| Effective implementation management and timely contract administration |
B: 119. Perform project management and administrative duties |
|
12/31/2026 |
|
| 15% Through 30% Designs and Reports for M2 W2 Reach Projects |
C: 175. M2 W2 Conceptual Designs (Fog Horn 2, Big Valley) 2025-226 |
|
12/31/2026 |
|
| Complete Groundwater Testing |
D: 208. Foghorn Project Groundwater Testing 2023-219 |
|
12/31/2026 |
|
| 30% Through 80% Designs and Reports for M2 LRT Projects |
E: 175. M2 LRT Designs (1890s, 2 Channels) 2025-233 |
|
12/31/2026 |
|
| Confidential Water Rights Evaluation |
F: 154. Methow Basin EWD Instream Flow Project - Water Rights Consulting 2015-152 |
|
12/31/2026 |
|
| Permit Level and Final Designs for the Methow Basin EWD Instream Flow Project |
G: 175. Methow Basin EWD Instream Flow Project - Eng. and Design Phase 3 & 4 - 2015-152 |
|
12/31/2026 |
|
| Complete Groundwater Testing |
H: 208. Methow Basin EWD Instream Flow Project - Groundwater Testing - 2015-152 |
|
12/31/2026 |
|
| Conceptual Designs and Report for the Early Winters Creek USFS Project Area |
I: 175. Early Winters Creek USFS Conceptual Designs - 2014-117 |
|
12/31/2026 |
|
| Permit Level and Final Designs and Report for the Wolf Creek USFS Project Area |
J: 175. Wolf Creek USFS Design Phase 3 & 4 - 2021-213 |
|
12/31/2026 |
|
| Permit Level and Final Designs and Report for the Chewuch River Right Project Area |
K: 175. Chewuch River Right (WDFW) Phase 2 Design 2011-74 |
|
12/31/2026 |
|
| Updated Review of Designs for the Eight Mile Barrier Removal Project |
L: 175. Eight Mile Barrier Removal Designs 2015-141 |
|
12/31/2026 |
|
| Field Surveys and Habitat Data Assessment for the Goat Creek Reach Assessment |
M: 115. Goat Creek Reach Assessment 2025-227 |
|
12/31/2026 |
|
| Chiwawa Areas B and C Permit and Construction Level Designs |
N: 175. Lower Chiwawa Big Meadow (Areas B and C) Design Phases 3 and 4 - 2021-214 |
|
12/31/2026 |
|
| Complete Groundwater Testing |
O: 208. Lower Chiwawa Big Meadow (Areas B and C) Groundwater Testing - 2021-214 |
|
12/31/2026 |
|
| Nason Creek N1 DOT Permit and Construction Level Designs |
P: 175. Nason Creek N1 DOT Design Phase 3 and 4 - 2018-198 |
|
12/31/2026 |
|
| 30% Through 80% Designs and Reports for the Upper Nason Phase 3 Project |
Q: 175. Upper Nason Creek Side Channel Redesign Phases 3 2020-207 |
|
12/31/2026 |
|
| 15% Through 30% Designs and Reports for Lower Nason Creek Reach Projects |
R: 175. Nason Creek Conceptual Designs (RM 9, Gill Crk, Knifeshop) 2025-228 |
|
12/31/2026 |
|
| Fifty-Mile Permit and Construction Level Designs |
S: 175. Upper Wenatchee 50 Mile Designs 2025-229 |
|
12/31/2026 |
|
| Conceptual Designs and Report for the Chiwaukum DOT Area |
T: 175. Chiwaukum Creek DOT Designs 2025-230 |
|
12/31/2026 |
|
| Conceptual Designs Report for the White River Conceptual Design (CDLT) Project |
U: 175. White River CDLT Conceptual Design - 2024-224 |
|
12/31/2026 |
|
| Conceptual Designs Report for the Icicle Creek USFS Project |
V: 175. Icicle Creek USFS Designs 2025-231 |
|
12/31/2026 |
|
| Draft Construction Plan for the Entiat 3D CDLT Project Area |
W: 175. Entiat 3D CDLT Design Phase 3 - 2019-210 |
|
12/31/2026 |
|
| Complete Groundwater Testing |
X: 208. Entiat 3D CDLT Design Phase 3 Groundwater Testing - 2024-225 |
|
12/31/2026 |
|
| Conceptual Designs Report for the Entiat Stillwater Project |
Y: 175. Entiat Stillwaters Design Phase 2 - 2019-210 |
|
12/31/2026 |
|
| Permit and Construction Level Designs for the Mad River Outlet Project Area |
Z: 175. Mad River Outlet Design Phases 3 & 4 - 2021-215 |
|
12/31/2026 |
|
| Confidential Water Rights Evaluation |
AA: 154. Entiat Basin MRO Instream Flow Project - Water Rights Consulting 2022-217 |
|
12/31/2026 |
|
| Alternative Water Delivery Feasibility Assessment |
AB: 175. Entiat Basin MRO Instream Flow Project - Eng. Feasibility Assessment 2022-217 |
|
12/31/2026 |
|
| Complete Groundwater Testing |
AC: 208. Entiat Basin MRO Instream Flow Project Groundwater Testing 2022-217 |
|
12/31/2026 |
|
| Field Surveys and Habitat Data Assessment for the Whiskey-Dick / Skookumchuck Quilomene-Brushy Reach Assessment |
AD: 115. Whiskey-Dick / Skookumchuck / Quilomene-Brushy Reach Assessments 2025-232 |
|
12/31/2026 |
|
| Construction Management Complete |
AE: 100. W2 Foghorn Reach Phase 1 Construction Oversight - 2023-219 |
|
12/31/2026 |
|
| Large Wood Habitat added into 0.5 miles of the Methow River |
AF: 29. W2 Foghorn Reach Phase 1 Construction - 2023-219 |
|
12/31/2026 |
|
| Construction Management Complete |
AG: 100. Lower Chiwawa USFS (Area G) Phase 2 Oversight 2021-214 |
|
12/31/2026 |
|
| Side Channel Restoration and Large Wood Habitat added into 0.7 miles of the Chiwawa River |
AH: 30. Lower Chiwawa USFS (Area G) Phase 2 Construction 2021-214 |
|
12/31/2026 |
|