Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84051 REL 50: 2023-001-00 EXP CTCR UPPER COLUMBIA HABITAT IMPROVEMENT PROJECT
Project Number:
Title:
Upper Columbia Habitat Improvement Project (UCHIP)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 33.30%
Okanogan 33.40%
Wenatchee 33.30%
Contract Number:
84051 REL 50
Contract Title:
2023-001-00 EXP CTCR UPPER COLUMBIA HABITAT IMPROVEMENT PROJECT
Contract Continuation:
Previous: Next:
84051 REL 24: 2023-001-00 EXP CCT METHOW RESTORATION
Contract Status:
Issued
Contract Description:
This contract is to conduct aquatic habitat improvement projects in the Okanogan Methow, Wenatchee, and Entiat Sub-basin.  Projects to be implemented will primarily emphasize benefits to ESA listed spring Chinook, summer steelhead, and bull trout and secondarily to other salmonids and Pacific lamprey.  Work will include regular attendance of coordination meetings with project sponsors and oversight groups to ensure that work is conducted consistent with established needs and in coordination with other existing restoration efforts.

Projects prioritization is based on the 2014 EDT model run for the Methow Sub-basin, the 2021 Regional Technical Team Biological Strategy and the Upper Columbia Salmon Recovery Boards prioritization.    

Work under this contract cycle will include:

•    Antoine Valley Ranch Revegetation
•    Salmon Creek RM 8: Design and Implementation
•    Omak Creek Large Wood: Design
•    Highway 20: Letter of Map Revision completion
•    Chewuch Ramsey (Hummingbird):   Design
•    Upper Chewuch LW and complexity:   Design
•    Little Wenatchee River floodplain restoration:   Design
•    White River (private) restoration:   Design

Additionally, CTCR will continue supporting public outreach and educate for local students and the general public about the importance of salmon recovery and habitat improvement in the Upper Columbia.

Cultural resource surveys as required under Section 106 of the NHPA, unless previously completed prior to this contract period, will be completed by the Colville Confederated Tribes Cultural Resource staff.
  
The contractor (CTCR), its designated agents, sub-consultants and project stakeholders will be available, responsive and will collaboratively address contract related issues during the term of the contract. Contract issues include but are not limited to technical, policy, regulatory, project management and associated elements related to the project. Successful execution of this contract is contingent on alignment of the preceding contract issues with the BPI and BPA contracting processes, project management plans, design review protocols (including but not limited to BPA RRT design review, and integration of input and comments from BPA).

CTCR Contract Manager and design consultants will cooperate, coordinate, collaborate, and maintain effective communication with BPA PM/COR, EC Lead, and BPA ETS, during the entire length of this design contract. CTCR and its subcontractors will address BPA comments and concerns, and the two entities will arrive at a mutual beneficial consensus.  
Account Type(s):
Expense
Contract Start Date:
10/01/2025
Contract End Date:
09/30/2026
Current Contract Value:
$4,117,000
Expenditures:
$278,237

* Expenditures data includes accruals and are based on data through 31-Oct-2025.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Accrual Category:
Habitat Improvement
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Project Management 09/30/2026
Coordinate with EC lead C: 165. Produce Compliance Documentation 09/30/2026
Complete coordination D: 191. Subbasin Coordination 09/30/2026
Data added to UCSRB Prioritization model E: 115. Upper Columbia Habitat Prioritization Support 09/30/2026
Provide final metrics F: 99. Upper Columbia education and outreach 09/30/2026
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish G: 114. Project Identification and Selection Process & Coordination w/BPA 09/30/2026
Submit final designs. H: 175. Upper Chewuch floodplain enhancement 09/30/2026
Upload Final Plans I: 175. Chewuch Ramsey (Hummingbird) 09/30/2026
Complete Pope Restoration Design J: 175. Pope Entiat River Restoration 06/01/2026
Little Wenatchee River Design Complete K: 175. Little Wenatchee River floodplain restoration 09/30/2026
White River 80% Design Complete L: 175. White River Restoration - Private land 09/30/2026
Upload final design M: 175. Salmon Creek RM8 Floodplain Design 09/01/2026
Uploaded design phases N: 175. Omak Creek Instream Complexity 09/30/2026
Letter of Map Revision submittal to FEMA O: 175. HWY 20 Letter of Map Revision following project construction 09/30/2026
Produce conceptual designs P: 175. On-call professional services 09/30/2026
Metrics Update Q: 47. Antoine Valley Ranch Revegetation 09/30/2026
Notify BPA of completion R: 40. Antoine Valley Ranch Fence Construction 09/30/2026
Project completion S: 29. Salmon Creek RM8 Construction 09/30/2026
Pope Entiat Construction Complete T: 29. Pope Entiat Construction 09/30/2026
Completed Progress (Annual) Report U: 132. UCHIP annual report 09/30/2026

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 7 instances of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 9 instances of WE 175 Produce Design
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 175 Produce Design
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project Management
B 185 Periodic Status Reports for BPA
C 165 Produce Compliance Documentation
D 191 Subbasin Coordination
E 115 Upper Columbia Habitat Prioritization Support
F 99 Upper Columbia education and outreach
G 114 Project Identification and Selection Process & Coordination w/BPA
H 175 Upper Chewuch floodplain enhancement
I 175 Chewuch Ramsey (Hummingbird)
J 175 Pope Entiat River Restoration
K 175 Little Wenatchee River floodplain restoration
L 175 White River Restoration - Private land
M 175 Salmon Creek RM8 Floodplain Design
N 175 Omak Creek Instream Complexity
O 175 HWY 20 Letter of Map Revision following project construction
P 175 On-call professional services
Q 47 Antoine Valley Ranch Revegetation
R 40 Antoine Valley Ranch Fence Construction
S 29 Salmon Creek RM8 Construction
T 29 Pope Entiat Construction
U 132 UCHIP annual report