| 56662 REL 275: 1997-051-00 EXP YAKIMA BASIN HABITAT FY23 |
|
* Expenditures data includes accruals and are based on data through 31-Oct-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Completed Annual Report | B: 132. YKFP Habitat Project Annual Report (3/1/24-02/28/25) | 02/28/2025 | 02/28/2025 | |
| Effective implementation management and timely contract administration | C: 119. Project Management | 02/28/2025 | 02/28/2025 | |
| Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish | D: 114. Identify and select projects | 09/29/2024 | 09/27/2024 | |
| EC complete | E: 165. Environmental Compliance | 02/28/2025 | 02/28/2025 | |
| Technical review complete | F: 122. YKFP Habitat, Water and Passage Technical Review Activities | 02/28/2025 | 02/28/2025 | |
| Maintenence compete | G: 186. Maintain Habitat Projects | 02/28/2025 | 02/28/2025 | |
| Submit herbicide report | H: 198. Habitat Parcel Vegetation Management | 02/28/2025 | 02/28/2025 | |
| Crack Willow removed | I: 199. Pott Road invasive crack willow removal | 02/28/2025 | 02/28/2025 | |
| Fence Built | J: 40. Fortune Habitat Protection | 02/28/2025 | ||
| Completed building or facility | K: 201. Sampson barn renovation | 02/28/2025 | ||
| Beaver relocation report | L: 190. Beaver Management | 02/28/2025 | ||
| Assessment Complete | M: 115. Naches River RM 18 Reach Assessment | 02/28/2025 | ||
| Assessment Complete | N: 115. Upper Cle Elum River Assessment | 02/28/2025 | ||
| Design process complete. | O: 175. Ahtanum Village RM 5.4 Final Design | 02/28/2025 | ||
| Final Designs | P: 175. WF Teanaway RM 5.2 to RM 8 | 02/28/2025 | ||
| Final designs | Q: 175. Yakima River Frogs Home RM 108 | 02/28/2025 | 02/28/2025 | |
| Final designs. | R: 175. Taneum Creek RM 5 Phase I Final Design | 02/28/2025 | 02/28/2025 | |
| Final designs | S: 175. Taneum Creek RM 5 Phase II Final Design | 02/28/2025 | ||
| Final Designs. | T: 175. Tieton River Spawning Gravel Supplementation | 02/28/2025 | ||
| Spawning gravel placed in Tieton River. | U: 29. Tieton River Spawning Gravel Supplementation | 02/28/2025 | ||
| Restoration complete. | V: 29. Tieton River Habitat Enhancement RM 4.2 | 02/28/2025 | 02/28/2025 | |
| Phase 1 Restoration completed | X: 29. SF Cowiche RM 9.5 Van Wyk, Floodplain Restoration Phase 1 | 02/28/2025 | ||
| Year 2 Restoration completed. | Y: 29. SF Manastash headwaters at Frost Meadows | 02/28/2025 | 11/30/2024 | |
| Materials procured. | Z: 29. Procurement of materials for pre-implementation | 02/28/2025 | ||
| Pre-acquisition activities completed | AA: 172. Currier Creek RM 0 Acquisition | 02/28/2025 | ||
| Complete assessment | AB: 115. Ahtanum Assessment | 02/28/2025 | 02/28/2025 | |
| Complete project concepts (typically 15% design) | AC: 175. Upper Cle Elum River RM 15.3 15% Design | 02/28/2025 | 02/28/2025 | |
| Concept Alternatives complete | AD: 175. SF Cowiche Aquatic Restoration RM 9.6 – 10.3 | 02/28/2025 | 02/28/2025 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
| Coho (O. kisutch) - Unspecified Population |
|
| Sockeye (O. nerka) - Other |
|
| Steelhead (Oncorhynchus mykiss) - All Populations |
|
| Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
| Lamprey, Pacific (Entosphenus tridentata) |
|
| Trout, Bull (S. confluentus) (Threatened) |
|
| Trout, Rainbow (Oncorhynchus mykiss) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | |||||||
| B | 132 | YKFP Habitat Project Annual Report (3/1/24-02/28/25) | |||||||
| C | 119 | Project Management | |||||||
| D | 114 | Identify and select projects | |||||||
| E | 165 | Environmental Compliance | |||||||
| F | 122 | YKFP Habitat, Water and Passage Technical Review Activities | |||||||
| G | 186 | Maintain Habitat Projects | 08/19/2024 | ||||||
| H | 198 | Habitat Parcel Vegetation Management | 08/19/2024 | ||||||
| I | 199 | Pott Road invasive crack willow removal | 08/19/2024 | ||||||
| J | 40 | Fortune Habitat Protection | |||||||
| K | 201 | Sampson barn renovation | 06/01/2023 | ||||||
| L | 190 | Beaver Management | |||||||
| M | 115 | Naches River RM 18 Reach Assessment | 03/01/2024 | ||||||
| N | 115 | Upper Cle Elum River Assessment | 03/01/2024 | ||||||
| O | 175 | Ahtanum Village RM 5.4 Final Design | 03/01/2024 | ||||||
| P | 175 | WF Teanaway RM 5.2 to RM 8 | 03/01/2024 | ||||||
| Q | 175 | Yakima River Frogs Home RM 108 | 03/01/2024 | ||||||
| R | 175 | Taneum Creek RM 5 Phase I Final Design | 03/01/2024 | ||||||
| S | 175 | Taneum Creek RM 5 Phase II Final Design | 03/01/2024 | ||||||
| T | 175 | Tieton River Spawning Gravel Supplementation | 03/01/2024 | ||||||
| U | 29 | Tieton River Spawning Gravel Supplementation | |||||||
| V | 29 | Tieton River Habitat Enhancement RM 4.2 | 12/11/2024 | ||||||
| W | 29 | SF Meadow Beaver Dam Analogs, SF Taneum RM 3.7 | |||||||
| X | 29 | SF Cowiche RM 9.5 Van Wyk, Floodplain Restoration Phase 1 | 10/04/2024 | ||||||
| Y | 29 | SF Manastash headwaters at Frost Meadows | 08/23/2024 | ||||||
| Z | 29 | Procurement of materials for pre-implementation | |||||||
| AA | 172 | Currier Creek RM 0 Acquisition | |||||||
| AB | 115 | Ahtanum Assessment | 03/01/2024 | ||||||
| AC | 175 | Upper Cle Elum River RM 15.3 15% Design | 03/01/2024 | ||||||
| AD | 175 | SF Cowiche Aquatic Restoration RM 9.6 – 10.3 | 03/01/2024 |