Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84068 REL 35: 1995-057-02 EXP SOUTHERN IDAHO WILDLIFE MITIGATION
Project Number:
Project Title:
Shoshone-Bannock Wildlife Mitigation Projects
BPA PM:
Project Stage:
Implementation
Project Area:
Province Subbasin %
Upper Snake Snake Upper 100.00%
Contract Number:
84068 REL 35
Contract Title:
1995-057-02 EXP SOUTHERN IDAHO WILDLIFE MITIGATION
Contract Continuation:
Previous: Next:
84068 REL 24: 1995-057-02 EXP SOUTHERN IDAHO WILDLIFE MITIGATION
Contract Status:
Issued
Contract Description:
The Southern Idaho Wildlife Mitigation Program (SIWM) was created to to mitigate for habitat losses in Southern Idaho caused by hydropower development in the Middle and Upper Snake Provinces. In the Middle Snake Province identified habitat losses include Anderson Ranch (9,619 HU), and Black Canyon (2,170 HU). In the Upper Snake Province habitat losses were identified at 37,070 HU for the Palisades Dam (Sather-Blair and Preston 1985) and 10,503 HU for the Minidoka Dam (Martin and Meuleman 1989). The program was created in 1996 with the formation of a working group composed of the Idaho Department of Fish and Game (IDF&G), and Shoshone-Bannock Tribes (SBT). The Shoshone-Paiute Tribes joined the program in 2002.

(The NW Power and Conservation recognized Deadwood (7,413 HU) (Martin and Ablin-Stone 1986) as part of its Fish and Wildlife Program wildlife losses in Southern Idaho.  BPA does not recognize this dam's losses as appropriate for BPA mitigation because BPA has determined the facility does not have any power purposes assigned to it under the Federal Columbia Power System - it is an irrigation only facility according to BPA. This is noted to ensure that while work under this contract will directly result in ensuring BPA continues to receive credit for wildlife mitigation for existing properties currently protected under the program and new properties scheduled to be secured in 2011, the HU's secured are not associated with Deadwood.)

Objectives:
The SIWM program was created to meet the objectives for wildlife mitigation outlined in the Fish and Wildlife Program (NPCC 2000), the Project addresses O&M on acquired properties through a Capital Budget within the Accords SIWM for benefit of wildlife and public access:

• Quantify wildlife losses caused by the construction and inundation of the Federal hydropower projects (Operational losses for these dams have not been fully determined.)
• Develop and implement habitat acquisition and enhancement projects to fully mitigate for identified losses.
• Coordinate mitigation activities throughout the basin and with fish mitigation and restoration efforts, specifically by coordinating habitat restoration and acquisition with aquatic habitats to promote connectivity of terrestrial and aquatic areas.
• Maintain existing and create habitat values
• Monitor and evaluate habitat responses to mitigation actions.
Account Type(s):
Expense
Contract Start Date:
05/01/2026
Contract End Date:
04/30/2027
Current Contract Value:
$596,058
Expenditures:

* Expenditures data includes accruals and are based on data through 30-Apr-2026.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Accrual category:
Habitat O&M
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes Yes Supervisor chad.colter@sbtribes.com (208) 239-4553
Lisa Dexter Bonneville Power Administration Yes Contracting Officer lldexter@bpa.gov (503) 230-3893
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Douglas Hevewah Shoshone-Bannock Tribes Yes Interested Party douglas.hevewah@sbtribes.com (208) 844-1340
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Hunter Osborne Shoshone-Bannock Tribes Yes Contract Manager Hunter.Osborne@sbtribes.com (208) 239-4564
JESSICA POWER Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Virginia Preiss Bonneville Power Administration Yes COR vdpreiss@bpa.gov (503) 230-3619
Pam Waterhouse Shoshone-Bannock Tribes No Administrative Contact pamela.waterhouse@sbtribes.com (208) 478-3819
Jacee Weed Shoshone-Bannock Tribes Yes Interested Party jacee.weed@sbtribes.com (208) 239-4551


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Administration of BPA contracts 04/30/2027
Complete environmental compliance for work begins C: 165. Satisfy environmental compliance requirements 04/30/2027
Maintain vegetation on Bannock Creek, Legacy Springs, and Lavaside D: 198. Maintain vegetation on all project aquired lands 03/31/2027
Maintain infrastructure E: 186. Maintain program infrastructure 04/30/2027
Remove undesirable vegetation F: 199. Monitor and control Russian Olive Regrowth- Bannock Creek and Legacy Springs 04/30/2027
Benefit/Income/Spending Report G: 194. Administer agricultural Lease- Legacy Springs 04/30/2027
Benefit/Income/Spending Report H: 194. Administer agricultural Lease- Lavaside 04/30/2027
Conduct pre-acquisition process I: 172. Conduct pre-acquisition activities 04/30/2027
Management Plan J: 193. Revise Management Plan 03/31/2027
Completed Progress (Annual) Report K: 132. Submit Progress Report for the period April 2024 to March 2025 07/01/2026
Completed Progress (Annual) Report L: 132. Submit Progress Report for the period April 2025 to March 2026 04/30/2027

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 193 Produce Land Management Plan
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Administration of BPA contracts
C 165 Satisfy environmental compliance requirements
D 198 Maintain vegetation on all project aquired lands 05/01/2026
E 186 Maintain program infrastructure 05/01/2026
F 199 Monitor and control Russian Olive Regrowth- Bannock Creek and Legacy Springs 05/01/2026
G 194 Administer agricultural Lease- Legacy Springs 05/01/2026
H 194 Administer agricultural Lease- Lavaside 05/01/2026
I 172 Conduct pre-acquisition activities
J 193 Revise Management Plan
K 132 Submit Progress Report for the period April 2024 to March 2025
L 132 Submit Progress Report for the period April 2025 to March 2026