Show new navigation
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84069 REL 51: 2007-246-00 EXP RESTORATION OF BULL TROUT PASS
Project Number:
Title:
Restoration of Bull Trout Passage at Albeni Falls Dam
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
84069 REL 51
Contract Title:
2007-246-00 EXP RESTORATION OF BULL TROUT PASS
Contract Continuation:
Previous: Next:
84069 REL 42: 2007-246-00 EXP RESTORATION OF BULL TROUT PASS
Contract Status:
Issued
Contract Description:

Project 200724600 was initiated in 2007 in response to recommendations of Geist et al. (2004) and Scholz et al. (2005a). Albeni Falls Dam interferes with natural migration of adfluvial Bull Trout in the Lake Pend Oreille/Pend Oreille River system and has contributed to the extirpation of populations originating downstream of the dam. Genetically isolated populations originating upstream routinely pass the dam on their own volition or through entrainment and cannot return to natal tributaries to spawn or access thermal refuge and forage in Lake Pend Oreille. Mortality rates of migratory Bull Trout and Westslope Cutthroat Trout blocked from passing Albeni Falls Dam are extremely high due to summer water temperatures exceeding 24 °C. Reconnecting the fragmented Pend Oreille/Clark Fork system is thought to be the best way to restore local Bull Trout populations and has been required at 5 out of 6 existing mainstem dams in the U.S. through FERC license negotiations. Albeni Falls Dam is the only Federally owned and operated dam in the system and the USACE was required by the U.S. Fish and Wildlife Service to study the feasibility of restoring passage by October 1, 2004. Albeni Falls Dam upstream fish passage is the single most important conservation action that can be undertaken to recover and conserve native migratory salmonids to the lower Pend Oreille watershed.

The goals of this project are to: 1) provide temporary upstream passage for Bull Trout at Albeni Falls Dam; 2) investigate long-term fish passage solutions at Albeni Falls Dam; and 3) fill data gaps identified through this and related projects on Bull Trout and Westslope Cutthroat Trout associated with mainstem habitat connectivity in the Pend Oreille/ Clark Fork system. Our focuses since the last categorical review in 2012 were:

•Improving safe and timely passage at AFD with a temporary upstream trap.

•Studying the feasibility of improving the attractiveness of fish trap and ladder entrances with the introduction of: 1) natal stream water; 2) conspecific pheromones; and 3) cold water.

•Collaborating with the Corps and Bonneville Power Administration (BPA) to finalize studies related to the feasibility of restoring passage for subadult and adult Bull Trout at AFD.

Trapping at the dam was discontinued in 2020, as no fish had been collected. Tests of attractants such as pheromones, natal stream water, and cold water temperatures were successful at attracting Bull Trout in a laboratory setting, however, field trials failed to improve trap effectiveness. The project transitioned to the management strategy of capturing Bull Trout only by boat electrofishing and transporting them above the dam with minimal tagging effort during 2021-2023. We have continued to collaborate with USACE on permanent fish passage design and implementation which will continue during this performance period.

Throughout the historic range of Westslope Cutthroat Trout, few of the remaining stocks have been genetically classified on the basis of chromosome counts, biochemical characteristics, or molecular genetic information (USFWS 2000).  Although Westslope Cutthroat Trout stocks with varying degrees of genetic purity are known to occur across the subspecies' range, there is currently little definitive information on the genetic characteristics of most stocks (U.S. Fish and Wildlife Service 1999).  The genetic cataloging portion of this project will investigate the genetic characteristics and degree of genetic purity of Westslope Cutthroat Trout in the upper Pend Oreille Subbasin and provide a means to identify fish of unknown origin to a most-probable region and natal tributary.  These results will greatly improve the probability of Westslope Cutthroat Trout passage at Albeni Falls Dam in the future.

Although our previous work has focused on Bull Trout and Westslope Cutthroat Trout, other native salmonids may also be negatively affected by dams that were constructed without fish passage facilities. Among those species, Mountain Whitefish (Prosopium williamsoni) may be of particular concern as anecdotal reports suggest that their numbers may be declining both within the LPO/PR system and across much of their native range. In 2018-19 KNRD and EWU crews captured a total of 255 (2018 (n=155), 2019 (n=100)) Mountain Whitefish below AFD, in more recent years 2020-2024 (2020 (n=20), 2021(n=28), 2022 (n=21), 2023 (n=11), 2024(n=27)) both crews have captured 107. Showing a steady decline in numbers. KRND and EWU plan on a preliminary evaluation of Mountain Whitefish in the Priest and Pend Oreille River.

We will compile data from the primary literature, the gray literature, and from direct conversations with personnel from all agencies that might be documenting the status of Mountain Whitefish populations. To date, genetic and ecological studies on Mountain Whitefish have been limited (Dunham et al. 2022). Our initial summary of the available data will allow us to better determine the need for future studies focused on the genetic and ecological status of this species.
Account Type(s):
Expense
Contract Start Date:
05/01/2025
Contract End Date:
04/30/2027
Current Contract Value:
$1,366,541
Expenditures:

* Expenditures data includes accruals and are based on data through 31-Mar-2025.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Amber Allman Pacific Northwest National Laboratory No Technical Contact amber.allman@pnnl.gov (509) 375-2039
Brian Bellgraph Pacific Northwest National Laboratory Yes Technical Contact brian.bellgraph@pnnl.gov (509) 371-7185
Jason Connor Kalispel Tribe Yes Technical Contact jconnor@knrd.org (509) 447-7285
Thomas Delorenzo Bonneville Power Administration Yes Env. Compliance Lead tdelorenzo@bpa.gov (503) 230-4419
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Joe Maroney Kalispel Tribe Yes Supervisor jmaroney@knrd.org (509) 447-7272
Jason Olson Kalispel Tribe Yes Technical Contact jolson@knrd.org (509) 447-7290
Raymond Ostlie Kalispel Tribe Yes Contract Manager Rostlie@kalispeltribe.com (509) 447-7243
Jessica Power Bonneville Power Administration Yes CO Assistant jdpower@bpa.gov (503) 230-4023
Elizabeth Santana Bonneville Power Administration Yes COR easantana@bpa.gov (503) 230-3560
Jolene Seymour Kalispel Tribe Yes Administrative Contact jseymour@kalispeltribe.com (509) 445-1147
John Stephenson Pacific Northwest National Laboratory No Interested Party john.stephenson@pnnl.gov (509) 371-7219
Janie Vickerman Pacific Northwest National Laboratory Yes Interested Party janie.vickerman@pnnl.gov (509) 371-7260
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Measures Completed as Needed B: 165. Obtain necessary permits 04/30/2027
Electrofishing to collect Bull Trout below Albeni Falls Dam C: 157. Electrofishing to collect bull trout below Albeni Falls Dam 04/30/2027
Implant PIT tags into Westslope Cutthroat and bull trout for detection on PIT tag arrays upstream of Albeni Falls Dam D: 158. Implant PIT tags into Bull Trout and Westslope Cutthroat trout for detection on PIT tags arrays upstream of Albeni Falls Dam 04/30/2027
Transport Bull trout above Albeni Falls Dam E: 28. Transport bull trout above Albeni Falls Dam 04/30/2027
Genetic analysis of Bull trout biopsy samples F: 157. Genetic analysis of bull trout biopsy samples 04/30/2027
Produce accessible, error-checked datasets G: 157. Determine the proportion of migratory Westslope Cutthroat Trout produced in the lower Priest River and evaluate biotic and abiotic factors that may influence the production of these fish. 04/30/2027
Produce accessible, error-checked datasets H: 157. Determine genetic structure, hybridization, and natal stream origin of Westslope Cutthroat Trout 04/30/2027
Produce accessible, error-checked datasets I: 157. Compile electronic spreadsheet database of electrofishing data 04/30/2027
Produce accessible, error-checked datasets J: 157. Evaluation of the status of Mountain Whitefish in the Priest and Pend Oreille Rivers 04/30/2027
Data reduction and analysis K: 162. Data reduction and analysis 04/30/2027
Completed Progress (Annual) Report L: 132. Submit Annual Report for the period (5/1/2024) to (4/30/2025) 04/30/2027
Project coordination M: 189. Project coordination 04/30/2027
Effective implementation management and timely contract administration N: 119. Manage Project 04/30/2027

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Westslope (O. c. lewisi)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 28 Trap and Haul
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Whitefish, Mountain (Prosopium williamsoni)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Obtain necessary permits
C 157 Electrofishing to collect bull trout below Albeni Falls Dam 03/04/2025
D 158 Implant PIT tags into Bull Trout and Westslope Cutthroat trout for detection on PIT tags arrays upstream of Albeni Falls Dam 03/04/2025
E 28 Transport bull trout above Albeni Falls Dam 03/04/2025
F 157 Genetic analysis of bull trout biopsy samples 03/04/2025
G 157 Determine the proportion of migratory Westslope Cutthroat Trout produced in the lower Priest River and evaluate biotic and abiotic factors that may influence the production of these fish. 03/04/2025
H 157 Determine genetic structure, hybridization, and natal stream origin of Westslope Cutthroat Trout 03/04/2025
I 157 Compile electronic spreadsheet database of electrofishing data 03/04/2025
J 157 Evaluation of the status of Mountain Whitefish in the Priest and Pend Oreille Rivers 03/04/2025
K 162 Data reduction and analysis
L 132 Submit Annual Report for the period (5/1/2024) to (4/30/2025)
M 189 Project coordination
N 119 Manage Project