| Province | Subbasin | % |
|---|---|---|
| Columbia Cascade | Entiat | 25.00% |
| Methow | 25.00% | |
| Okanogan | 25.00% | |
| Wenatchee | 25.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Environmental compliance requirements complete | A: 165. Obtain Required Permits, Authorizations, and Documentation as necessary for the Lower Methow Design Project | 08/31/2022 | 08/31/2022 | |
| Effective implementation management and timely contract administration | B: 119. Manage BPA Contracting Requirements | 08/31/2022 | 08/31/2022 | |
| Complete Permit-ready Design for Miller Hole Project | C: 175. Project Design Development and Coordination | 08/31/2022 | ||
| Develop or update (out-year) prioritized Habitat Project list: upload to Pisces | D: 114. Identify and Select Projects for Conceptual Design | 08/31/2022 | 08/31/2022 | |
| Lower Methow coordination with stakeholders, interested public, and cooperating entities | E: 191. Watershed Stakeholder Coordination and Outreach | 08/31/2022 | 08/31/2022 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
| Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Obtain Required Permits, Authorizations, and Documentation as necessary for the Lower Methow Design Project | |||||||
| B | 119 | Manage BPA Contracting Requirements | |||||||
| C | 175 | Project Design Development and Coordination | 09/01/2021 | ||||||
| D | 114 | Identify and Select Projects for Conceptual Design | |||||||
| E | 191 | Watershed Stakeholder Coordination and Outreach | |||||||
| F | 185 | Periodic Status Reports for BPA | |||||||
| G | 132 | No Report Required Per COR |