| Effective implementation management and timely contract administration |
B: 119. Perform project management and administrative duties |
|
12/31/2025 |
|
| Confidential Water Rights Evaluation |
E: 154. Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152 |
|
12/31/2025 |
|
| Permit Level and Final Designs for the Methow Basin EWD Instream Flow Project |
F: 175. Methow Basin EWD Instream Flow Project - Eng. and Design Phase 3 & 4 - 2015-152 |
|
12/31/2025 |
|
| Permit Level and Final Designs and Report for the W2 Foghorn Project Area |
G: 175. W2 Foghorn Reach Design Phases 3 and 4 - 2023-219 |
|
12/31/2025 |
|
| Conceptual Designs and Report for the 1890s Outlet Project |
H: 175. 1890s Outlet Conceptual Design - 2011-65 |
|
12/31/2025 |
|
| Conceptual Designs and Report for the Two Channels Area |
I: 175. Two Channels Conceptual Design - 2011-89 |
|
12/31/2025 |
|
| Final Reach Assessment Report Completed |
J: 115. Methow River Reach Assessment Updates (Big Valley & M2) - 2023-220 |
|
12/31/2025 |
|
| Nason Creek N1 DOT Permit and Construction Level Designs |
K: 175. Nason Creek N1 DOT Design Phase 3 and 4 - 2018-198 |
|
12/31/2025 |
|
| Draft and Final Construction Plan for the Upper Nason Phase 3 Project |
L: 175. Upper Nason Creek Side Channel Redesign Phases 3 & 4 2020-207 |
|
12/31/2025 |
|
| Lower Chiwawa Big Meadow Permit and Construction Level Designs |
M: 175. Lower Chiwawa Big Meadow (Areas B and C) Phases 3 and 4 - 2021-214 |
|
12/31/2025 |
|
| Complete Groundwater Testing |
N: 208. Lower Chiwawa Big Meadow (Areas B and C) Groundwater Testing 2021-214 |
|
12/31/2025 |
|
| Conceptual Designs Report for the Nason Creek Gill Creek Reconnection Project |
O: 175. Nason Creek Gill Creek Reconnection Conceptual Design - 2024-223 |
|
12/31/2025 |
|
| Conceptual Designs Report for the White River Conceptual Design (CDLT) Project |
P: 175. White River CDLT Conceptual Design - 2024-224 |
|
12/31/2025 |
|
| Nason Creek, Icicle Creek, Chiwaukum Creek, and White River reports completed |
Q: 115. Wenatchee Subbasin Reach Assessments (Nason Creek, Icicle, White River, Chiwaukum) - 2023-221 |
|
12/31/2025 |
|
| Permit and Construction Level Designs for the Mad River Outlet Project Area |
R: 175. Mad River Outlet Design Phases 3 & 4 - 2021-215 |
|
12/31/2025 |
|
| Confidential Water Rights Evaluation |
S: 154. Entiat Basin MRO Instream Flow Project - Water Rights Consulting 2022-217 |
|
12/31/2025 |
|
| Alternative Water Delivery Feasibility Assessment |
T: 175. Entiat Basin MRO Instream Flow Project - Eng. Feasibility Assessment 2022-217 |
|
12/31/2025 |
|
| Complete Groundwater Testing |
U: 208. Entiat Basin MRO Instream Flow Project Groundwater Testing 2022-217 |
|
12/31/2025 |
|
| Draft Construction Plan for the Entiat 3D CDLT Project Area |
V: 175. Entiat 3D CDLT Design Phase 3 - 2019-210 |
|
12/31/2025 |
|
| Complete Groundwater Testing |
W: 208. Entiat 3D CDLT Design Phase 3 Groundwater Testing - 2024-225 |
|
12/31/2025 |
|
| Final Reach Assessment Report Completed |
X: 115. Middle Entiat Reach Assessment Updates (Grey, Stormy, Preston Reaches) - 2023-222 |
|
12/31/2025 |
|
| Construction Management Complete |
Y: 100. Newby Narrows Oversight 2015-153 |
|
12/31/2025 |
|
| Side Channel Restoration and Large Wood Habitat added into 0.3 miles of the Twisp River. |
Z: 30. Newby Narrows Construction 2015-153 |
|
12/31/2025 |
|
| Complete Side Channel Adaptive Management Activities |
AA: 186. Methow Side Channels Adaptive Management (Chewuch WDFW & Newby) 2024-225 |
|
09/01/2025 |
09/01/2025 |
| Construction Management Complete |
AB: 100. Lower Wenatchee River Reach 3 Oversight - 2017-186 |
|
12/31/2025 |
|
| Construction Management Complete |
AD: 100. Lower Chiwawa USFS (Area G) Phase 2 Oversight 2021-214 |
|
12/31/2025 |
|
| Side Channel Restoration and Large Wood Habitat added into 0.7 miles of the Chiwawa River |
AE: 30. Lower Chiwawa USFS (Area G) Phase 2 Construction 2021-214 |
|
12/31/2025 |
|