile Summer Chinook Salmon |
|
10/03/2025 |
|
Update key assumptions in ISIT, presentation at APR and section of annual report |
H: 162. Estimate Spring and Summer Chinook Migration and Survival Using Pit Tags |
|
04/30/2026 |
|
Produce accessible, error-checked datasets |
I: 157. Conduct Spring Chinook Spawning Ground Surveys in the Okanogan Tributaries |
|
04/30/2026 |
|
Produce accessible, error-checked datasets |
J: 157. Okanogan River Temporary Weir Operations |
|
04/30/2026 |
|
Present results at the APR and generate a section of the annual report for weir monitoring |
K: 162. Analyze Results of Weir Monitoring |
|
03/31/2026 |
|
Produce accessible, error-checked datasets |
L: 157. Monitor Natural Juvenile Spring Chinook Productivity |
|
04/30/2026 |
|
Produce accessible, error-checked datasets and section of the Annual Report |
M: 162. Analyze Juvenile Spring Chinook Productivity |
|
04/30/2026 |
|
Produce accessible, error-checked datasets |
N: 157. Conduct Summer/Fall Chinook Redd Surveys on the Okanogan and Similkameen Rivers |
|
04/30/2026 |
|
Produce accessible, error-checked datasets |
O: 157. Conduct Summer/Fall Chinook Carcass Collection on the Okanogan and Similkameen Rivers |
|
03/31/2026 |
|
Spawning ground survey summary and analysis for APR presentations, ISIT and the annual report |
P: 162. Analyze Data for Summer/Fall Chinook Spawning Ground Surveys |
|
04/30/2026 |
|
Produce accessible, error-checked datasets |
Q: 157. Collect Water for eDNA |
|
04/30/2026 |
|
APR presentation and section of the annual report |
R: 162. Analysis of Water Samples for eDNA |
|
04/30/2026 |
|
Produce accessible, error-checked datasets |
S: 157. Collect Tissue Samples for PBT |
|
04/30/2026 |
|
Produce accessible, error-checked datasets |
T: 157. Collect Scales from CJH Summer/Fall Broodstock |
|
03/31/2026 |
|
Hatchery APR presentation and a section of the annual report |
U: 162. Determine Age Structure of Integrated Broodstock |
|
04/30/2026 |
|
Produce accessible, error-checked datasets |
V: 157. Okanogan Pilot Egg to Fry Study |
|
04/30/2026 |
|
Deliverable: An accessible, error-checked data set with metadata |
W: 162. Analyze Results of Okanogan Egg to Fry Pilot Study |
|
04/30/2026 |
|
Produce accessible, error-checked datasets |
X: 157. Process Coded Wire Tag Snouts in a Lab |
|
04/30/2026 |
|
Produce accessible, error-checked datasets |
Y: 157. Estimate Tribal Harvest for Spring and Summer/Fall Chinook |
|
04/30/2026 |
|
Data summary and analysis input to ISIT, presented at APR and a section of the annual report |
Z: 162. Retrieve and Analyze CWT Information for Okanogan Summer/Fall Chinook |
|
04/30/2026 |
|
Maintenance and enhancement of the CJH M&E and Harvest applications and reporting tools with data storage backup |
AA: 160. Database and Module Maintenance and Enhancement |
|
04/30/2026 |
|
CJHP Annual Program Review Tool Updates and Maintenance |
AB: 162. Assimilate and Analyze ISIT Input Parameters |
|
04/30/2026 |
|
2026 Annual Program Review (APR) and section of the annual report |
AC: 161. Annual Program Review |
|
04/30/2026 |
|
Completed Progress (Annual) Report |
AD: 132. Submit 2023 Annual Progress Report- CJH Spring Chinook |
|
09/15/2025 |
|
Completed Progress (Annual) Report |
AE: 132. Submit 2024 Annual Progress Report- CJH Summer Chinook |
|
09/30/2025 |
|
Completed Progress (Annual) Report |
AF: 132. Submit 2024 Annual Progress Report- CJH Spring Chinook |
|
12/12/2025 |
|