Province | Subbasin | % |
---|---|---|
Columbia Plateau | Yakima | 100.00% |
Previous: | Next: |
---|---|
94116: 1997-051-00 EXP FY24 YAKIMA BASIN HABITAT |
* Expenditures data includes accruals and are based on data through 28-Feb-2025.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Completed Progress (Annual) Report | B: 132. YKFP Habitat Project Annual Report (3/1/25-02/28/26) | 02/28/2026 | ||
Effective implementation management and timely contract administration | C: 119. Project Management | 02/28/2026 | ||
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish | D: 114. Identify and select projects | 09/29/2025 | ||
EC complete. | E: 165. Environmental Compliance | 02/28/2026 | ||
Technical review complete. | F: 122. YKFP Habitat, Water and Passage Technical Review Activities | 02/28/2026 | ||
Maintain habitat projects | G: 186. Maintain Habitat Projects | 02/28/2026 | ||
Implement vegetation maintenance activity | H: 198. Habitat Parcel Vegetation Management | 02/28/2026 | ||
Provide metrics on installed fence. | I: 40. Fortune/Harris Habitat Protection | 12/01/2025 | ||
Completed building or facility | J: 201. Sampson barn renovation | 02/28/2026 | ||
Beaver relocation report | K: 190. Beaver Management | 02/28/2026 | ||
Upload final approved design plan set and basis of design | L: 175. Ahtanum Village RM 5.4 Final Design | 05/31/2025 | ||
60% designs | M: 175. WF Teanaway RM 5.2 to RM 6.85 | 02/28/2026 | ||
15% Conceptual designs. | N: 175. Yakima River Frogs Home RM 108 | 02/28/2026 | ||
Final Designs | O: 175. Tieton River Spawning Gravel Supplementation | 02/28/2026 | ||
Construction complete | P: 29. Tieton River Spawning Gravel Supplementation | 02/28/2026 | ||
Provide final metrics | Q: 29. Tieton River Habitat Enhancement RM 4.2 | 06/15/2025 | ||
Construction complete | R: 29. SF Cowiche RM 9.5 Van Wyk, Floodplain Restoration Phase 1 | 02/28/2026 | ||
Construction complete | S: 29. SF Manastash headwaters at Frost Meadows RM 14.6 | 02/28/2026 | ||
Materials procured. | T: 29. Procurement of materials for pre-implementation | 02/28/2026 | ||
Baseline documentation report | U: 172. Currier Creek RM 0 Acquisition | 02/28/2026 | ||
30% design | V: 175. SF Cowiche Aquatic Restoration RM 9.6 – 10.3 | 02/28/2026 | ||
NEPA scoping complete | W: 175. Upper Cle Elum River RM 15.3 Design | 02/28/2026 | ||
Upload final approved design plan set and basis of design | X: 175. Taneum Creek RM 5 Phase II Final Design | 02/28/2026 | ||
Develop and submit project concepts (typically 15% design) for review | Y: 175. Buckskin Slough Off-Channel Habitat Fish Passage Design RM 3.3 | 02/28/2026 | ||
Phase I construction complete. | Z: 29. Taneum RM 5 Phase I Construction | 02/28/2026 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Coho (O. kisutch) - Unspecified Population |
|
Sockeye (O. nerka) - Other |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Trout, Rainbow (Oncorhynchus mykiss) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 132 | YKFP Habitat Project Annual Report (3/1/25-02/28/26) | |||||||
C | 119 | Project Management | |||||||
D | 114 | Identify and select projects | |||||||
E | 165 | Environmental Compliance | |||||||
F | 122 | YKFP Habitat, Water and Passage Technical Review Activities | |||||||
G | 186 | Maintain Habitat Projects | |||||||
H | 198 | Habitat Parcel Vegetation Management | |||||||
I | 40 | Fortune/Harris Habitat Protection | |||||||
J | 201 | Sampson barn renovation | 06/01/2023 | ||||||
K | 190 | Beaver Management | |||||||
L | 175 | Ahtanum Village RM 5.4 Final Design | |||||||
M | 175 | WF Teanaway RM 5.2 to RM 6.85 | |||||||
N | 175 | Yakima River Frogs Home RM 108 | |||||||
O | 175 | Tieton River Spawning Gravel Supplementation | |||||||
P | 29 | Tieton River Spawning Gravel Supplementation | |||||||
Q | 29 | Tieton River Habitat Enhancement RM 4.2 | |||||||
R | 29 | SF Cowiche RM 9.5 Van Wyk, Floodplain Restoration Phase 1 | |||||||
S | 29 | SF Manastash headwaters at Frost Meadows RM 14.6 | |||||||
T | 29 | Procurement of materials for pre-implementation | |||||||
U | 172 | Currier Creek RM 0 Acquisition | |||||||
V | 175 | SF Cowiche Aquatic Restoration RM 9.6 – 10.3 | |||||||
W | 175 | Upper Cle Elum River RM 15.3 Design | |||||||
X | 175 | Taneum Creek RM 5 Phase II Final Design | |||||||
Y | 175 | Buckskin Slough Off-Channel Habitat Fish Passage Design RM 3.3 | |||||||
Z | 29 | Taneum RM 5 Phase I Construction |