| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Deliverable: M. Cultural Resource clearance complete | B: 165. Complete Environmental Compliance Requirements & Tribal/Cultural Surveys | 12/31/2023 | 12/31/2023 | |
| Effective implementation management and timely contract administration | C: 119. Project Administration & Assist Fisheries department | 12/31/2023 | 12/31/2023 | |
| Roads maintained | D: 38. Improve roads on mitigation site | 12/31/2023 | 06/30/2023 | |
| Diversion dam structure annual maintenance | E: 186. Work on diversion dam structure | 12/31/2023 | 06/30/2023 | |
| Fence maintained | F: 186. Maintain Fence | 12/31/2023 | 12/31/2023 | |
| Maintain wet meadow irrigation system | H: 198. Maintain Wet Meadow Irrigation and Basic Ditch Maintenance | 12/31/2023 | 12/31/2023 | |
| Access created and culvert replaced | I: 38. South-Upper Wetland Ditch Maintenance and Access Creation | 12/31/2023 | 12/31/2023 | |
| Planting complete | J: 47. Till, Spray and Seed fields | 12/31/2023 | 12/31/2023 | |
| Collect and propagate seeds and stem cuttings for out plantings | K: 98. Collect seed and cuttings for propagation | 12/31/2023 | 06/01/2023 | |
| Produce accessible, error-checked datasets | L: 157. Conduct Project Field Surveys | 12/31/2023 | 12/31/2023 | |
| Conduct nest box study | M: 158. Band nestlings and adults from nest box study | 12/31/2023 | 12/31/2023 | |
| Starlings and house sparrows removed | N: 190. Remove European Starlings and House Sparrows | 12/31/2023 | 06/30/2023 | |
| Weed Control | O: 198. Weed Control | 12/31/2023 | 12/31/2023 | |
| Plant upland plants in problem areas | P: 47. Plant upland vegetation in invaded/burned areas | 12/31/2023 | 12/31/2023 | |
| Conservation Reserve Enhancement Program Maintenance | Q: 198. Cost share: Conservation Reserve Enhancement Program Maintenance | 12/31/2023 | 06/25/2023 | |
| Road maintained | R: 33. Improve bridge access road | 12/31/2023 | 12/31/2023 | |
| Access controlled | S: 188. Control Access | 12/31/2023 | 06/30/2023 | |
| Community education and information | T: 99. Public Education and Information | 12/31/2023 | 12/31/2023 | |
| Tribal education complete | U: 99. Tribal Community Education | 12/31/2023 | 12/31/2023 | |
| Completed Annual Report | V: 132. Submit Annual Report for 1/1/2022 to 12/31/2022 | 06/05/2023 | 06/05/2023 | |
| Prepare Data for 2023 Annual Report | W: 132. Prepare data for draft annual report for period 1/2023 to 12/2023 | 12/31/2023 | ||
| Storage container placed | X: 201. Install cargo container to hold project equipment | 12/31/2023 | 12/31/2023 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Wildlife |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | |||||||
| B | 165 | Complete Environmental Compliance Requirements & Tribal/Cultural Surveys | |||||||
| C | 119 | Project Administration & Assist Fisheries department | |||||||
| D | 38 | Improve roads on mitigation site | 01/01/2023 | ||||||
| E | 186 | Work on diversion dam structure | 01/01/2023 | ||||||
| F | 186 | Maintain Fence | 01/01/2023 | ||||||
| G | 186 | Maintain Corral | 01/01/2023 | ||||||
| H | 198 | Maintain Wet Meadow Irrigation and Basic Ditch Maintenance | 01/01/2023 | ||||||
| I | 38 | South-Upper Wetland Ditch Maintenance and Access Creation | 04/03/2023 | ||||||
| J | 47 | Till, Spray and Seed fields | 04/03/2023 | ||||||
| K | 98 | Collect seed and cuttings for propagation | 03/29/2023 | ||||||
| L | 157 | Conduct Project Field Surveys | 08/19/2022 | ||||||
| M | 158 | Band nestlings and adults from nest box study | 08/19/2022 | ||||||
| N | 190 | Remove European Starlings and House Sparrows | 08/19/2022 | ||||||
| O | 198 | Weed Control | 04/03/2023 | ||||||
| P | 47 | Plant upland vegetation in invaded/burned areas | 04/03/2023 | ||||||
| Q | 198 | Cost share: Conservation Reserve Enhancement Program Maintenance | 08/19/2022 | ||||||
| R | 33 | Improve bridge access road | 08/19/2022 | ||||||
| S | 188 | Control Access | 08/19/2022 | ||||||
| T | 99 | Public Education and Information | |||||||
| U | 99 | Tribal Community Education | |||||||
| V | 132 | Submit Annual Report for 1/1/2022 to 12/31/2022 | |||||||
| W | 132 | Prepare data for draft annual report for period 1/2023 to 12/2023 | |||||||
| X | 201 | Install cargo container to hold project equipment | 10/02/2023 |