Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84051 REL 65: 2003-023-00 EXP PIPE DESIGN_CHIEF JOE HATCHERY
Project Number:
Project Title:
Chief Joseph Hatchery Program
BPA PM:
Project Stage:
Implementation
Project Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
84051 REL 65
Contract Title:
2003-023-00 EXP PIPE DESIGN_CHIEF JOE HATCHERY
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Issued
Contract Description:
This project is for the Engineering Design and Specifications for the Chief Joseph Hatchery Relief Tunnel Water Source, or Third Water Source (3WS). The relief tunnel will deliver water from the Chief Joseph Dam to the hatchery headbox and adult holding ponds. This design builds off and updates a 2004 design completed by Tetra Tech. The design contract will be held by the Colville Tribe and the design work will be subbed out.
Account Type(s):
Expense
Contract Start Date:
06/01/2026
Contract End Date:
05/31/2027
Current Contract Value:
$512,436
Expenditures:

* Expenditures data includes accruals and are based on data through 31-May-2026.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Accrual category:
Planning & Design
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
James Barron Bonneville Power Administration Yes COR jmbarron@bpa.gov (503) 230-5706
Rachel Green Bonneville Power Administration Yes CO Assistant rjgreen@bpa.gov (503) 230-3882
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Matt McDaniel Colville Confederated Tribes Yes Contract Manager matthew.mcdaniel.fnw@colvilletribes.com (509) 422-4590
JESSICA POWER Bonneville Power Administration Yes Contracting Officer jdpower@bpa.gov (503) 230-4023
Andrew Traylor Bonneville Power Administration Yes Supervisor awtraylor@bpa.gov (503) 230-3268
Kirk Truscott Colville Confederated Tribes Yes Supervisor kirk.truscott@colvilletribes.com (509) 978-8031


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Final Design of Chief Joeseph Hatchery Water Supply Relief Tunnel B: 175. Produce design documents (including 100%/IFC) for the relief tunnel water supply pipeline at Chief Joseph Hatchery. 01/13/2027

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 175 Produce Design
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 175 Produce design documents (including 100%/IFC) for the relief tunnel water supply pipeline at Chief Joseph Hatchery.